Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining Operations

    By Yi Luo

    Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However

    Jan 1, 2001

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Hydrogeologic Effects Of Subsidence At A Longwall Mine In The Pittsburgh Coal Seam

    By Leslie Carver

    The effects of longwall mine subsidence on water resources were studied at a West Virginia coal mine (mine Z) by Carver (1994). Data were obtained for 137 domestic supply wells and springs and 12 base

    Jan 1, 1994

  • SME-ICGCM
    Empirical Approach to Calculate Rock Loads in Coal Mine Roadways

    By Erdal Unal

    In order to define the support parameters, by use of empirical approaches, it is particularly important to analyze the rock-load height that should be controlled by supports. The controlling mechanism

    Jan 1, 1986

  • SME-ICGCM
    Rock Fracture, Caving and Interaction of Face Supports Under Different Geological Environments. Experience from Australian Coal Mine

    By Winston Gale

    This paper is presents a summary of recent investigations into fracture and caving about longwall panels. The results of these investigations indicate that rock failure initiates well ahead of the lon

    Jan 1, 2004

  • SME-ICGCM
    Implementation and Evaluation of Roof Bolting in MICARE Mine II

    By Gustavo Herrera Rico

    As part of a general effort to increase safety, efficiency, and profitability of its mining operations, MICARE personnel with the support of NorWest Mine Services, Inc. determined that the key to impr

    Jan 1, 1997

  • SME-ICGCM
    Chemical Destressing to Alleviate Rockbursts

    By S. P. Singh

    Destress blasting is commonly used in the mines to minimize the occurrence of rockbursts. The fracturing created by destressing in the vicinity of the face reduces the stress concentration by pushing

    Jan 1, 1987

  • SME-ICGCM
    Problems in "Void" Detection in Coal Mine Water Hazards

    By Francis Kendorski

    One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe

    Jan 1, 2004

  • SME-ICGCM
    The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall Panels

    By Rene Rodriguez

    The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun

    Jan 1, 1995

  • SME-ICGCM
    Application Of Time Domain Reflectometry To Ground Control

    By Kevin M. Connor, O&apos

    An example application is presented in which Time Domain Reflectometry (TDR) was utilized to monitor roof strata movements during pillar extraction in a potash mine. The study was initiated when Weste

    Jan 1, 1990

  • SME-ICGCM
    Methods of Controlling Hard Roof in a Longwall Face

    By Linsheng Xu

    When coal seam is under the integral thick sandstone (or conglomerate), the structure of thick sandstone is integral and its strength is rather high. After coal is extracted, the roof is hanging and c

    Jan 1, 1986

  • SME-ICGCM
    Practical Detection Of Underground Mine Roof Failure

    By David Bigby

    The paper describes research undertaken on an ECSC/K HSE project which investigated several potential physical principles which might be harnessed to provide a non-intrusive means of determining the e

    Jan 1, 2004

  • SME-ICGCM
    The Use Of Geologic Modeling In The Prediction Of Adverse Roof Conditions

    By Edward S. Custer

    Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional

    Jan 1, 1981

  • SME-ICGCM
    Floor Failure Induced By Lateral Stress Ahead Of Longwall Supports

    By J. A. Nemcik

    Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein

    Jan 1, 1995

  • SME-ICGCM
    Monitoring and Prediction of Ground Movements Above Underground Mines in the Eastern United States

    By M. Karmis

    mining factors and representative ground movement parameters. Based on this analysis, the previously developed prediction methods were modified and tested for their applicability in the Appalachian co

    Jan 1, 1987

  • SME-ICGCM
    A New Rockbolt Axial Load Measuring Device

    By Hani Mitri

    A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a

    Jan 1, 2001

  • SME-ICGCM
    Design Aspects In Multiple-Seam Mining: Case Studies

    By Gregory J. Chekan

    Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i

    Jan 1, 1990

  • SME-ICGCM
    Design And Planning Of Lower Seam Longwall Gateroads

    Case study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be

    Jan 1, 1995

  • SME-ICGCM
    Longwall Pace Bursts and Inadequate Caving: A Came Study

    By K. Y. Haramy

    Deep coal mines with strong roof and floor strata frequently encounter face and rib bursts. The burst problem becomes more severe with increased depth. While the exact causes of bursts are often diffi

    Jan 1, 1987

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002