Search Documents

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • SME
    Characterization Of Coal And Quartz Dust In Interior Basin Coal Mines

    By Y. Paul Chugh

    NIOSH and the Illinois Clean Coal Institute are funding studies on characterization of coal and quartz dust in Interior Basin mines since 2009. Coal dust characteristics vary significantly and, are vi

    Jan 1, 2011

  • DFI
    Large Diameter Machine Bored Piles In Australia

    By W. J. Kingwell

    Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of

    Jan 1, 1989

  • SME
    Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock

    By Emad Iskander

    The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai

    Jan 1, 2008

  • CIM
    The transition of mining methods at Anderson Lake Mine

    By Seppo Haapamaki

    "Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i

    Jan 1, 1988

  • DFI
    Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case History

    By Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero

    "SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m

    Jan 1, 2014

  • SME-ICGCM
    Extending the Limits of Strata Bolting by the Use of Flexible Strand Rockbolts

    By Dennis R. Barratt

    Rockbolting is now used extensively as a method of primary support in UK coalmines. Over the past fifteen years an optimum bolting system has evolved, based on a high grade steel bolt and a very stro

    Jan 1, 1997

  • SAIMM
    Alarm and evacuation systems in underground mining

    By J. L. Fuentes-Cantillana, Á. Rodríguez, P. Morillo

    Evacuation operations from work places in the case of an emergency are the key to minimising the effects of catastrophic type accidents such as fires, explosions, cave-ins, floods, etc. The correct pl

    Jan 1, 2003

  • DFI
    Secant Pile Shoring - Developments In Design And Construction

    By Eric S. Lindquist

    High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t

    Jan 1, 2011

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • IMPC
    Computational Insights into the Interaction Mechanism of Floatation Reagents with Chalcopyrite and High-Throughput Screening Floatation Reagent for Copper Ores

    By Chenyang Zhang, Zhigang Yin, Jianyong He, Yuehua Hu

    "A lot of floatation reagents (collectors, inhibitors and regulators) for the beneficiation of copper ores have been well developed in the past century. However, it is still unclear about the micro in

    Jan 1, 2018

  • AUSIMM
    Prohibited Activities and the Resource Management Act 1991 û Does æProhibitedÆ Mean æForbiddenÆ?

    By M L. van Kampen

    The Resource Management Act 1991 provides for activities to be classified as permitted, controlled, restricted discretionary, discretionary, non-complying or prohibited in district and regional plans.

    Jan 1, 2007

  • CIM
    Classification at the Sullivan Concentrator

    By G. J. Knighton

    Introduction The Sullivan concentrator treats the complex lead-zinc-iron ore from the Sullivan mine of the Consolidated Mining and Smelting Company of Canada, Limited, to make a lead and a zinc con

    Jan 1, 1947

  • NIOSH
    IC 7904 Research And Technologic Work On Coal And Related Investigations, 1956 ? Introduction And Summary

    This report is the 21st in a series summarizing research and technologic work on coal and related investigations by the Federal Bureau of Mines - the Chard of the series published on a calendar-year b

    Jan 1, 1959

  • SME
    Cable-Shovel Dipper Dynamics

    By M. A. Raza

    Cable shovels are capital-expensive and primary production equipment in many surface mines. The forces acting on the shovel dipper vary as the dipper moves through the muck-pile. The variations in the

    Jan 1, 2011

  • AUSIMM
    Making Studies Work – Organisation, Communication and Management

    By P McCarthy

    "This paper is based on 30 years of involvement in feasibility studies as a participant, study manager and the leader of a firm that provides study components and overall study management. The followi

    Mar 8, 2016

  • SME
    Environmental Impacts of Deep Sea Mining: Predictive Assessment Methods

    By Diane Jones, Jeremy Spearman, Tom Matthewson

    Requirements for minerals are on the increase globally and the deep sea offers a potential source of essential materials. Extracting these minerals from what is considered an environmentally sensitive

    Sep 1, 2014

  • NIOSH
    IC 8767 Guide For The Construction Of Driven-Rod Ground Beds

    By R. L. King

    This report describes a method for designing and constructing ground beds that has been developed under the sponsorship of the Bureau of Mines. The procedures for designing and constructing a driven-r

    Jan 1, 1978

  • AUSIMM
    Lithospheric Footprints of Giant Orogenic Gold Systems

    By R J. Goldfarb, A B. Christie, D I. Groves

    Small orogenic gold deposits have the same deposit-scale geological and geochemical features as those that characterise giant orogenic gold systems (>16 Moz Au). Therefore, a broader-scale approach

    Jan 1, 2005

  • DFI
    A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in Turkey

    By Arash Maghsoudloo, Asli Can

    "Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi

    Jan 1, 2014