    A decade of regional geochemistry in China: the National Reconnaissance Project

    By Xuejing Xie, Tianxiang Ren

    Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). Standardised stream-sediment sampling procedures have been

    May 1, 1991

  • SAIMM
    A decision analysis guideline for underground bulk air heat exchanger design specifications

    By M. Hooman, W. M. Marx, R. C. W. Webber-Youngman

    This paper discusses a study that investigated different underground bulk air heat exchanger (>100 m3/s) design criteria. A literature review found that no single document exists covering all design c

    Jan 1, 2015

  • SME
    A Deeper Look At Contractor Injuries In Underground Coal Mines (241f5ad9-c9e1-431b-b055-25a9edd50ee4)

    By D. Pappas

    Over the past decade the number of contractors working in underground coal mines has nearly doubled; however, the effect this has had on the industry?s injury rates has been the subject of much specul

    Jan 1, 2011

  • ISEE
    A Definition of Criteria Required to Evaluate the Results of Production Blasts

    By Norm Tienkamp, Normand Martineau

    Through the normal course of operation, mine operators are living situations where blast results need to be measured. It becomes the supervisory group responsibility to select evaluation parameters wi

    Jan 1, 1996

  • AUSIMM
    A Deformed Gold-Arsenopyrite-Pyrite Deposit Hosted in Peralkaline Granite Porphyry at Sams Creek, West Nelson, New Zealand

    By K Faure

    At Sams Creek a gold-bearing, peralkaline granite pophyry dike intrudes Ordovician-Silurian metapelite and quartzite. These metasedimentary rocks have undergone three phases of folding: a first phase

    Jan 1, 2003

  • AUSIMM
    A Depositional Model for the Morley Coal Measures, Ohai Coalfield, Southland - Applications to Coal Exploration and Mining

    The Morley Coal Measures (Upper Cretaceous) at Ohai Coalfield were deposited in an intermontane basin alluvial environment of entirely terrestrial aspect. Within this regional setting, three distinct

    Jan 1, 1985

  • AUSIMM
    A Description of the Iron Ore Industry at Iron Knob and Whyalla

    The whole of the iron ore required by the Broken Hill Proprietary Company Limited at the Newcastle Steel Works, and Australian Iron and Steel Limited, at Hoskins' Kembla Works, is drawn from the

    Jan 1, 1937

  • SAIMM
    A design methodology for mechanised stoping with stable support pillars at depth in the Bushveld Complex

    By D. A. Spencer, L. J. Gardner

    In light of the apparent productivity benefits provided by mechanised stoping, Impala Platinum Limited commissioned a study to investigate its possible implementation for mining reserves located 1200

    Jan 1, 2003

  • SAIMM
    A design protocol for mining remnants in hard rock mining operations utilising a rock mass classification system

    A well known rock mass classification system has been altered slightly to address the issues found under remnant mining conditions. By detail study of the expected fracture patterns and local geology,

    Jan 1, 2003

  • SME
    A design tool for improving the safety of highwall mining operations - SME Transactions 2015

    By Y. Luo

    Highwall mining, which is a relatively new mining method, is a preferred and often the only feasible method for extracting coal reserve left by surface mining operations in areas with steep terrain an

    Jan 1, 2015

  • AUSIMM
    A Detailed Assessment of Concentrator Performance at Broken Hill South Limited

    By S B. Stewart, C J. Restarick

    Over a four-hour period of steady plant operation samples were taken at regular intervals frum points within the grinding and flotation circuits. Size fractions of each composite sample were analysed

    Jan 1, 1971

  • AUSIMM
    A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)

    By Restarick C. J & Stewart P S B, Kelsall D. P

    Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse

    Jan 1, 1980

  • NIOSH
    A Dictionary Of Mining, Mineral, And Related Terms - Preface

    This dictionary is published by the Bureau of Mines as a contribution to the mining and mineral literature in the belief that it will fill a recognized need. Several attempts have been made over the

    Jan 1, 1968

  • ISEE
    A Digital Surface Remote Blasting System

    By Peter Reinders, Dirk Hummel

    This paper describes a newly developed Surface Remote Blasting System (SURBS) for electronic detonators, which is currently being introduced into surface blasting applications. The rationale for devel

    Jan 1, 2005

  • AUSIMM
    A Dilution-based Stability Graph for Open Stope Design

    By F T. Suorineni, L Baird, A Papaioanou, D Hines

    The Mathews et al (1981) stability graph was developed to provide guidance in the determination of stope sizes to control dilution in bulk mining of large orebodies. Longhole and sublevel open stoping

    May 9, 2016

  • SME
    A Disappointing Year for Industrial Minerals Production

    A glance at the accompanying table reveals that for the first time in many years the industrial minerals field did not post significant gains in production. Gypsum, cement, sand and gravel, and cru

    Jan 5, 1980

  • SME
    A Discrete Event Simulation and Data‑Based Framework for Equipment Performance Evaluation in Underground Coal Mining - Mining, Metallurgy & Exploration (2021)

    By MUSTAFA ERKAYAOGLU, ENVER YILMAZ

    Coal is still a part of energy generation worldwide and has a significant role in the sustainable development of countries. The amount of shallow coal deposits is getting scarce, making efficient unde

    Jul 2, 2021

  • SME
    A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects

    By Lei Fu

    In the wake of the collapse of the ceiling panels in the I-90 section of the Central Artery/Tunnel (CA/T) Project in 2006, the long term performance of tunnels became the focus of the tunneling indust

    Jan 1, 2008

  • SME
    A Discussion On TBM Cutter Change Time And Cutter Life

    By E. Farrokh

    Estimation of the cutter life and cost is a part of evaluating performance for a hard rock TBM in any project. Various approaches has been proposed for calculation of disc cutter life in various rock

    Feb 27, 2013

  • SME
    A Dissolution Kinetic Model For Metal Powders A Case Of Varying Surface Area

    By Kenneth N. Han, Peter Nam-soo Kim

    A kinetic model for leaching of particulate metals in a batch system has been developed. The leaching mechanism has been analyzed by solving a series of ordinary differential equations relating hetero

    Jan 1, 2005