Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill
By Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
Design and Installation of Gudrun Platform Jacket Piles
By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Design and Installation of Helical Piles for Support of Bridge Pier Foundation
By David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer
By Naresh Koirala
The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft
Jan 1, 2004
-
Design And Instrumentation Of A Large Reverberation Chamber
By Roy C. Bartholomae, Jeffrey Shawn Peterson
1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci
-
Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits
By Shaw-Shong Liew
This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa
Jan 1, 2002
-
Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, Paloncha
By Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah
NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco
Jan 1, 2007
-
Design and Operation of a Counter Current Gas Scrubbing System
For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes
Jan 1, 1949
-
Design and Operation of a Future Mill
By D. E. Pickett, J. A. Roland Faucher
"INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow
Jan 1, 1979
-
Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process
The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.
Jan 1, 1993
-
Design And Operation Of Primary Grinding Mills
By A. A. Dor
Out of nine new major iron ore concentrators put in operation during the last three years, or expected to be commissioned in 1968, seven incorporate primary grinding mills and have a total design capa
Jan 11, 1968
-
Design And Operation Of The Hydrochem Flotation Column
By J. C. Schneider, G. Van Weert
Hydrochem Developments Ltd. has developed and put into full scale operation a novel type of vertical flotation column incorporating a multiplicity of mechanically agitated stages. Characteristics of t
Jan 1, 1988
-
Design and Operation of the Key Lake Uranium Mill
By M. Neven, R. A. Steane, E. Lam
"The Key Lake uranium mill is located in Northern Saskatchewan. It treats a high grade, complex uranium and metal sulphide ore. The plant and process are in many respects unique, because commercial tr
Jan 1, 1986
-
Design And Performance Evaluation Of Bored Piles In Sand
By Ashutosh S. Dhar
Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in
Jan 1, 2006
-
Design and Performance of a Longwall Coal Mine Water-Barrier Pillar
By Francis Kendorski
The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were
Jan 1, 2007
-
Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine
By B. P. Watson
Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i
Jan 1, 2014
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, Pennsylvania
By Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134
Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a
Jan 1, 2009
-
Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels
By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister
The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe
Jan 1, 2005
-
Design and Scale-Up Criteria for Column Flotation
By Mankosa MJ, Yoon R-H
A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i
Jan 1, 1993