Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Hybrid Flac3D-PFC3D Model to Study the Microseismic Response of Caprock
By J. F. Hazzard, R. J. Chalaturnyk, C. Khazaei
"Various measurement, monitoring and verification (MMV) techniques are used to ensure the safety of operations in petroleum projects. One of these techniques is microseismic (MS) monitoring of the cap
Jan 1, 2015
-
A Hybrid Life Cycle Assessment and Geographical Information System Model for Sustainable Recycled Aggregate Chain Management in Turin (Italy)
By E Garbarino, P Molina, V Badino
Given the ever increasing quantity of construction and demolition waste (C&DW), one of the most challenging issues presently facing policymakers and public administrators in Italy concerns how to
Jan 1, 2009
-
A Hybrid Location Methodology
By S. M. Spottiswoode
The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on
Jan 1, 2005
-
A Hybrid Quadratic Isoparametric Finite Element-Boundary Element Code For Underground Excavation Analysis
By Denis Yeung, B. H. G. Brady
A hybrid finite element-boundary element code with eight noded isoparametric finite elements and three noded boundary elements is described for plane strain and linear isotropic elasticity. In the dir
Jan 1, 1982
-
A Hybrid Statistical-Analytical Method For Assessing Violent Failure In U.S. Coal Mines
By Eric G. Zahl, John P. Dunford, Hamid Maleki
Coal bumps are influenced by geologic conditions, the geometric design of coal mine excavations, and the sequence and rate of extraction. Researchers from private industry and government agencies aro
Jan 5, 1999
-
A hydraulic ore hoisting installation at the Detour Lake Mine QK Zone project: A feasibility study
By H. J. Glass, J. G. L. Bekkers
"In order to determine the feasibility of a hydraulic ore hoisting installation, the optimal operating conditions were calculated for applying such a system at the Detour Lake Mine of Placer Dome Ltd.
Jan 1, 1998
-
A Hydro-mechanical Model and Analytical Solutions for Geomechanical Modeling of Carbon Dioxide Geological Sequestration
By Yilin Fang, Alain Bonneville, Timothy. D. Scheibe, Zhijie Xu
"We present a hydro-mechanical model for geological sequestration of carbon dioxide. The model considers the poroelastic effects by taking into account the coupling between the geomechanical response
Jan 1, 2012
-
A Hydrocyclone Demonstration System For The Recovery Of Coal From GOB
By P. K. Davis
The results of a previous basic study of the flow and design characteristics of the hydrocyclone has shown that a recovery as high as 99% with a product rating of 0.95 can be achieved on a "batch?2 ba
Jan 1, 1989
-
A Hydrodynamic Approach for Sizing and Selection of Hydrocyclone—Parametric Scaling and Process Optimization - SME Annual Meeting 2024
By Debra Switzer, Swapnil Urankar, Douglas Watson, Steven Hunter, Chandranth Banerjee, Shashank Pathak
A hydrocyclone is a piece of equipment commonly used as a classifier in mill circuit operations. Traditionally, hydrocyclone performance is characterized by the classification efficiency parameter, su
Feb 1, 2024
-
A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data
"Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go
Jan 1, 2009
-
A Hydrogen Powered Mine Vehicle - Objective
Develop a safe, nonpolluting power source for underground mining equipment. Approach The Bureau of Mines and EIM-CO Mining Machinery International entered into a cost-shared project to develop
Jan 1, 1986
-
A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining
By G. J. Hasenfus
This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw
Jan 1, 1988
-
A hydrometallorgical process for the extraction of copper
By W. A. Ahrens, J. H. McNamara, J. G. Franek
"An economical, pollution-free process has been developed for the hydrometallurgical extraction of copper from sulphide ores. The extracted copper, in the form of cuprous chloride (CuC/), is converted
Jan 1, 1980
-
A Hydrometallurgical Approach to Produce Nano-ZnO from Electrical Arc Furnace Dusts - Mining, Metallurgy & Exploration (2021)
By Ali Behrad Vakylabad, Esmaeel Darezereshki, Babak Koohestani
As a by-product of the steelmaking industry rich in iron and zinc, electric arc furnace dust (EAFD) landfill disposal is restricted in many countries due to the metal lixiviation risks. Several approa
Mar 10, 2021
-
A Hydrometallurgical for the Extraction Process of Iron from Low-Grade Ores
By C P. Gravenor
In 1953, a deposit of sedimentary oolitic iron ore was discovered in the Clear Hills area of northwestern Alberta. Since that time, detailed drilling has outlined reserves in excess of 200 million ton
Jan 1, 1964
-
A Hydrometallurgical Process For Beryllium Recovery From Spors Mountain Ores, Utah
By James K. Grunig, Rodney J. Anderson
A process consisting of leach, continuous countercurrent decantation, resin-in-column ion exchange, evaporative crystallization of beryllium sulfate, and decomposition of the sulfate was developed for
Jan 1, 1983
-
A Hydrometallurgical Process For Beryllium Recovery From Spors Mountain Ores, Utah
By J. K. Grunig
A process consisting of leach, continuous countercurrent decantation, resin-in-column ion exchange, evaporative crystallization of beryllium sulfate, and decomposition of the sulfate was developed for
Jan 1, 1982
-
A Hydrometallurgical Process For Recovery Of Vanadium And Molybdenum From Wasted Catalysts For Hy-Drotreating Desulfurization Of Heavy Oil
By Toshiaki Akahoshi
Keywords: Wasted catalyst, Hydrodesulfurization, Ammonium vanadate, Ammonium molyb-date, Hydrometallurgical process. The fundamental reactions have been investigated in order to develop a hydrometa
Jan 1, 2005
-
A Hydrometallurgical Process For The Extraction Of Copper
By J. H. McNamara
A process has been developed for the successful hydrometallurgical extraction of copper from sulfide ores. The extracted copper in the form of a salt is converted by reduction to copper metal. Purific
Jan 1, 1978
-
A Hydrometallurgical Process to Produce Iron Powder from Scrap Iron
By T. Rigg, J. N. Stone
"The process described has been developed to utilize low-grade scrap -turnings, borings, tin cans and other types of ferrons scrap which currently has been of limited or no use in conventional steelma
Jan 1, 1970