Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • CIM
    Stochastic Mine Planning Optimization: New Concepts, Applications and Monetary Value in an ever Uncertain Market

    By Roussos Dimitrakopoulos

    Conventional approaches to estimating reserves and optimizing mine planning and production forecasting result in single, often biased forecasts. This is largely due to the non-linear propagation of er

    Oct 1, 2009

  • CIM
    A Review of ISL Mining at the Highland Uranium Project

    By Laurence McGonagle

    "The Highland Uranium Project (HUP) is located approximately sixty miles northeast of Casper, Wyoming and is owned and operated by Power Resources, Inc. (PRI). With an annual production of680 tonnes (

    Jan 1, 1998

  • CIM
    Paragenesis of Fluorspar Deposits on the Southern Burin Peninsula, Newfoundland, Canada

    By B. A. Sparkes, J. H. Reeves

    "The St. Lawrence Granite hosts vein-type fluorite mineralization that was mined until 1977. Recent drilling identified a significant fluorite-bearing structure hosted in adjacent meta-sedimentary cou

    Jan 1, 2016

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Practical Operational Aspects of Dense Medium Cyclone Separation

    By Faan Bornman

    "Reeves and Platt1 stated that dense medium separation is one of the most complex unit processes in mineral processing today particularly if cyclones are used. It is also the most efficient gravity co

    Jan 1, 2014

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014

  • CIM
    Froth Flotation: The Kinetic Approach

    By R. R. Klimpel

    "SYNOPSISA discussion of the importance of flotation rate in the analysis of mineral flotation is presented. In particular, the highly interactive nature of the flotation ""system"" is emphasized wher

    Jan 1, 1984

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010

  • CIM
    Mine Water Management Challenges, Technologies, Solutions

    By Graham Sim

    Agenda ?The Water Challenge ?Examples from Three Case Studies ?Mine Drainage, 99% recovery ?Mine Drainage, 80% recovery ?Road Dust Control ?Technology Development ? Conclusion Global water ch

    May 1, 2011

  • CIM
    Copper Production Increase at the Horne Smelter

    By Yves Prévost, Guy St-Amant, Guillaume Dion

    In 2010, the foreseen increase of copper grade in feed concentrate at the Horne Smelter was a significant challenge to maintain a steady copper flow throughout the process. The Horne Smelter process i

    Jan 1, 2019

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    What are the Opportunities and Challenges for Women in Fly-in-fly-out (FIFO) Mining in Canada? An Exploratory Study

    By Costa

    The fly-in-fly-out (FIFO) mining model has significant implications for the industry as it plays an important role in fulfilling the economic, social and workforce needs of the contemporary mining ind

    May 1, 2006

  • CIM
    Partial Roasting of Copper Concentrate with Stabilisation of Arsenic and Mercury

    By K. Lundholm, M. Andersson, L. Nevatalo, Å. Holmström, L. Hedström

    "Several copper deposits have the arsenic bearing minerals enargite (Cu3AsS4) and tennantite (Cu12As4S12). Since this mineral contain both arsenic and copper, it is not possible to remove the arsenic

    Jan 1, 2014

  • CIM
    Improved Cleaner Circuit Performance at the Degrussa Copper Mine with an In Situ Column Sparging System

    By E. Wasmund

    "Sandfire’s DeGrussa Copper-Gold operation in West Australia is a new high grade copper sulfide mine, which includes a 1.5 Mtpa concentrator which was completed in 2013.Early after commissioning, it w

    Jan 1, 2016

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Nevsun Resources NSU ? TSX & AMEX Mission: To build a mining company taking exploration discoveries into production

    TABAKOTO / SEGALA ? Annual gold production approximately 100,000 oz ? Debt free ? Unhedged ? Combined surface reserves 949,000 oz ? Combined 9 year life Tabakoto open pit reserve 568,000 oz (3.4

    May 1, 2006