Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of Pile Foundation For Railway Viaducts
By M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project
By Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001
-
Construction of prime coking coal washeries in India
By Bali. D. D., S. Chattopadhyay
"The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta
Jan 1, 1986
-
Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works
The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.
Jan 1, 1924
-
Construction Of Shin-Kanmon Tunnel On Sanyo Shinkansen
By Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio
By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Construction of the Brunswick Street Rail Tunnels
The paper, one of two papers on the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling conference, describes documentation, tendering and construction aspects.Ten
Jan 1, 1993
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”
By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007
-
Construction of the Combined Sewage Overflow Tunnel for the City of Fall River
By Shemek Oginski
The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast
Jan 1, 2005
-
Construction Of The East Side Access Manhattan Tunnels
By Don Hickey
The MTA in conjunction with LIRR, are in the process of expanding one of the largest commuter railroads in the country, with over 260,000 passengers a day. The LIRR, which provides 700 passenger train
-
Construction of the Lewis Street CSO Tunnel, Nashville, Tennessee
By Patrick J. Doig
The Lewis Street CSO Tunnel is an important element in the efforts of the Metropolitan Government of Nashville and Davidson County (Metro) to improve the treatment of waste-water in the area. The t
Jan 1, 1997
-
Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History
By Bob Rautenberg
The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]
By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Construction of the NATM Tunnel at San Diego State University
By Justin Brown, Michael Kobler, Dave Ragland, Bob Shufflebotham
PROJECT OVERVIEW As the sun-bronzed San Diego students strolled casually to class, mining crews from Atkinson Construction were working only 9 meters below the surface. The330 meter long, 11.3 met
Jan 1, 2003
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston
By J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long
-
Construction Of The Pacheco Pumping Chamber And Shafts
By Russell Clough
The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re
Jan 1, 1985
-
Construction of the Pergau Hydroelectric Power Project, Malaysia
By Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria
By Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California
By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Construction Of The South Interceptor Montreal, Quebec, Canada
By Jacques Mongrain, Serge Barbeau, Gary Brierley
The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels
Jan 1, 1987