Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Long-term Subsidence Over Longwall Chain Pillar Systems and Its Effects on Surface Structures

    By Yi You

    A research has been conducted to study the long-term subsidence and its possible effects on surface structures In this research, the surface movements in areas when potential for developing long-term

    Jan 1, 1997

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    Mining Under Strong Roof

    By K. Y. Haramy

    Strong roof helps minimize roof fall problems in coal mine entries. However, the Inability of strong roof to cave readily may contribute to major ground control problems In Iongwall and retreat mining

    Jan 1, 1988

  • SME-ICGCM
    Further Improvements In The Roof Beam Tilt Method Of Gateroad Support Design

    By Peter Cain

    Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block

    Jan 1, 1993

  • SME-ICGCM
    Roof Bolting Application In Longwall Mining In Indonesia And Japan

    By Herryal Anwar

    The application of roof bolting technology to control the stability of roadways in coal mining within weak strata or under high ground pressure has improved progressively. One of several factors that

    Jan 1, 1999

  • SME-ICGCM
    Inorganic Cement Grouted Bolt System

    By M. O. Serbousek

    In 1975 the Bureau of Mines Spokane Research Center began a series of laboratory and field tests to investigate the feasibility of developing a substitute for the organic chemicals used in resin roof-

    Jan 1, 1981

  • SME-ICGCM
    Eclipse Bolting System

    By Alan Campoli

    The Eclipse System was developed by Minova USA Inc. formerly Fosroc Inc. to improve the performance of 5/8-inch deformed rebar fully grouted into a one inch borehole. An 1/8-inch offset bolt head comb

    Jan 1, 2003

  • SME-ICGCM
    Multiple-Seam Mining - A State-Of-The-Art Review

    By Chris Haycocks

    The relevant literature concerning ground control, mine planning and reserve conservation in multi- seam mining is reviewed. Factors affecting interaction, interaction mechanisms, and design guideline

    Jan 1, 1990

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    Application of geotechnical and geophysical parameters to improve planning reliability in roadway drivage

    By Nikolaos Polysos

    To drive and utilise gate roads economically requires accurate planning and risk assessment considering the variable geomechanical requirements. The geomechanical part of roadway planning is secure

    Jan 1, 2002

  • SME-ICGCM
    Influence Of Support Capacity And Geometry On Tailgate Support

    By E. Hosca

    Alternative tailgate loading conditions due to conventional and conventional/yield pillar combinations were evaluated to define roof loading. In order to isolate different loading situations, the tail

    Jan 1, 1994

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)

    By T. N. Singh

    With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa

    Jan 1, 1992

  • SME-ICGCM
    Multi-Scale Assessment Of Coal And Gas Outbursts Based On Fractal Measurements

    By Mingju Liu

    In this research, we measured fractal characteristics of over ten typical outburst areas on different scales and related them to their outburst proneness, in attempts to provide new methods for outbur

    Jan 1, 2000

  • SME-ICGCM
    Drag Picks - Influence Of Tool Geometry And Angle Of Arrack On The Stress Evolution And Cutting Efficiency

    During the last decade mechanical rock excavation has become increasingly widespread in the mining industry and, more in general, in excavation engineering. This technology, especially the tools and t

    Jan 1, 1990

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • SME-ICGCM
    Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case Study

    By Erik C. Westman

    The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re

    Jan 1, 1993

  • SME-ICGCM
    Application of Yieldable and Cuttable Pump Crib in Longwall Recovery Room

    By Quanzhong Gu

    Stability of a pre-exnacted recovery room plays a vital role when longwall face approaches and during a longwall face move. In an attempt to extend the application of pumpable cribs into recovery room

    Jan 1, 2004

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993

  • SME-ICGCM
    Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine Entries

    By Asmaa Yassien

    Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column

    Jan 1, 2002