Search Documents

  • CIM
    Pyrrhotite Rejection at Strathcona Mill - DETA/SMBS Plant Trials

    By J. Coffin, R. Multani, C. Deredin

    Glencore’s Strathcona Mill has recently evaluated a pyrrhotite depressant combination of diethylenetriamine (DETA) and sodium metabisulfite (SMBS) to improve its overall plant pyrrhotite- pentlandite

    Jan 1, 2019

  • ISEE
    Blast Pattern Expansion: A Heuristic Approach

    By Francisco Sena Leite, Vincius Miranda, PhD Machado Leite, PhD Pinto, Raquel Carvalhinha, Alexandre Julio, Dorival de Carvalho

    Rock blasting, in particularly the drilling process, is one of the first processes in the stage of rock fragmentation and plays a fundamental role by influencing all the following stages. Given its im

    Jan 1, 2019

  • SME
    Reclamation of the Canmore Creek Open Pit Coal Mines to Form Quarry Lake Heritage Park, Alberta, Canada; an Example of Successful, Walk-Away, Pit Lake Closure

    By H. G. Stephenson, D. Castendyk

    Open pit anthracite mining at the Canmore Creek Mines, Canmore, Alberta, south of Banff National Park, resulted in several pit lakes by the early 1970’s. To enable future mining opportunities in the R

    Jan 1, 2019

  • SME
    Improved Drilling Accuracy Results In Reduced Ore Dilution at Evolution, Cracow (a2d917f6-13bc-4cac-8758-bced53c996a6)

    During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa

    Jan 1, 2019

  • CIM
    CFD Modeling of Methane Flame Interaction with a Simulated Longwall Coal Mine Gob

    By G. E. Bogin, C. Strebinger, J. F. Brune

    "Evidence shows that methane gas emanates from the mined-out area or gob of a longwall coal mine and can travel towards the working face, posing an explosion risk. Since the gob consists of varying le

    Jan 1, 2019

  • CIM
    Hyperspectral Remote Sensing Characterization of Mine Materials for Process Control

    By Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton

    Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re

    Jan 1, 2019

  • CIM
    SAG and Ball Mill Effects from Ore Sorting System Implementation

    By J. Hedderson, J. Starkey, S. Reeves, B. Hilscher

    "As ore sorting becomes more common, it is important to quantify its impact on comminution circuits in order to precisely predict its effect on throughput, grind, and mill operating conditions. Since

    Jan 1, 2019

  • CIM
    Application of Plastic Ventilation Ducting in Mine Tunneling

    By D. Kulchyski, R. Thibault, D. Lamoureux

    "Mine tunneling applications are sensitive to the leakage and friction performance of ducting systems. Improvements in performance can help project economics through reduction in drift height, booster

    Jan 1, 2019

  • CIM
    Stainless Steel “Permanent” Cathode Plates - Fixed Assets or Consumables?

    By G. J. Heferen, A. Pranowo, N. J. Aslin, P. O. Eriksson

    Glencore Technology (GT) has over four decades experience supplying stainless steel cathode plates (“cathode plates”) to the electro-refining and electro-winning industry. Cathode plates are typically

    Jan 1, 2019

  • CIM
    Enhancing Cobalt Recovery from Copper/Nickel Matte Producing Smelters

    By V. I. Lakshmanan

    Process Research ORTECH Inc. (PRO), with its in-depth knowledge on cobalt behaviour in nickel matte smelters and its novel mixed chloride hydrometallurgical processing, is developing a hybrid process

    Jan 1, 2019

  • CIM
    Metal Recovery and Reducing of Environmental Loading of Copper Mine Tailings by High Pressure Leaching and SX-EW Process

    By L. Avramovic, B. Han, R. Jonovic, Z. Stevanovic, K. Haga, S. Dimitrijevic, A. Shibayama, L. Godirilwe, Y. Takasaki

    Pyrite (FeS2) and chalcopyrite (CuFeS2) which could not be recovered, are present in mine tailings discharged from Bor copper mine. About 0.3% of copper (Cu) is contained in these tailings, therefore

    Jan 1, 2019

  • SME
    Effect of Ventilation System Configuration on Purging of Harmful Gases in a Built-in-Place Refuge Alternative with a Borehole Air Supply

    By M. A. Reyes, J. Bickson, J. R. Srednicki

    Federal laws mandate the presence of refuge alternatives (RAs) in underground coal mines and provide guidelines for harmful gas removal. After an explosion, harmful gases can follow survivors into an

    Jan 1, 2019

  • CIM
    Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™

    By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt

    Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are

    Jan 1, 2019

  • SME
    Large-Scale Dust Explosions: Treated Vs. Non-Treated Rock Dust

    By R. Hildebrandt, K. Cybulski, G. V. Goodman, Z. Dyduch, M. L. Harris, M. J. Sapko

    Past research showed that bituminous coal dust remains dry and dispersible in the presence of moisture. Rock dust must disperse with the coal dust to effectively inert a propagating coal dust explosio

    Jan 1, 2019

  • CIM
    Rougher Flotation Cell Pulp Level Control to Increase Recovery

    By Mark Ferra

    Flotation is used in mining to produce concentrates of copper, gold and several other valuable ores. In 2017, a copper mine near Globe, Arizona improved their rougher cells productivity using technica

    Jan 1, 2019

  • CIM
    Design of Copper Cooling Systems for Copper Smelting and Converting Furnaces

    By I. Mc Dougall, H. Joubert, G. de Villiers

    The use of sidewall copper cooling systems to prolong furnace campaign life is becoming an accepted technology solution in the base metals industry. Tenova Pyromet has designed and installed a number

    Jan 1, 2019

  • CIM
    Flash Furnace Feed System Developments

    By M. Coleman, M. E. Reed

    The control of feed delivery quality to the flash furnace remains an unsolved problem. Many operations around the world still have limited control of feed quality to their flash furnace. Schenck Proce

    Jan 1, 2019

  • CIM
    A Techno-Economic Analysis of the Use of Electric Loading and Hauling Technologies in Canadian Underground Mines

    By A. Romero, M. Carvalho, D. L. Millar

    "The number of underground mines replacing diesel by battery powered mobile equipment is growing worldwide. The latter produces locally zero emissions and less heat, improving air quality in the worki

    Jan 1, 2019

  • CIM
    Ventilation System Design for the Wassa Underground Mine

    By B. S. Prosser, K. G. Wallace, A. Akansobe

    "This paper describes a ventilation project at the Wassa gold mine in Ghana. Golden Star (Wassa) (GSWL), a subsidiary of Golden Star Resources, owns and operates the mine. Golden Star holds a 90% inte

    Jan 1, 2019

  • ISEE
    Innovative Online Technology Enabling Optimization in Blasting Operations

    By Jim Peterson, Ricardo Freire, Mason Biernat

    Variable nature of rock and face conditions, varying execution and changing nature of blasting are making ongoing optimization challenging. Intelligent planning and on-going analytics are required to

    Jan 1, 2019