Search Documents

  • ABM
    Avaliação Da Injeção De Gás Em Um Reator Kanbara - S.i.r.a.m

    By Paulo Vinícius Souza da Conceição

    A demanda por aços com baixos teores de enxofre tem propiciado o aprimoramento das técnicas de dessulfuração de gusa. O presente trabalho tem como o objetivo mostrar, através de um modelo em água, a i

    Aug 17, 2017

  • ABM
    Estudo Da Diluição Em Juntas Soldadas De Aço Aisi 410s

    By Beatriz Araújo Batista

    A soldagem é um processo de união que envolve muitos fenômenos metalúrgicos que podem causar problemas práticos se não forem aplicados os princípios operacionais apropriados ao processo. O aço inoxidá

    Aug 17, 2017

  • SME
    An Overview Of U. S. Department Of Energy Coal Preparation Research ? Introduction

    By R. E. Hucko

    The principal thrust of the U.S. Department of Energy (DOE) Coal Preparation R&D Program is to develop technology to reduce the ash and sulfur contents of United States coals to levels such that the r

    Jan 1, 1984

  • TMS
    Gold Mineralization of the Trout Lake Massive Sulfide Ores and its Behaviour during Mineral Beneficiation

    By Raymond E. Healy

    Mercurian e1ectrum (Au-Ag-Hg alloy) is the principal Au-bearing phase in the massive sulphide ores at Trout Lake, Manitoba. The average composition of this phase (in wt %) is 49.2 % Ag. 38.7 % Au and

    Jan 1, 1989

  • CIM
    A Model for PGE Enrichment Due to the Splitting of Freezing Magma Chambers by Suspended Crystal Loads

    By Alan Rice

    Abstract-The mechanism by which stratiform ore deposits of PGE (platinum-group elements) are laid down in ultramafic igneous complexes is not completely clear. Early studies by the author and coworker

    Jan 1, 1997

  • CIM
    A Model for PGE Enrichment Due to the Splitting of Freezing Magma Chambers by Suspended Crystal Loads

    By Alan Rice

    The mechanism by which stratiform ore deposits of PGE (platinum-group elements) are laid down in ultrama?c igneous complexes is not completely clear. Early studies by the author and coworkers on numer

    Jan 1, 1997

  • ISEE
    Blasting Trials to Control and Monitor Displacement of Narrow Vein Gold Ore

    By P Geddes, K Grohs, C K. McKenzie, M Morrish

    Low grade surface gold mining at the Acacia Resources, Union Reefs Gold Mine in Australia's Northern Territory, involves the excavation of benches in three slices after blasting. Blast patterns span z

    Jan 1, 1998

  • AUSIMM
    The upgrading of low-grade nickel ore stockpiles at Western Areas Ltd Forrestania operations, using a mobile ore sorting plant

    By A Parry, C Fitzmaurice

    After conducting laboratory ore sorting testwork on samples of a low grade nickel ore stockpile at Western Areas’ Flying Fox nickel mine, a mobile crushing, screening and ore sorting plant was located

    Aug 29, 2018

  • CIM
    Pilot-Scale and Continuous Bench Testing of the Aims Cn-DTM Cyanide Destruction Process on an Australian Gold Plant Tailings Effluent

    By S. Glen

    Cyanide management practices on modern gold plants are becoming more onerous, due to environmental pressures, particularly for signatories to the International Cyanide Management Code. Operations are

    Jan 1, 2011

  • CIM
    Improving Energy Efficiency in Barrick Grinding Circuits

    By Lloyd Buckingham

    Barrick Gold Corporation (Barrick) has undertaken innovative methods of evaluating and improving the performance of grinding mills in several of its operations around the world. The results have been

    Jan 1, 2012

  • NIOSH
    OFR-83(2)-79 Operational Procedures And Maintenance Manual For Pumpable Roof Bolt Machine ? Introduction

    This manual covers the operation and lubrication procedures for the Eimco Pumpable Roof Bolting Machine. This machine meets U. S. Bureau of Mines Schedule 2G Approval. This manual is divided into t

    Jan 1, 1976

  • SME
    Acoustic Crosshole Site Characterization Studies For In Situ Mining

    By James A. Jessop

    The Bureau of Mines is investigating the use of geophysical methods to determine rock mass characteristics, particularly rock quality, lithology, and fracture parameters that are important for determi

    Jan 1, 1990

  • DFI
    Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years Later

    By Karl A. Higgins

    In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages

  • IIMP
    Prácticas no Convencionales de Rehabilitación de las Zonas de Cierre Progresivo en la Unidad Minera Constancia Cusco-Perú

    By Iván Calmell del Solar Salas

    Desde el año 2014, se ejecutaron pruebas piloto en zonas en condición de cierre progresivo dentro de la Unidad Minera Constancia, propiedad de Hudbay Perú S.A.C. El objetivo de estas pruebas fue logra

    Sep 1, 2017

  • SME
    Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)

    By Jaime Adasme, Héctor González, Benjamín Celada

    "INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In

    Jan 1, 2016

  • CIM
    Engineering and Construction Of Plant and Wharf Facilities

    By F. S. Thurner

    "This paper describes the engineering and construction activities of the ""design-build"" project awarded to the joint venture of Foundation-Comstock-Janin for the construction of the plant and wharf

    Jan 1, 1976

  • IOM3
    Digital simulation of a mechanical-drive dump truck

    By I. R. Hanby

    A simple but comprehensive method has been developed for the simulation of a mechanical-drive dump truck that enables various parameters to be predicted as a function of time throughout its whole cycl

    Jan 4, 1992

  • AIME
    Technical Papers and Discussions - Copper and Copper-rich Alloys - Solubility of Carbon in Molten Copper-manganese and Copper-nickel Alloys (Metals Tech., April 1947, T. P. 2151, with discussion)

    By Michael B. Bever, John R. Anderson

    Carbon may affect the alloys of copper in several ways. Provided an alloying element does not oxidize preferentially, even minute quantities of carbon dissolved in liquid alloys of high copper content

    Jan 1, 1947

  • AIME
    Technical Papers and Discussions - Copper and Copper-rich Alloys - Solubility of Carbon in Molten Copper-manganese and Copper-nickel Alloys (Metals Tech., April 1947, T. P. 2151, with discussion)

    By John R. Anderson, Michael B. Bever

    Carbon may affect the alloys of copper in several ways. Provided an alloying element does not oxidize preferentially, even minute quantities of carbon dissolved in liquid alloys of high copper content

    Jan 1, 1947

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014