Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - Diffuse-flow Hydrothermal Field in an Oceanic Fracture Zone Setting, Northeast Pacific: Deposit Composition

    By James R. Hein, Jane Reid, Robert W. Embley, Se-Won Chang, Randolph A. Koski

    "Abstract - This is the first reported occurrence of an active hydrothermal field in an oceanic fracture zone setting. The hydrothermal field occurs in a pull-apart basin within the Blanco Fracture Zo

    Jan 1, 1999

  • CIM
    Cypher Environmental ? Earthzyme Soil Stabilization

    Once applied, EarthZyme reduces the tendency for a road to exhibit common maintenance issues: wash-boarding, rutting, heaving, potholing and dust.

    Aug 1, 2013

  • CIM
    The Noranda Process after six years of operation

    By A. G. Storey, J. B. W. Bailey

    "The Noranda Process at the Horne Division ofNoranda Mines Limited now smelts approximately 350,000 short dry tons of concentrate a year, which is 40% of the total smelter throughput. Campaigns are av

    Jan 1, 1980

  • CIM
    Fine sizing by Cyclosizer and micro-sieve

    By M. Leroux, J. A. Finch

    "Sizing below 38 µm (400 mesh) is an increasing requirement in mill testing laboratories. The Cyclosizer is gaining wide acceptance in this role. A recent alternative is to use electro-formed sieves (

    Jan 1, 1982

  • CIM
    Chinese refractory raw materials in the 1990s

    By William H. McCracken, William G. Holroyd

    "The People's Republic of China could very well be considered the largest untapped mineral and metal resource in the world. The proven reserves of antimony, barite, bauxite, fluorspar, graphite,

    Jan 1, 1991

  • CIM
    Mines Aurizon Ltée: Casa Berardi et Bien Plus

    By Martin Bergeron

    Producteur d?or de taille intermédiaire Mines Aurizon Ltée Bureau-chef àVancouverMine et projets localisés au Québec2

    May 1, 2011

  • CIM
    Get More Reliable Production from Existing Mobile and Fixed Assets ?Technology Advancements to Optimize Asset Performance

    By Keith Donovan

    Why are we here? Improve equipment performance & health ? Eliminate undesirable downtime and expensive secondary damage ? Maximize equipment life, optimize running costs (reduce costs) ? Improve s

    May 1, 2009

  • CIM
    Secondary Copper Smelting

    By B. Karnath, K. Guha, S. Tandon

    At Jhagadia Copper Ltd (India), Copper is produced through secondary route using Top Blown Rotary Converter (Kaldo Furnace). The basic raw material being treated includes Matte-slag Reverts, Copper Ca

    Jan 1, 2007

  • CIM
    The history of gold discoveries in Canada - an unfinished story

    By Donald A. Cranstone

    "This paper provides a bird's eye view of the pattern of gold discoveries since 1823, the year of Canada's first gold find, up to 1983. Within this 160-year period, more gold was discovered

    Jan 1, 1985

  • CIM
    1995 Federal Budget Targeting expenditure

    By Robert B. Parsons

    "Finance Minister Paul Martin's second budget might be good for Canada's mining industry in the long run, but the budget raises a number of concerns for the industry in the near term. The bu

    Jan 1, 1995

  • CIM
    The Influence of both Cation and Anion Type on Leaching Efficiency of Lanthanides from Ion-Adsorption Ores

    By V. G. Papangelakis, G. A. Moldoveanu

    "One of the major commercially viable secondary sources of rare earths elements (REE) are the ion-adsorption ores, containing 0.05-0.3 wt% rare earth oxides physically adsorbed on the surface of clay

    Jan 1, 2016

  • CIM
    Overview of the Foothills Research Institute

    By Marc Symbaluk

    Core Programs Current ? Aboriginal Involvement Program ? Adaptive Forest Management / Forest History Program ? Grizzly Bear Research Program ? Natural Disturbance Program ? Foothills Growth and

    May 1, 2008

  • CIM
    New Assessment Technique for LHD Vehicle Visibility

    Over the last three decades, the mining industry has been moving towards more underground mechanized mining methods and the number of LHD vehicles utilised has increased. The growth of mechanization a

    May 1, 2004

  • CIM
    Gas dispersion measurements in flotation machines

    By J. A. Finch

    "Gas dispersion in flotation defines the efficiency of the process once the chemistry has been established. There are three measurements, superficial gas velocity, gas holdup, and bubble size, which a

    Jan 1, 2002

  • CIM
    The SART Process: Killing the Sacred Cows

    By M. Melashvili

    "The SART Process was introduced to the gold mining industry in the late 1990s and several commercial plants were built over the following 10 to 15 years. Most of these plants have operated well and e

    Jan 1, 2016

  • CIM
    Design and selection of equipment for deep underground mine pumping systems

    By M. J. Davie, D. S. Ross

    "The successful design of a new mine water pumping system is in part dependent upon the accuracy with which the operating conditions can be forecast. This paper outlines the data which should be obtai

    Jan 1, 1980

  • CIM
    Resource Expansion at the Renard Diamond Project, Québec

    By Matt Manson

    Renard?1-10 kimberlite pipes and ?Lynx-Hibou?kimberlite dyke system within ?Foxtrot?property 50/50 JV with SOQUEM, Stornoway operator 2001: Discovery of the Renard kimberlite pipes 2003: Discovery

    May 1, 2010

  • CIM
    Ground Support Audit at Brunswick Mine ? Data Collection and Results Management

    Ground support audits are sometimes necessary in ageing underground mines. Usually, the purpose of such audits is to assess the state of the ground support in various parts of the mine, identify areas

    May 1, 2009

  • CIM
    Measurements of deformation and stress variations in mine pillars

    By A. P. Bois, K. Saleh, A. Ghorbal, V. Hajiabdolmajid, G. Ballivy

    "The knowledge of the initial stress field is not always sufficient to ensure the stability of mining stopes due to the high-stress variations generated by mining. Monitoring of these openings is then

    Jan 1, 2003

  • CIM
    System drivers in the performance of auxiliary ventilation systems

    By I. R. Muirhead, S. Frimpong

    "The mechanization of mining operations in underground coal mines has led to faster cutting rates of coalfaces with increased levels of emission of gaseous and particulate contaminants in the workings

    Jan 1, 2003