Search Documents

Sort by

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • DFI
    Design and Installation of Helical Piles for Support of Bridge Pier Foundation

    By David L. Borusiewicz, M. Suri Surendra

    "Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc

    Jan 1, 2014

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • NIOSH
    Design And Instrumentation Of A Large Reverberation Chamber

    By Roy C. Bartholomae, Jeffrey Shawn Peterson

    1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci

  • DFI
    Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits

    By Shaw-Shong Liew

    This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa

    Jan 1, 2002

  • SAIMM
    Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, Paloncha

    By Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah

    NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco

    Jan 1, 2007

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979

  • AUSIMM
    Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process

    The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.

    Jan 1, 1993

  • AIME
    Design And Operation Of Primary Grinding Mills

    By A. A. Dor

    Out of nine new major iron ore concentrators put in operation during the last three years, or expected to be commissioned in 1968, seven incorporate primary grinding mills and have a total design capa

    Jan 11, 1968

  • SME
    Design And Operation Of The Hydrochem Flotation Column

    By J. C. Schneider, G. Van Weert

    Hydrochem Developments Ltd. has developed and put into full scale operation a novel type of vertical flotation column incorporating a multiplicity of mechanically agitated stages. Characteristics of t

    Jan 1, 1988

  • CIM
    Design and Operation of the Key Lake Uranium Mill

    By M. Neven, R. A. Steane, E. Lam

    "The Key Lake uranium mill is located in Northern Saskatchewan. It treats a high grade, complex uranium and metal sulphide ore. The plant and process are in many respects unique, because commercial tr

    Jan 1, 1986

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • SAIMM
    Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine

    By B. P. Watson

    Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i

    Jan 1, 2014

  • DFI
    Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, Pennsylvania

    By Brian H. Greene

    The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo

    Jan 1, 2006

  • SME
    Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134

    Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a

    Jan 1, 2009

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005

  • AUSIMM
    Design and Scale-Up Criteria for Column Flotation

    By Mankosa MJ, Yoon R-H

    A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i

    Jan 1, 1993