    Design And Start Up Of The Cortez Gold Mines Pipeline Mill

    By R. N. Powell

    The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the

    Jan 1, 1999

  • SME
    The application of an improved multi-scale computational modelling techniques to predict fugitive dust dispersion and deposition within and from surface mining operations

    The extraction and processing of minerals from surface mines and quarries can produce significant fugitive emissions as a result of site activities such as blasting, unpaved road haulage, loading, pri

    Jan 1, 2009

  • SME
    Using Geometallurgical Models To Aid In Metallurgical Testwork For Pre-Feasibility Projects, La Colosa, Colombia

    The La Colosa, Colombia porphyry gold deposit is currently in the pre-feasibility stage. This large deposit has many types of gold mineralization: native gold, electrum, and tellurides. These variatio

    Feb 27, 2013

  • SME
    The Mine Central Control Room: From Concept To Reality

    By K. Short

    Today?s modern mining operations have literally dozens of applications and systems generating data whose information very often, are not crossed or centralized for operational decisions. In remote lo

    Feb 27, 2013

  • SME
    The application of vertically-mounted jet fans in ventilation shafts for a rail overbuild

    By R. E. Ray

    Compared to conventional fully ducted axial and centrifugal fan systems, jet fans can offer a number of advantages for control of smoke during fire emergencies and dilution of diesel engine exhaust pr

    Jan 1, 2009

  • SME
    Vernal Mine: 19 Years Without a Lost-Time Accident

    By John B. Spencer

    Earlier this year, Simplot Phosphates achieved a safety milestone at its Vernal, UT phosphate operations. In March, the entire operation reached achieved seven years without a lost time accident. An

    Jan 1, 2004

  • SME
    Tunnel Boring Machine Development

    By Martin Herrenknecht

    Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u

    Jan 1, 2008

  • SME
    Mine Power Systems

    By Christopher J. Bise

    INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper

    Jan 1, 1986

  • SME
    Industrial Minerals 2008 - Ball Clay

    By R. L. Virta

    Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue. Thank y

    Jan 1, 2009

  • SME
    Improved Methodology For Contact Angle Measurements On Coal (Heterogeneous) Surfaces

    By J. Drelich, M. Pawlik

    An improved experimental procedure to measure contact angle has been consolidated with coal surface preparation involving polishing with abrasive paper, alumina powder, and a cloth, followed by ultras

    Jan 1, 1999

  • SME
    Advances In Autogenous And Semiautogenous Grinding

    By Vladimir G. Kochnev

    Crushing and grinding account for the major portion (60 to 80 percent) of the overall expenses for ore processing. Autogenous (AG) and semiautogenous grinding (SAG) have been considered a step forward

    Jan 1, 2008

  • SME
    Mine Preplanning

    By Christopher J. Bise

    INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula

    Jan 1, 1986

  • SME
    Earth Pressure Balance Tunneling In Canada

    By Laura McNally

    In 2006, McNally International Inc., in a joint venture partner-ship with Aecon Constructors, was the successful bidder on two York Region Tunnel Projects: the Bathurst Collector/Langstaff Trunk Sewer

    Jan 1, 2008

  • SME
    Coping with Boulders in Soft Ground TBM Tunneling

    By Peter B. Dowden, Robert A. Robinson

    Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper

    Jan 1, 2001

  • SME
    Cattle Aid Reclamation at Robinson Mine in Nevada

    Inn mining communities throughout the western United States, cows have always been part of the landscape as they graze on surrounding rangelands. Until recently, mining companies regarded these anima

    Jan 1, 1999

  • SME
    Batu Hijau: From Discovery to Production

    By Thomas J. DeMull

    Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the

    Jan 1, 2002

  • SME
    An Evaluation Of The Risks Of Lung Cancer And Mesothelioma From Exposure To Amphibole Cleavage Fragments

    By John F. Gamble

    Amphiboles are hydrated mineral silicates five of which occur in asbestiform habits as asbestos grunerite (amosite) asbestos, riebeckite (crocidolite) asbestos, anthophyllite asbestos, tremolite asbes

    Jan 1, 2007

  • SME
    Exploration Decision Analyses for the Brightwater Tunnels

    By L. Maday, V. J. Perrone, M. B. Gilbert

    INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen

    Jan 1, 2005

  • SME
    Keys To Selecting An Expert Electric Motor Shop

    By Fredrick Fränding

    In mining and quarrying operations, electric motors can fail for a variety of reasons. Some failures are directly linked to demanding production requirements and contaminant-laden environments and, co

    Jan 1, 2009

  • SME
    Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel Project

    By Stephen M. Smading

    The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b

    Jan 1, 2009