Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Determination Of The Optimum Lifetime Of A Mining Project Using Discounted Cash Flow And Option Pricing Techniques (PREPRINT NUMBER 92-28)
By B. W. Cavender
The operating lifetime, or production rate, selected for a mining project is among the most important factors influencing the design and ultimate economic success of the project. An incorrectly-determ
Jan 1, 1992
-
Efficiency of Carbon Sorbents in Removing Zinc from Mine Water: A Comparative Case Study of the Rothschönberger Stolln Water - SME Annual Meeting 2024
By Marlies Grimmer, Frank Amo Boateng
One of the challenges of mining is the concentration of heavy metals it releases into the environment through a phenomenon called Acid Mine Drainage. Freiberg is no exception due to its long mining ac
Feb 1, 2024
-
Construction Of Straight Creek Tunnel, Colorado
By R. C. Hopper, A. A. Mathews, T. A. Lang
DESCRIPTION OF PROJECT The Straight Creek Tunnel site is located approximately sixty (60) miles west of Denver, Colorado, on Interstate Route 70 in the vicinity of Loveland Pass, in the Rocky Mount
Jan 1, 1997
-
A Basic Factor Estimate Of The Land Area In Alabama Excavated On The Surface For Coal Prior To 1970
By Reynold Q. Shotts
One often sees in the papers, in these days of ecological consciousness, estimates of the quantity of land that has been "devasted," "ruined," or "destroyed," by surface or strip mining, especially fo
Jan 1, 1973
-
A Review Of Alluvial Overburden Stripping Methods ? Introduction
By Robert E. Thurmond
With modern exploration techniques, it seems likely that an increasing number of the orebodies to be found in the future will be under alluvial fans or valley fill. As a result, a larger proportion of
Jan 1, 1963
-
Strategic Planning Model At White Springs, Florida Phosphate Mining And Chemical Operations (a73e6a92-1d4b-452c-97fa-9024b63d70d3)
By J. T. Crawford
A comprehensive strategic planning model has been developed for the phosphate strip mining and chemical operations at White Springs, Florida. The computerized model covers ore body modeling, productio
Jan 1, 1997
-
Case Study – PVC Ventilation Duct Ventilating Underground Mining Operation
By T. Weatherwax, A. Rai, J. Poor
"This paper provides an overview of the current use of auxiliary ventilation products and the challenges with limited air quantity in dead-end entry or working faces. The PVC’s low frictional factor,
Jan 1, 2016
-
Application of Computer Modeling to the Environmental Remediation of the Berkeley Open Pit Copper Mine, Butte, Montana
By Marek Wilczewski, Kristine Uhlman, Darrel Sipe
With the end of active copper mining in 1983, the extensive underground mine workings and the Berkeley Pit, one of the largest open-pit mines in the United States, began to flood. Daily in- flow to th
Jan 1, 1996
-
Reflected Light Microscopy And Electron Microprobe Analysis Of Feeds And Products From The Laboratory Flash Smelting Of Copper Sulfide Concentrates
By Susanne Pignolet-Brandom
Flash smelting products of a copper sulfide concentrate collected at successive levels in an experimental reactor have been studied by reflected light microscopy, scanning electron microscope - energy
Jan 1, 1985
-
Heavy Mineral Deposits Of The Fox Hills Formation Located Near Limon, CO
By F. L. Pirkle
A heavy mineral deposit about 1.6 km (1 mile) in length, 0.13 km (0.08 mile) in width and averaging about 3 m (10 ft) in thickness is exposed approximately 130 km (80 miles) east of Denver, along Inte
Jan 1, 2012
-
Flood Resilience for San Francisco - RETC2023
By Eva K. Fernandez, Paul Y. Louie, Derek S. Adams, Renée L. Fippin
The Folsom Area Stormwater Improvement Project is part of SFPUC’s flood resilience efforts under the Sewer System Improvement Program. This 4,000-foot-long, 12-footinside- diameter tunnel will help re
Jun 13, 2023
-
Conventional Excavation of New Inlet/Outlet Tunnel for Newell Creek Dam, CA - NAT2022
By Kexin Cai, Isidro Rivera, Shawna Von Stockhausen, Maria Chastka, Kevin Huynh
The Newell Creek Dam Inlet/Outlet Replacement Project is located approximately 11 miles north of Santa Cruz, California along Highway 9 in the San Lorenzo Valley. This project will replace the existin
Dec 1, 2022
-
SAMARCO's 396 Km Pipeline A Major Step In Iron Ore Transportation
By Milton E. Jennings
On May 11, 1977, the SAMARCO 20-inch, 396-kilometer (246-mile) Pipeline was placed in service. This system represents the latest thinking in slurry pipeline design and is one of the main contributors
Jan 1, 1978
-
Shallow Seismic Reflection Study Of A Salt Dissolution Well Field Near Hutchinson, KS
By R. D. Miller, L. Schulte, J. Davenport, D. W. Steeples
Shallow seismic reflection methods were successfully used to delineate the subsurface extent of roof failure associated with the dissolution mining of a 120-m (400 ft) deep and 60-m (200ft) thick salt
Jan 1, 1994
-
Hydrocyclones
By D. T. Jr. Tarr
History of Development The hydrocyclone, probably because of its basic simplicity, has been used for various classification applications since before 1890. A patent was granted in the United State
Jan 1, 1985
-
Real‑time Photoacoustic Measurements of the Mass Concentration of Respirable Crystal Silica Dust: Theory
By Charles Kocsis, Pedro Nascimento, W. Patrick Arnott, Samuel J. Taylor
Respirable crystalline silica (RCS) is an inhalation health hazard for mining and industrial work environments and must be monitored. We provide theoretical analysis of real-time measurements for dete
Jul 31, 2022
-
Inflatable Partitions For High-Expansion Foam Generators (9f97e6c9-db8a-4bfd-b611-d995893f1b09)
By R. S. Conti
The US Bureau of Mines (USBM) has developed an inflatable feed-tube seal (IFTS) for high-expansion foam generators. The IFTS is a lightweight, portable, rectangular inflatable bag that can be used by
Jan 1, 1996
-
Homestake's Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies
By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani
The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine or the expansion of an existing mine can range from nine to 24 months, or even longer. The time
Jan 1, 2003
-
Fine Coal Dewatering
By Robert W. Row
The run-of-mine coals in the U.S. being fed to coal cleaning plants have become increasingly finer due to the adoption of modern, mechanized mining methods, and economics are dictating that finer frac
Jan 1, 1984
-
Preliminary Indications of Repeatability and Reproducibility of the ASTM 5744-96 Kinetic Test for Drainage pH and Sulfate Release Rate
By Kim A. Lapakko, William W. III White
The ASTM standard method D 5744-96 was developed to provide a well-defined kinetic test protocol, conducted under controlled reaction conditions, with the intent of generating reproducible results. Th
Jan 1, 2000