Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project
By R Godard, J Gantumur, F Prince, C Pascoe
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera
May 9, 2016
-
The Social Psychology of Risk, Safety and Leadership Maturity
By R Long
The founder of social psychology is sometimes identified as Kurt Lewin. In a 1947 article, Kurt Lewin coined the term ‘group dynamics’. He described this notion as the way that groups and individuals
May 9, 2016
-
Analysis of Progressive Seismicity and its Correlation with Geotechnical Variables at the El Teniente Mine
By A Brzovic, E Córdova
In an underground mine, different mining activities such as undercutting and cave progression generate redistribution in the present in situ stress field, and these changes are represented in the rock
May 9, 2016
-
Geometric Control for Strategic Mine Planning at El Teniente Mine
By J Cornejo, A Pinochet, C Caviedes
The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp
May 9, 2016
-
Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine
By M Wilson, D Whiteman, P Kuiper, S Talu, G Watt, A van As
Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowi
May 9, 2016
-
Orepass Monitoring and Management at Olympic Dam Mine
By J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
Experiences Gained through Tunnel Boring Machine Decline Development
By M Donghi, G Ramage, A Barnes
As the mining landscape continues to transform, the challenge of accessing deeper orebodies quickly and safely is becoming a frequent topic of conversation amongst those in the mining industry. The ra
May 9, 2016
-
Simulating Intact Rock Behaviour Using Bonded Particle and Bonded Block Models
By A Turichshev
The synthetic rock mass (SRM) approach for modelling jointed and veined rock has been at the forefront of caving geomechanics research for years. A well-constructed and calibrated SRM model can captur
May 9, 2016
-
Preconditioning Modelling and Explosives Effectiveness in Block Caving
By P González, J Videla, E Córdova, I Gottreux
Currently, underground mining of deeper massive deposits with lower grades, harder rock conditions in high strength environments, entails difficulties in caving, fragmentation and seismicity of the or
May 9, 2016
-
The Evolution of Block Caving Technology
By A J. Weston
Block or panel caving technology is far removed from that of the top slicing and block caving of the late nineteenth or early twentieth centuries. The rapid mechanisation and expansion of these method
May 9, 2016
-
Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program
By C Rizzardi, M Callahan, J Mahon
Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted
May 9, 2016
-
Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery
By C Tickell
Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the
May 9, 2016
-
Field Performance of Fully Encapsulated Reinforcement during Violent Failure Events
By E Villaescusa, C Drover
Fully resin encapsulated threaded bar and cement grouted cable bolts are common forms of reinforcement for underground mining excavations constructed at great depth. These elements are frequently inst
May 9, 2016
-
Progressing Cave Performance into the Later Stages of the Deep Ore Zone Mine
By A M. Purba and A Sjadat, A D. Wilson
Ongoing mining of the East Ertsberg Skarn System orebody below the Gunung Bijih Timur and Intermediate Ore Zone caves has been relatively successful and a ramp up to 80 000 t/d was achieved in the Dee
May 9, 2016
-
Determining the Open Pit to Underground Transition – a New Method
By P A. Grossman, J H. Rubinstein, M Brazil, D Whittle
Many ore reserves are harvested by a combination of open pit and underground mining methods. In these cases, there is often material that could be mined by either method, and a choice has to be made.
May 9, 2016
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters
By M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving Mines
By G Pizarro, O Miranda, D Rosales
In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i
May 9, 2016
-
Simplifying the Ore Handling System through the Use of Current Technology at Chuquicamata Underground Mine Project
By P Paredes, T Leaño, D Gajardo, C Tramón, S Peñaloza
The definition of an ore handling system and its consequent layout design is of crucial importance in cave mining projects. It not only represents the main driver in the production capacity and reliab
May 9, 2016
-
A Dilution-based Stability Graph for Open Stope Design
By F T. Suorineni, L Baird, A Papaioanou, D Hines
The Mathews et al (1981) stability graph was developed to provide guidance in the determination of stope sizes to control dilution in bulk mining of large orebodies. Longhole and sublevel open stoping
May 9, 2016
-
Grasberg Block Cave Haulage Project – Design and Construction Update
By B Mead, N D. Pascoe
The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00
May 9, 2016