Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Changes In Seismic Measurements With Blast Induced Fracturing: A Field Experiment
By Clifford J. Roblee
In this paper, various seismic indicators are evaluated for ability to discern fractures induced into a rock mass by blasting. This is accomplished by presenting results from in situ crosshole seismic
Jan 1, 1989
-
Pressure Distribution Of 2-Leg Shield Supports (fb20894a-e0d3-49e8-b331-69176f4a54a3)
By Rao Pothini
Measurement of pressure distribution under the base plate of the Hemscheidt 2-leg 800-ton shield was performed underground for two shifts using 12 pressure cells installed in two rows, one each under
Jan 1, 1992
-
Status Of Longwall Research In CSIRO
By Michael Kelly
Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th
Jan 1, 2001
-
Design Considerations For Angle Bolters
By Charles D. Albright
FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie
Jan 1, 1982
-
Design Of A Roof Truss Bolting Plan For Bear Mine
By C. P. Mangelsdorf
Between June of 1975 and November of 1978 Stateham and Radcliffe of the Denver Research Center of the Bureau of Mines in cooperation with officials of the Bear Coal Company of Somerset. Colorado Condu
Jan 1, 1984
-
Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)
By Sun Henghu
This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn
Jan 1, 1992
-
Resin Annulus Size Effects On Rebar Bolt Pull Strength And Resin Loss To Fractured Rock
By Al Campoli
One of the critical variables affecting resin bolt performance is the size of the resin annulus, defined as the difference between the hole and bolt radius. The vast majority of the millions of resin
Jan 1, 1999
-
Analysis Of Roof Bolt Systems (80829435-dd55-4b61-96dd-df38d097e9ff)
By Christopher Mark
Despite more than half a century of experience with roof bolting, no design method has received wide acceptance. To begin to improve this situation, National Institute for Occupational Safety and Heal
Jan 1, 2001
-
A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003
By Dave Forrester
Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr
Jan 1, 2004
-
Evaluation of Rockburst Hazard from Core Testing
By Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
Load And Convergence Measurements In Longwall Faces And Design Guidelines For Face-Support Systems
By Reha Ozel
The stability in longwall faces depends on the interaction beman the roof strata, face supports and floor strata. The load distribution on the other hand, depends upon relative stiffness of the three
Jan 1, 1990
-
The Mechanical Property Of Coal Containing Gas (d5aeba01-a0db-4f86-a21e-adbcc6290eab)
By Yao Yuping
The strength and deformation of more than two hundred coal samples have been tested in the condition of triaxial compression. The regression equation showing the relationship between coal strength and
Jan 1, 1992
-
Measurement of Effects of Interaction and Influence on Mine Layout Design at Maltby Colliery
By J. S. Oram
Maltby Colliery, operated by RJB Mining (UK) Ltd is successfully mining the Parkgate seam in Yorkshire at a depth of 1000m using longwall retreat. Extraction in the Parkgate seam is influenced by inte
Jan 1, 1997
-
How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)
By A. Wahab Khair
This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance
Jan 1, 1992
-
Mine Planning For Longwall And Pillar Retreat Panels Subject To Seam Interaction Effects
By Thomas L. Vandergrift
Multiple-scam mining is becoming more common in the United States, especially in the East, where primary reserves arc being depleted, forcing mining companies to develop secondary seams, Although mine
Jan 1, 2000
-
Numerical Modeling Of Longwalls In Deep Coal Mines
By Salah Badr
Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar
Jan 1, 2003
-
Manifestation Of Mine Pressure And Its Relations To Overlying Strata Movements
By Z. C. Song
[THIS PAPER WAS TRANSLATED FROM CHINESE TO ENGLISH BY S. S. PENG, WEST VIRGINIA UNIVERSITY] Immediately after coal extraction, the pressure that causes the movement of the surrounding strata is c
Jan 1, 1982
-
Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall Areas
By Richard A. Allwes
A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano
Jan 1, 1986
-
Roof Control and Roadway Support Design in the #9 Coal Seam, Wuhushan Coal Mine, China
By Yundong Ma
In this paper the dynamic process of rock deformation and failure in the roadways of the #9 coal seam, Wuhushan Coal Mine by was simulated using the software "Rock Failure Process Analysis System (REP
Jan 1, 2005
-
A New Method For Longwall Pillar Design
By P. Tsang
In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed
Jan 1, 1993