Hole Deviations in Mining Operations: Types, Sources and Effects
By Sam Kangwa, Thomson Sinkala
Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has
Jan 1, 2004
-
Modeling of Dynamic Break in Underground Ring Blasting
By Troy Williams, Chris Preston, Ian Lipchak
"Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale
Jan 1, 2016
-
Pre-Splitting With The New AIRDEK Technique
By David G. Borg, John Bussey
The new AIRDEK (tm) technique for pre-splitting in surface coal mines produces highwall conditions that have greater safety with lower costs for explosives, labor, and drilling. Successful application
Jan 1, 1988
-
Improvements in Quarry Blasting Cost Effectiveness
By P Cotton, N Cox
The Brisbane City Council has implemented a program of continual improvement at its Mount Coottha Quarry in the heart of Brisbane, Australia. The program has been underway for the past 6 years, and ha
Jan 1, 1996
-
Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization
By Sushil Bhandari, Amit Bhandari
Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field
Jan 1, 2019
-
Relationship between peak particle acceleration, velocity and displacement of blast vibration
By Ruilin Yang
The following simple equations are frequently used within the blast vibration community;PPA f PPV v = 2p · , PPV f PPD d = 2p · ,a f PPV PPA 2p = , and v f PPD PPV 2p = where, PPA is the peak particle
Jan 1, 2012
-
Wave Interference Attenuation Relationships and Prediction
By Kimberlee Falkenstein, Volha Kibitkina, Jessica Steeves
A series of experiments were conducted to obtain site specific constants for the vibration produced by a single charge and by more charges detonating in sequence, using short delay intervals. All char
Jan 1, 2013
-
Critical Delay Timing in Multi-Level Mass Stope Blast Design
By Dale Preece, Stephen Chung, Qian Liu
Stoping is one of the widely adapted methods in underground mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sub- level in the ore zone and blasted ring by
Jan 1, 2003
-
Generating Site Specific Custom Blast Designs with Modern Blast Monitoring Instrumentation Systems
The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and
Jan 1, 1991
-
Blast-Induced Heave Modeling in Three Dimensions
By Dale Preece, Ayman Tawadrous
This paper presents a number of examples of three-dimensional blast modeling in both surface and underground environments that include time-delay explosive decking. These examples include: 1) quarry b
Jan 1, 2014
-
Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study
By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody
Nowadays, with such a focus on environmental protection, surface mining activities have come under pressure to ensure their activities do not adversely affect the local surroundings. As part of the ex
-
Underwater Blasting and Train-induced Ground Vibrations on 80 Years-old Building
By Paulo José Costa Couceiro Junior, Manuel Lopez Cano
In 2011, two historic outcrop rocks known as Teffé and Itapema located in the navigation channel of the Port of Santos, Brazil (Latin America’s largest port) – were excavated by drilling and blasting
Jan 1, 2016
-
Civil Tunnelling with Electronic Blasting Systems - Early Experience in Korea
By Dave Kay, Young-Suk Song
To meet the needs of South Korea's rapidly expanding economy, a large number of infrastructure projects are under way to improve transportation efficiency within the nation. These projects include hig
Jan 1, 2005
-
Fire and Explosion of a Mobile Explosive Manufacturing Unit
By Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo
On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons
Jan 1, 2016
-
Discrete Element Modeling of Rock Blasting in Benches, with Joints and Bedding Planes - Initial Development
By Dale S. Preece
A Discrete element computer program named DMC @istinct Motion Code) has been developed for modeling rock blasting. This program employs explicit time integration and uses spherical or cylindrical elem
Jan 1, 1995
-
Borehole Deviation Control Using Electronics: An Euler’s Approach
By Francisco Sena Leite, Pedro Brito, Gean Frank, PhD Soeiro de Carvalho, Jose, Vinicius Miranda
The consequences of rock blasting with explosives are directly related to the accuracy of drilling and, because they have an effect on fragmentation and ground level, they should be controlled to ensu
Jan 1, 2019
-
Principles and Controls for Close-In Blasting Structures
By Wilfred G. Comeao
Close-in blasting occurs every time the use o f explosives for excavation or demolition requires the surpassing of the commonly accepted cosmetic damage criteriain order to arrive at reasonable and pr
Jan 1, 1991
-
Evaluation of the Methods to Determine Constituents of Bulk Commercial Explosives used in the Mining Industry
By Kush Patel, Gary Cavanough
Mining operations consume over 2.5 Billion Australian dollars’ worth of bulk explosives annually (Richardson, 2018). Despite the large volume of product used, current practices only conduct a cup dens
-
Understanding Toxic Fumes from Mining Explosives
By Michael S. Wieland
"Toxic fumes cause fatal andnonfatal incidents in underground mining, where the working environment tends to trap the fumes, hindering the restoration of non-harmful conditions. Workers can underestim
Jan 1, 1997
-
Expansion of the Panama Canal
By Tom Treleaven
The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has
Jan 1, 1997