Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction
By P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results
By Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Construction Technique Used To Build The Drilled Shafts For The Victory Bridge
By T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005
-
Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts
By Giuliana A. Zelada-Tumialan
Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.
Jan 1, 2009
-
New Focus: Environmental Impact Reduction of Proper Slurry Waste Management
By Zachary Q. Maassen
The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p
Jan 1, 2018
-
Foundation Design And Construction In Variable Rock
By Joel Moskowitz
A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be
Jan 1, 2002
-
Experience Gained At The Application Of Atlas Piles In Poland
By Kazimierz Gwizdala
In recent years, in Poland the ATLAS piles have been successfully applied for some constructions near Gdansk. The piles have been used as foundations for housing and another areas of civil engineering
Jan 1, 2006
-
Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis
By J. Nakayama
Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of
Jan 1, 1996
-
Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall
By D. A. Bruce
To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic
Jan 1, 1989
-
A Study in Extreme Event Large Displacement Analysis of Large Diameter Piles
By Bret N. Lingwall, Byron Foster
The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t
Jan 1, 2018
-
Mini-Pile Design And Construction Methods Change To Mitigate Soil Loss Through Glacial Till
By Cassandra A. Wetzel
Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between
-
The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)
By Christian Besson
This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv
Jan 1, 2002
-
Bored Piles With Base Preloading By Grouting - The Polish Experience
By Bolestaw A. Ktosihski
Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr
Jan 1, 2006
-
Advances In Seismic Design Considering Soil- Structure Interaction
By Y. C. Han
The advances in seismic design considering soil-structure interaction or soil-pile-structure interaction are described using a substructure approach. The nonlinearity of soil is considered approximate
Jan 1, 2010
-
Rock Sockets
By D. E. Sherwood
Mr. Tamaro introduced his paper which concerned the construction of foundations for the buildings and related infrastructure of the World Financial Center on a reclaimed shoreline site at the Southern
Jan 1, 1991
-
Kinematic Response Characteristics of a Piled Raft Foundation
By Ramon Varghese, A. Boominathan, Subhadeep Banerjee
Pile raft foundation system has been accepted as an economic foundation design for high rises and heavily loaded structures. Seismic response analysis of PR foundation systems involves complex pile-so
Jan 1, 2018
-
Instrumented Driven Steel Tube Piles At Canary Wharf, London
By A. R. Gaba
Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are
Jan 1, 1989
-
Deep and Shallow Soil Mixing for the SR-83/US-331 Choctawhatchee Bay Bridge Project in Santa Rosa Beach, Florida
By Alessandro Bertero, Dylan Pearson, Wesley Schmutzler, Matteo Bertoni
"The SR 83/US 331 highway is located in the Florida panhandle, where it connects the Walton County beaches to the I-10 corridor. The roadway is of vital importance to the economy of the area as well a
Jan 1, 2017
-
Confirmation Of Composite Ground Design Using Field Plate Tests
By Timothy C. Siegel
In response to a solicitation for ground improvement for the construction of a new hospital in Owensboro, Kentucky, the team of Berkel & Company Contractors and Dan Brown and Associates PC designed an
Jan 1, 2011
-
A New Analysis Of Data From Statnamic Tests On Piles In Clay
By William F. Anderson
A series of pile load tests (maintained load tests, constant rate of penetration tests at different rates, and statnamic tests) was carried out on an instrumented model pile installed in clay beds pre
Jan 1, 2006