Search Documents

  • AUSIMM
    Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

    By A Ross, B De Rivaz

    The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by u

    Sep 17, 2014

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche Caverns

    By N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo

    This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut

    Sep 17, 2014

  • AUSIMM
    Northparkes Mines – Flotation and Planning for the Future

    By G Harbort, D Clarke, D Morgan, C Sola

    Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable

    Sep 1, 2014

  • SME
    An ecosystem-based management (EBM) approach to marine resource development

    By Ian Graham

    In 2013 the Government of New Zealand launched a number of ‘National Science Challenges’ (NSC) to address major issues facing the nation, and raise public consciousness about science and its role in p

    Sep 1, 2014

  • SME
    Synthetic aperture sonar as a tool for rapid high resolution deposit estimation

    By Rolf Birger Pedersen, Alden Ross Denny

    "Synthetic Aperature Sonar (SAS) is a powerful tool for ultra-high resolution marine survey. The Kongsberg HiSAS system deployed on the HUGIN AUV has a rangeindependent resolution of 3x3 cm for sonar

    Sep 1, 2014

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Application of High Efficient Fine Screen to Improve the Recovery of Tin Concentrate

    By W N. Qin, B Zhang, W Z. Huang, X S Mo

    Mengzi Mining and Metallurgy Co, Ltd (MMMC) polymetallic ore contains recoverable amounts of tin, lead, zinc, pyrite and other valuable minerals. With the change in orebody, the run-of-mine (ROM) ore

    Sep 1, 2014

  • SME
    AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge

    By J. W. Jamieson, J. Escartin, A. Steinführer

    Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C

    Sep 1, 2014

  • SME
    The mineralogy of marine Fe-Mn oxides and consequences for the extraction of metals

    By Thomas Kuhn, Carsten Ruehlemann, Christina Heller, Anna Wegorzewski

    The commercial extraction of metals from manganese nodules on an industrial scale requires more than 50% of the investment necessary to realize manganese nodule mining. This is mainly due to the fact

    Sep 1, 2014

  • SME
    Mineral resources in the Portuguese continental shelf

    By Raquel Costa, Aldino Campos, Frederico Carvalho Dias, Pedro Madureira, Patrícia Conceição, Ana Filipa Marques, Andreia Afonso, Maria Ana Martins, António Calado, Luísa Pinto Ribeiro

    Since its formation in 2004, the Task Group for the Extension of the Continental Shelf (EMEPC) has been collecting hydrographic, geological and geophysical data to support the extension of the contine

    Sep 1, 2014

  • SME
    Environmental and Mineral Exploration System Integration: Promoting Capture of Quality Environmental Data from the Outset

    By Tom Dettweiler, Robina Sharpe, Wright. Michael

    The International Seabed Authority and a number of countries have or are in the process of developing environmental impact assessment guidelines and legislation for seafloor mineral development. The f

    Sep 1, 2014

  • SME
    Latitudinal/land-mass proximity controls on ferromanganese crust composition and resource potential, Ninetyeast Ridge, Indian Ocean

    By Kira Mizell, James R. Hein, Tracy Conrad

    "The Ninetyeast Ridge (NER) extends roughly N-S as a topographic feature for 5000 km, from 31° south to 10° north (Fig. 1) where it becomes buried beneath the Bengal Fan at its northern end. These two

    Sep 1, 2014

  • AUSIMM
    Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and Optimisation

    By O Arafat, K M. Bartholomew

    A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia

    Sep 1, 2014

  • SME
    Managing Impacts of Deep-Sea Resource Exploitation - The Midas Project

    By Philip Weaver

    The MIDAS project is funded by the European Commission (DG Research) and began on the 1st November 2013. The project will investigate the environmental impact of deep-sea mineral and energy extraction

    Sep 1, 2014

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • SME
    New geological and geotechnical considerations within the Interoceanmetal exploration area

    By Ivo Dreiseitl, Kondratenko. Anatoly

    "The second prime area within the Interoceanmetal Joint Organization exploration area named H22 was delineated in 2013 with the goal to ensure sufficient nodule reserves for profitable mining operatio

    Sep 1, 2014

  • AUSIMM
    Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?Operation

    By R Wynn, R A. Pax, S Mann, B Cornish

    The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u

    Sep 1, 2014

  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014

  • AUSIMM
    Evaluation of the Blue Cube MQi Slurry Analyser for Application in an Advanced Control System for the Optimisation of a Gold Sulfide Flotation Circuit

    By D van der Spuy, T Kewe, K Keet, N Moffatt, A P. Paine

    The Blue Cube Mineral Quantifier Inline (MQi) instrument uses reflective light spectroscopy and advanced chemometrics to measure mineral or elemental grade in a slurry line. The instrument takes scans

    Sep 1, 2014