Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
3.14 - Metals - Iron Ore
By Franz R. Dykstra
DEFINITIONS The ores of iron are classified in three general categories: direct shipping, concentrates, and agglomerated-i.e., pelletized or sintered. Direct Shipping As the name implies, dir
Jan 1, 1976
-
3.15 – Nonmetallics - Construction Minerals
By Robert M. Dreyer
AGGREGATE With an annual domestic production of over 1.6 billion tons at a value of over $2 billion (see Table 15.1.1), the production of aggregate (crushed rock, sand, and gravel) is a basic indus
Jan 1, 1976
-
3.15.4 - Other Nonmetallics - Abrasives
By Robert M. Dreyer
During the past two decades, synthetic abrasives have taken over successively greater percentages of the high-grade abrasive market, so that now, with the exception of natural diamonds (discussed in s
Jan 1, 1976
-
3.2 Lotz - Sampling For Cyanide In Metallurgical Processes
By Peter W. Lotz
Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi
Jan 1, 2005
-
3.2 Ore-Body Modeling - 1. Technical Overview ? Introduction
By B. T. Stanley
The basic geological data, derived from boreholes, exploratory test pits, drivages, and mine development, include information on parameters such as ore thicknesses, grades, depths below surface, struc
Jan 1, 1979
-
3.26 GA Black Smoker-Type Textures and Setting of VMS Mineralisation in the Pilbara Craton, Western Australia: Ancient Analogues of Modern Pacific-Rim Processes
By R Kerrich
Early-Archaean (3.26 Ga) volcanogenic massive sulphide (VMS) deposits located within the low strain and sub-prehnite-pumpellyite metamorphic-grade Strelley greenstone belt, East Pilbara, Western Austr
Jan 1, 1995
-
3.3 Open-Pit Limits Analysis - 1. Technical Overview
By Y. C. Kim
One aspect of long-range mine planning in an open-pit mine is first to define the ultimate pit limit, i.e., the projected size and shape of the pit at the end of its life. This chapter is concerned wi
Jan 1, 1979
-
3.4 Biotrack - Environmental Assessment ,Monitoring And Interpretation
By Mark Dangerfield
[Power-Point Presentation]
Jan 1, 2005
-
3.4 Long-Range Mine Planning - Mining Sequence - 1. Technical Overview
By R. K. Davey
Subsequent to the determination of an ultimate pit and ore reserves for metallic and nonmetallic deposits, it is necessary to develop the most profitable long-range mining sequence for the deposit. Lo
Jan 1, 1979
-
3.5 Engineering and Environmental Aspects of Surface Mine Design - 1. Technical Overview
By David J. Hammel
This chapter will summarize some of the important applications in the geotechnical (pit slope, spoil pile and tailings stability, and hydrology), the environmental (including reclamation), and equipme
Jan 1, 1979
-
3.6 Underground Long-Range Planning and Design - 1. Technical Overview - Introduction
By S. C. Suboleski
Underground long-range planning and mine design is an iterative process beginning with a specified production level, quality criteria, and geology of the deposit. Given these factors, face equipment i
Jan 1, 1979
-
3.7 Mine Valuation - 1. Technical Overview
By Donald W. Gentry
Mine valuation is a multifaceted, interdisciplinary process by which the economic viability of an old, existing, or new mining property or venture is determined. The problems associated with arriving
Jan 1, 1979
-
30 Hudson Street Foundation Design and Construction in Variable Rock
By Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
30 Years of Advances in Risk Management for Underground Projects - RETC2023
By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly
Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS
Jun 13, 2023
-
30 Years Of On-Stream Analysis At The Pyhasal Mine
By S. Uihteenmaki
Pyhasalmi is a massive sulfide orebody located in central Finland. The mine has been in operation since 1962. The flotation concentrator produces Cu, Zn, Pb and pyrite concentrates. The plant has used
Jan 1, 1999
-
30 years of seismic system design, implementation and interpretation
By J Player, G Sweby, S Webber, E Jones
Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy
Nov 29, 2022
-
30. Discovery of the Kidd Creek Mine near Timmins, Ontario
By Brian W. Hester
Ore was first discovered at the Kidd Creek mine site during the first few days of December 1963 when a diamond drill hole there cut sulfide mineralization. This event marked the end of the search star
Jan 1, 1991
-
30. Geology and Ore Deposits of the Gilman (Red Cliff, Battle Mountain ) District, Eagle County, Colorado
By R. E. Radabaugh, J. M. Brown, J. S. Merchant
The Gilman district is on the northeast flank of the Sawatch Range in central Colorado. It has yielded a total of 10,000,000 tons of ore having a value of over $250,000,000. Paleozoic sediments intrud
Jan 1, 1968
-
3000t Controlled Chamber Standing Shot
By He Guangyi
Combining living examples, the paper introduces the controlled chamber standing shot of more than 3000t explosives initiated at one time with Nonel under complicated circumstances and the experience o
Jan 1, 1998
-
31. Case History of Metallic Mineral Exploration in Wisconsin, 1955 to 1991 ? Introduction
By M. G. Mudrey
Considerable potential for metallic mineral resources in the lower Proterozoic rock of the Lake Superior region exists (Mudrey and Kalliokoski, in press). Most of the identified resources occur within
Jan 1, 1991