Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Advanced Surveying Method For Measuring Roof ConvergenceBy M. Zaki Rashad
In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute
Jan 1, 1990
-
Remote Mining Using Water for Ground SupportBy Robert L. Schmidt
The support of underground openings by water is a natural phenomenon. Surface sinkholes, such as those that occur with some frequency in Florida, are attributed to a lowering of the water table result
Jan 1, 1986
-
New Design Criteria for Roof Bolt SystemsBy John C. Stankus
From research started six years ago, a new design criteria has been developed for mine roof bolt systems This design criteria precisely and quantitatively determines parameters such as bolt length, in
Jan 1, 1997
-
Mobile Roof Supports For Pillar Retreat MiningBy Robert P. Kudlawiec
The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th
Jan 1, 2000
-
Aerostatic Support System For Underground Coal MinesBy R. J. Morrell
The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra
Jan 1, 1988
-
Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall MineBy Kevin MacPherson
After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache
Jan 1, 1999
-
Ground Control Problem Associated with Longwall Mining of Developed PillarsBy T. N. Singh
Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems
Jan 1, 1984
-
Mathematical Modeling Of Strong Roof Beds In Longwall MiningBy Xiaolin Wu
Most coal bump occurrences in the U.S. are directly related to mining operations under strong roofs. An understanding of the behavior of bridging or cantilevering strong roofs over working longwall fa
Jan 1, 1993
-
Support Resistance And Roof Behaviour Of A Longwall Face With 4-Leg ShieldsBy S. S. Peng
The hydraulic powered supports have been employed in U. S. longwall mining for the past two decades. Yet the sciences of roof control at the powered supported faces remain largely unknown. In order to
Jan 1, 1982
-
Towards A Method Of Determining Floor Quality In An Underground Coal MineBy Jennifer Riefenberg
Underground coal mines often experience ground control problems related to weak floor. Developing a methodology for rating floor quality can aid in understanding and delineating ground hazards. U.S. B
Jan 1, 1995
-
Application of Tensioned Cable Bolts for Supplemental SupportBy Ben Mirabile, Alan Campoli, Rodney Poland
"The majority of U.S. underground coal mines use some form of cable bolt as supplemental support to a primary roof bolting system. Many coal operators employ the high load capacity of non-tensioned ca
Jan 1, 2010
-
Tension-Torque Relationship For Mechanical Anchored Roof BoltsBy H. N. Maleki
Tension-torque relationships were investigated *n a coal mine for bath standard 5/8 in. (16 mm) bolts and a vibrating wire instrumented bolt, using conventional and controlled installation techniques.
Jan 1, 1984
-
A Rock Mass Strength Concept For Coal SeamsBy George S. Kalamaras
Coal strata strength is included as a vague term in most of the pillar design formulas, either as a questionable fraction of the intact coal strength or a size-dependent relationship for scaling down
Jan 1, 1993
-
Use Of Polymer Grids For Longwall Shield RecoveryBy Brian E. Travis
The recent development of polymer grids for the underground coal mining industry has created new alternatives for supplemental ground control practices. The grids utilize strong, lightweight polymers
Jan 1, 1990
-
A New Rock Bolting Concept For Underground RoadwaysBy G. Skybey
The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the resi
Jan 1, 1992
-
Practical Rock Mechanics For Safety And Productivity ImprovementsBy M. Guana
Island Creek Corporation is predominately an underground mine operator deploying room-and-pillar and retreat longwall mining methods for extracting coal. Wide variations are encountered in overburden
Jan 1, 1988
-
Geological Sensing - The Key To Increasing Miner SafetyBy J. R. M. Hill
The U.S. Bureau of Mines is involved in research to improve geological sensing (or geo-sensing) techniques. This paper presents results from field trials of two research projects concerned with new te
Jan 1, 1992
-
The Coal Mine Roof Rating (CMRR) A Practical Rock Mass Classification For Coal MinesBy Gregory M. Molinda
The U.S. Bureau of Mines has developed a rock mass classification system for coal mine roof control. The Coal Mine Roof Rating System (CMRR) evaluates the structural competence of mine roof using simp
Jan 1, 1993
-
Geotechnical Planning Basis for the Optimization of WorkingsBy Nikolaos Polysos
Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio
Jan 1, 2003
-
Mining Under Rivers In Fuxin Coal MinesBy Liang Yin-Huai
In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.
Jan 1, 1990