Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the Future
By Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi
At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con
Jan 1, 2019
-
Extension of the Comminution Energy Curves and Application to Stirred Milling Performance
By P. Radziszewski
"The comminution energy curve is a profoundly simple graphical technique that displays detailed operating efficiency information for industrial comminution processes. The database underlying the meth
Jan 1, 2016
-
On the Role of Bubble Size in Column Flotation
By Jose R. Hernandez-Aguilar
"Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll
Jan 1, 2011
-
The Economics of Individually Motorized Rail Cars in Block Caving Operations
By Scott A. Stebbins
Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera
Nov 1, 2011
-
Assessing the Returns to Copper Exploration, 1989-2008
By R. A. Leveille, M. D. Doggett
"Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines
Jan 1, 2009
-
Mine Planning Guidelines for Developing Sustainable Closure Drainage Systems
By Leslie F. Sawatsky
Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie
May 1, 2004
-
Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall
By H. Warren Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
May 1, 2002
-
Hardening of Low-Alloyed Gold
By Jörg Fischer-Bühner
Conventional 22ct Au jewellery alloys are comparably soft in the as-cast and soft-annealed state and hardening by cold-working is the only way of giving strength to the jewellery. The paper first focu
Oct 1, 2003
-
Material Balancing of Assays From on-Stream Analyzer
By Claude Bazin
"The On-Stream Analyzer has proven and is still proving to be an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilization
Jan 1, 1995
-
Grinding Calculations Related to the Application of Large Rod and Ball Mills
By C. A. Rowland Jr
"I. INTRODUCTIONFred C. Bond's ""Third Theory of Comminution"" (1) was published in 1952. The mathematical statement of the Third Theory is the well-known Bond Formula:where W - Kw H per short tonWl -
Jan 1, 1972
-
Development of the Rainy River Gold Project and Processing Plant
By Paolo Toscano, Dave Hall
"This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m
Jan 1, 2016
-
Thompson 1-D Deposit Geology and Structure
By Rob Stewart
Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G
May 1, 2006
-
Implementation of a Flotation Expert Control System at the Raglan Mine
By G. Couture
"The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o
Jan 1, 2015
-
First Commercialisation of the Albion Process™ For Copper
By Paul Voigt, Mike Hourn, Glenn Stieper
Sable Zinc Kabwe Limited ("Sable") is a base metal processing plant, two kilometres south of Kabwe Town in Central Province, Zambia. The region has a rich history in mining and minerals production, be
Jan 1, 2019
-
Real Time Performance Management in Metallurgical Operations
By O. A. Bascur, J. Patrick. Kennedy
"The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic
Jan 1, 2004
-
Robotic Mapping of Underground Drift Networks
By Unal Artan
It is well known in the robotics community that the ability to determine the position of vehicles in real time is a key enabling technology required for automation, traffic management, and to ensure s
Oct 1, 2009
-
Development of a Cadmium Removal Process for Vale’s Long Harbour Hydrometallurgy Plant
By P. C. Holloway, A. Tshilombo, T. Xue, M. J. Collins, R. Lopetinsky, I. Mihaylov, I. M. Masters
The Voisey’s Bay deposit contains a trace amount of cadmium, which reports to solution during pressure leaching of the nickel concentrate at Vale’s Long Harbour Hydrometallurgy Plant, and must be remo
Jan 1, 2019
-
Effects of the Type of Water on the Selective Flotation of Pyrochlore from Niobec
By E. Esponosa-Gomez, J. A. Finch, A. R. Laplante
"Water quality plays an important role in oxide flotation. The effects on selective flotation of fine (1-16 um) pyrochlore of two types of water used at the Niobec concentrator, potable and plant recy
Jan 1, 1986
-
Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente
By D. Komljenovic, J. Paraszczak
"This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels
Jan 1, 2004
-
Milling of Noranda Process Slags
By P. W. Godbehere, B. W. Brooks
"This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced
Jan 1, 1977