Search Documents

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • AUSIMM
    The New System of Structural Analysis in Drillcore

    A comprehensive analysis of rock structures in non-oriented (axially oriented) drillcore is now available (Laing, in press). The system embodies new concepts which better equip the geologist and engin

    Jan 1, 1990

  • TMS
    High Aspect Ratio Nickel Structures Fabricated by Electrochemical Replication of Hydrofluoric Acid Etched Silicon

    By Xi Zhang

    A technique for fabricating free-standing, high-aspect-ratio porous and pillar-type Ni structures has been developed using wet Si processing. A wafer of (100) Si was initially etched in HF solution to

    Jan 1, 2006

  • DFI
    In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned

    By François G. Bernardeau

    Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement

    Jan 1, 2008

  • ISEE
    Simulations of Platform Loading from Explosions in Saturated Sand

    By William G. Szymczak

    A set of experiments were conducted at the Aberdeen Proving Grounds [1] in which explosive charges were buried in saturated sand beneath a suspended rigid platform. The goal of these experiments was t

    Jan 1, 2005

  • NIOSH
    IC 8150 Float Dust Deposits In Return Airways In American Coal Mines - Summary And Introduction (51fae723-000a-4525-a86a-70618befb74f)

    By Edward M. Kawenski

    Float dust deposits in return airways in bituminous coal and lignite mines present a special explosion hazard. Research is in progress at the Bureau of Mines experimental coal mine to evaluate the deg

    Jan 1, 1963

  • SAIMM
    The effect of resin annulus on anchorage performance of fully encapsulated rockbolts

    A diverse selection of rockbolt designs and resin anchors are available for use in underground mines. Research in recent years at the UNSW Mining Research Centre led to the construction of a rockbolt

    Jan 1, 2003

  • TMS
    Nickel and Copper Smelting at Inco's Copper Cliff Smelter

    By C. Landolt

    Inco's Copper Cliff Smelter Complex produces some 11 5,000 tonnes per year of nickel and 120,000 tonnes per year of copper. The Smelter flowsheet has changed a number of times over the years. The

    Jan 1, 1993

  • NIOSH
    RI 3579 Petroleum Engineering Study Of The Anahuac Field, Chambers County, Texas ? Introduction (cfd55801-3bf2-4a9b-9ffc-7b04c04e59cf)

    By Charles B. Carpenter

    [The Bureau of Mines selected Anahuac for a petroleum-engineering study because it is one of the notable fields of the Gulf Coast region. It is outstanding because the producing for is very thick; eve

    Jan 1, 1941

  • SAIMM
    Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction

    By Jeremy Bosman, Johan de Korte

    Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f

    Jan 1, 2006

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • SME
    Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.

    By V. Galla

    Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding

    Jan 1, 2011

  • SME
    TRI-FLO: A Multistage High Sharpness Separation Process That Opens To New Applications

    By G. Ferrara

    During several years of operation in Europe, South Africa and other countries, the Tri-Flo has demonstrated to represent a substantial improvement of the dense medium dynamic separation systems. The r

    Jan 1, 1993

  • SME
    The Hallandsås Dual Mode TBM

    By Werner Burger

    The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third at

  • NIOSH
    RI 3407 Earth Vibrations Caused By Mine Blasting - Progress Report 2 ? Introduction (8d9dbf31-1f51-47f4-8797-6b6bb5aca787)

    By J. R. Thoenen

    In Progress Rerort 1,4/ a number of facto were demonstrated and conclusions drawn from experimental tests and records made during commercial blasting operations at a number of quarries. For example, t

    Jan 1, 1938

  • ISEE
    Planning for Optimum Dragline Performance

    By Mark A. Williams, James D. Humphrey

    Without question, draglines are one if not the most effective tools available to the surface mining industry for overburden handling. With few moving parts and a two- or threeman crew, this machine si

    Jan 1, 1990

  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • SAIMM
    Some practical aspects of the use of lognormal models for confidence limits and block distributions in South African gold mines

    By D. G. Krige

    For the purpose of determining confidence limits for ore grade estimates, an extensive simulated data base was used, which included 1728 ore blocks with ‘actual’ grades and the corresponding estimates

    Jan 1, 2003

  • AUSIMM
    Inline analysis of washability parameters for process control

    By M P. Cipold, J F. Bachmann, C C. Bachmann, J Ha, H B. Wurst

    In washability, the objective is to establish the set of maximum possible separation performance criteria for a given mineral feed. The method of choice for this has been the conventional sink–?float

    May 9, 2017

  • NIOSH
    RI 3579 Petroleum Engineering Study Of The Anahuac Field, Chambers County, Texas ? Introduction

    By Charles B. Carpenter

    [The Bureau of Mines selected Anahuac for a petroleum-engineering study because it is one of the notable fields of the Gulf Coast region. It is outstanding because the producing formation is very thic

    Jan 1, 1941