Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Design of Primary Ground Support during Roadway Development Using Empirical Databases

    By Ry Stone

    "There have been many design practices utilised within the coal mining industry to arrive at the minimum densities of primary ground support required during roadway development. This paper demonstrate

    Jan 1, 2015

  • SME-ICGCM
    Calibrating the LaModel Program for Shallow Cover Multiple? seam Mines

    By Morgan Sears

    The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca

    Jan 1, 2013

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    Assessment Of Wood And Alternative Materials For Supplemental Roof Support Construction

    By Thomas M. Barczak

    The engineering of a support system is driven largely by economics. The goal is to provide effective support at minimal cost. For this reason, wood has been extensively used as a support material for

    Jan 1, 1994

  • SME-ICGCM
    Numerical Modeling of Standing Support Performance in Entries between Longwall Gobs

    By Benjamin Mirabile

    "Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth

    Jan 1, 2015

  • SME-ICGCM
    To What Extent the Mechanical Properties of Coal Play Role in Coal Mine Bumps? A Comparison Between Bump and Non?Bump Prone Coal

    By Gamal Rashed

    Coal bump is a sudden manifestation of the release of strain energy stored in a coal pillar (Peng, 2008). It is a very serious mining hazard that adversely affects the safety and productivity of the m

    Jan 1, 2014

  • SME-ICGCM
    Hydraulic Tensioning Of A Birmingham Roof Truss

    By C. W. Bollier

    In recent years, Peabody Coal Company has enjoyed a great amount of success using roof trussing as a secondary support system. Since 1975, over 180,000 trusses have been installed in 12 different Peab

    Jan 1, 1982

  • SME-ICGCM
    Review and Estimation of the Hydraulic Conductivity of the Overburden above Longwall Panels. Experience from Australia

    By Winton Gale

    "The aim of this paper is to summarise the results and conclusions of Australian Coal Association Research Project (ACARP) Report Cl3013 which relate to water inflows into a mine which occur through t

    Jan 1, 2010

  • SME-ICGCM
    Use of a Plate Loading Device to Quantitatively Evaluate Weak Rock Mass Classifications in the Underground Gold Mines of Nevada USA

    By Raj R. Kallu

    Underground gold mines in Nevada are typically hosted in geologic zones with a wide range of geotechnical properties ranging from blocky competent rock to faulted and highly altered soil-like material

    Jan 1, 2014

  • SME-ICGCM
    Roof Behavior In South African Coal Room And Pillar Panels

    By Bruce W. Jack

    An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using

    Jan 1, 2000

  • SME-ICGCM
    Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled Stope

    By Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen

    "As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.

    Jan 1, 2018

  • SME-ICGCM
    Learning Our Geotechnical Limits and Pushing Our Longwalls Through Them

    By Richard N. Campbell

    The world?s ever-expanding demand for energy and coking coals has resulted in the underground mining industry looking at taking on increasingly marginal and geotechnically challenging deposits. The dr

    Jan 1, 2014

  • SME-ICGCM
    Letter Of Nomination - 26th International Conference on Ground Control in Mining

    By Christopher Mark

    Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl

    Jan 1, 2007

  • SME-ICGCM
    Considerations for Effective Ground Support in Evaporites

    By C. A. Vining, J. R. Nopola

    "Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can

    Jan 1, 2018

  • SME-ICGCM
    Sandy Creek Waterfall?Case Study of Successful Management of the Potential Impacts of Longwall Mining on a Sensitive Natural Surface Feature

    By Bruce K. Hebblewhite

    BHP Billiton Illawarra Coal operates Dendrobium Mine in an area 10-20km west-northwest of Wollongong in the Southern Coalfield of New South Wales, Australia. The mine recently completed longwall mini

    Jan 1, 2014

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • SME-ICGCM
    Calibrating LaModel for Subsidence

    By Keith A. Heasley, Jian Yang

    "LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He

    Jan 1, 2016

  • SME-ICGCM
    Controlling Subsidence Effects Using Partial Backfilling

    By Yingzin Zhou

    Partial backfilling can be used to reduce and control surface subsidence damage caused by longwall mining or pillaring operations in room-and-pillar mines. The use of partial backfill as opposed to to

    Jan 1, 1990

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • SME-ICGCM
    Determination of the Optimum Crown Pillar Thickness between Open Pit and Block Caving

    By Kourosh Shahriar, Kazem Oraee, Ezzeddin Bakhtavar

    "In this paper, a relationship between dependant parameters and the crown pillar thickness is first introduced. This relationship defines geotechnical problems caused by thin pillars and economic cons

    Jan 1, 2010