Search Documents

  • NIOSH
    Appendix I – Computer Program Listing

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    • MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(

    Jan 1, 1975

  • NIOSH
    Appendix II – Model Verification Test I

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    The data for Test I describes an underground bituminous coal mine operation in a 48 inch seam, with an estimated production rate of 1,056,000 tons per year. The system includes four continuous mining

    Jan 1, 1975

  • NIOSH
    Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutions

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I

    Jan 1, 1975

  • CIM
    Appendix II. Royalty Check List

    By Karl J. C. Harries

    "The following is an outline or check sheet of some things that might be looked at when considering the concept of a royalty or royalty provisions. It is not intended as a guide to what is right or wr

    Jan 1, 2003

  • NIOSH
    Appendix III - Analytical Pressure - Volume Computations For The Mine Prototype

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in

    Jan 1, 1975

  • CIM
    Appendix III - Joint Venture Agreement Table of Contents, Annotated

    By Karl J. C. Harries

    "The Table of Contents that follows is only an example and is the Table of Contents from an actual negotiated agreement. It is merely intended to show how an agreement might be set out and the nature

    Jan 1, 2003

  • NIOSH
    Appendix III – Model Verification Test II

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    The data for Test I1 describes an underground bituminous coal mine operating in a 72 inch seam, with an estimated production rate of 4,257,000 tons per year. The system includes 15 continuous mining s

    Jan 1, 1975

  • NIOSH
    Appendix IV – Cost Data Library

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    Cost Data Library The data retained in the Cost Data Library is of a semi¬permanent nature in that it is held in storage for immediate use with the program although its contents may require periodi

    Jan 1, 1975

  • NIOSH
    Appendix IV – User’s Index

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    All the input data required to operate the ventilation simulator except the title, are entered with I10 or F1O.O formats. The title is entered with (18A4) format. The floating points are designated by

    Jan 1, 1975

  • NIOSH
    Appendix J ? Variability In Sampling And Analytical Methods - J.1 MSHA Gravimetric Method For Respirable Coal Mine Dust

    The current procedure for measuring the concentration of respirable coal mine dust is as follows. Each filter is preweighed by the filter manufacturer to ±0.1 mg. Following sampling with the Coal Mine

    Jan 1, 1997

  • NIOSH
    Appendix J – Additions of Andrews Shaft – Computer Output

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    MINE VENTILATION NETWORK ANALYSIS

    Jan 1, 1977

  • NIOSH
    Appendix K – Addition of Ontario Shaft – Input Data

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    1 14 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 2

    Jan 1, 1977

  • NIOSH
    Appendix L – Addition of Ontario Shaft – Computer Output

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    MINE VENTILATION NETWORK ANALYSIS

    Jan 1, 1977

  • NIOSH
    Appendix M – Addition of Hasting Fan – Input Data

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    1 11 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT.

    Jan 1, 1977

  • NIOSH
    Appendix N – Addition of Hastings Fan – Computer Output

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    MINE VENTLATION NETWORK ANALYSIS

    Jan 1, 1977

  • NIOSH
    Appendix O – Results of Additional Systems Modifications

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    Table

    Jan 1, 1977

  • NIOSH
    Appendix P – SI Equivalents of U. S. Units

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    Le Système International d'Unités (SI) Equivalents of Common United States Units Length 1 ft (foot) = 0.30480 m Mass 1 lbm (pound mass) = 0.45359 kg Force 1 lb (pound) = 4.4482 N Volume

    Jan 1, 1977

  • AIME
    Appendix To Paper By Carl Zapffe

    Reserves of Lake Superior Manganiferous Iron Ores Appendix-to paper by CARL ZAPFFE, presented at the Cleveland Meeting and issued, as Pamphlet No. 1664-C, with MINING AND METALLURGY, May, 1927. The

    Jan 5, 1927

  • SME
    APPENDIX: Review of Economic Analysis Techniques

    By Dan Nilsson

    INTRODUCTION A company must have an objective, and that usually is to earn money. In some countries an objective can also be to reduce unemployment in an area or to develop nonindustrialized areas. G

    Jan 1, 1982

  • AUSIMM
    Appin Colliery Belt Drift Fire

    By Fisher AEJ

    On Sunday morning 7th November, 1976, at approximately 2-25 a.m., smoke was discovered issuing from the 1912 m long belt drift at Appin Colliery. A Clouth steel cord rubber belt approximately 940 m

    Jan 1, 1981