Search Documents

  • NIOSH
    Airway Responsiveness and Job Selection: A Study in Coal Miners and Non-Mining Controls

    By M. L. Wang, S. R. Short, E. M. Daniloff, E. L. Petsonk, D. M. Mannino, G .. R. Wagner

    "Background—It has been suggested that health related job selection is a major cause of the healthy worker effect, and may result in inaccurate estimates of health risks of exposures in the working en

    Dec 1, 1996

  • CIM
    Airway Velocity “Rules Of Thumb” More Guidelines than Hard and Fast Rules

    By R. Viljoen, K. Manns

    "The mining industry instinctively follows rule-of-thumb design velocities often based on very simplistic theoretical “economic velocity” optimization calculations to determine airway sizes. Although

    Jan 1, 2019

  • ABM
    Ajuste Do Modelo Matemático Dos Fornos De Reaquecimento De Placas Para Operação Com Gás Natural

    By Antonio Adel dos Santos

    Em agosto/2014 foi introduzido o gás natural, GN, na matriz de combustíveis dos fornos de reaquecimento de placas da Linha de Tiras a Quente, em Ipatinga, eliminando o óleo combustível deste processo.

    Aug 16, 2017

  • ABM
    Ajustes No Modelo De Ritmo Do Laminador De Tiras A Quente Com Foco Na Produtividade

    By Leonardo Zuchi Guio

    A ArcelorMittal Tubarão vem trabalhando continuamente no aumento de produção de seu Laminador de Tiras a Quente (LTQ). Com o aumento da produção, o risco de colisão de material ao longo do LTQ, com ma

    Oct 30, 2017

  • SAIMM
    Akinetic study of the leaching of pentlandite in acidic ferric sulphate solutions

    By M. T. Scholtz, I. J. Corrans

    Akinetic study of the leaching of pentlandite in acidic ferric sulphate solutions by I. J. CORRANS, (Pr. Eng.). B.Sc. (Chem. Eng.) (Wits.). M.Se. (N.S.W.). Ph.D. (Natal) (Member) and M. T. Scholtz. B.

    Jan 5, 1976

  • AIME
    Akita Electrolytic Zinc Plant And Residue Treatment Of Mitsubishi Metal Mining Company, Limited, Akita, Japan

    By Eifu Moriyama

    In 1953, Akita Plant, having a capacity of 560 tons per month, was built at Akita city by Mitsubishi Metal Mining Co., Ltd. for the purpose of treatment of the Ikuno and Akenobe Mines's zinc conc

    Jan 1, 1970

  • SME
    Al and ES: Possible Solutions for the Mineral Industry Brain Drain

    By R. Dewey

    WHAT IS AI? It's very hard to say. Most researchers and practitioners disagree with nearly any attempted definition, but most would agree that A1 does deal with the development of computer-re

    Jan 1, 1987

  • AUSIMM
    Al Applications in the Mining Industry Into the 21st Century

    Over the past 15 years, Artificial Intelligence (AI) techniques have shown promise of providing the ability to capture `human intelligence' into a computer program. The sub-fields of Expert Sys

    Jan 1, 1995

  • AUSIMM
    Al Assisted Coal Interpretation Techniques

    By Godresse M, Turczynski G. P J, Driver I. J, Low G, Ozawa N

    Geological evaluations of coal deposits have been traditionally undertaken in a somewhat manual manner. Information is collected downhole by chip sampling, coring and using downhole geophysical log

    Jan 1, 1995

  • TMS
    Al Control In High Titanium Ferro With Low Oxygen

    By Guan-Yong SHI, Cong Wang, Zhi-he DOU, Ting-an ZHANG, Shi-gang FAN

    Based on the pre-works, this paper proposed a new short stage process of the intensify aluminothermy reduction by the stage to prepare high titanium ferroalloy with low O and Al contents. We investiga

    Jan 1, 2015

  • CIM
    AL KIN - A new generation of fluxing and purging technology for a cleaner Aluminium

    By F. Filzwieser, K. Gamweger

    The process of gas purging in molten aluminium has been an industrial practice in Europe for many years. The advantages are a reduction in the hydrogen content and impurities in the melt, as well as a

    Jan 1, 2004

  • ISEE
    AL/AN/FO Optimum Formulation

    By Yessica Idrogo

    "Undoubtedly mining is currently the activity that brings a great development for all countries involvedin this industry, which means that to develop mining requires adequate explosive mixtures. The f

    Jan 1, 2017

  • AIME
    Alabama Coal and Iron

    By Richard P. Rothwell

    A REFERENCE to the geological map of Alabama shows the coal- measures of that State to form three distinct fields. The Coosu, or most easterly, contains about one hundred square miles ; the Cahaba, or

    Jan 1, 1874

  • AIME
    Alabama Coal Mining Practices

    By Milton Fies

    ALTHOUGH pig iron from iron ore and red cedar charcoal preceded the mining of coal by many years, for tradition says that Alabama iron was used to shoe the horses of Andrew Jackson's soldiers, co

    Jan 9, 1924

  • AIME
    Alabama Flake Graphite In World War II

    By Hugh D. Pallister, Richard W. Smith

    The Alabama flake-graphite industry has flourished only in times of war when importations of foreign graphite for crucible use have been greatly curtailed or cut off. World War I was a boom period and

    Jan 1, 1945

  • AIME
    Alabama State Geological Survey

    Geological Survey of Alabama, University, Ala. A complete list of publications will be sent upon request Requests for publications should be addressed to Walter B. Jones, State Geologist, Univers

    Jan 1, 1933

  • AIME
    Alabama State Mine Experiment Station, University of Alabama

    State Mine Experiment Station, College of Engineering, University of Alabama, University, Ala Copies of two bulletins issued by the Mine Experiment Station may be had by writing to the Director

    Jan 1, 1933

  • AIME
    Alabama Technical Association

    This Association is made up of Alabama members of the following technical societies: The American Society of Civil Engineers, American Institute of Mining Engineers, American Society of Mechanical Eng

    Jan 8, 1917

  • AIME
    Alabama; Coal In The Confederate States - Alabama

    While coal was undoubtedly seen by the early travellers within the state, the first mention of it was in the late 1820's when hunters put some stones from a creek bed under the logs of a large ca

    Jan 1, 1942

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017