Search Documents

Sort by

  • DFI
    Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis

    By B. N. Hira

    A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t

    Jan 1, 1996

  • SME
    Design Of Initial And Final Support Of Pressure Tunnels In The Phoenix "SGC"

    By Timothy P. Smirnoff, Tracy K. Lundin

    INTRODUCTION The City of Phoenix, Arizona is located in the Phoenix Basin watershed which is prone to flash flooding several times each year. The runoff from these storms moves from the mountains i

    Jan 1, 1985

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • ISEE
    Design of Large-Scale Choked Destress Blasts in Mine Pillars Using the Empirical Destressability Index Methodology

    By Richard Brummer, John Hadjigeorgiou, Patrick Andrieux

    Some of the major challenges associated with underground mining at depth and/or under high extraction ratios are related to the resulting high stress levels, which can lead to the failure and collapse

    Jan 1, 2012

  • SAIMM
    Design of lining system for a pressure tunnel on the base of interaction between rock and lining

    By A. Kazemi, M. A. Ahmadi

    Pressure tunnels are constructed nurously in related with powerhouse. In some cases, according to high internal water pressure, rock mass around tunnel can seldom suffer this pressure. So installation

    Jan 1, 2003

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • IOM3
    Design of longwall face support by use of neural network models

    By Jinsheng Chen, S. S. Peng

    The relationship between support performance parameters and parameters representative of mining and roof conditions is characterised by uncertainty, non-linearity and dependence, so the theory of arti

    Jun 21, 1905

  • SME-ICGCM
    Design Of Lower Seam Longwall Operations In Multiple Seam Mining

    By P. Forrest

    Based on the results of mathematical analysis, photoelastic modelling, and case studies, the mechanisms of longwall under- mining interaction has been thoroughly investigated. The effects of using yie

    Jan 1, 1988

  • AUSIMM
    Design of Medium Recovery and Heavy Medium Management Circuits- A Different Approach

    The paper describes the design of the dilute medium and medium recovery circuits installed at the coal preparation plants at the Cornwall Coal Company's Fingal Mine, and the BP Coal Australia

    Jan 1, 1987

  • SAIMM
    Design of Merensky Reef Crush Pillars

    By B. P. Watson

    The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies which strike for many hundreds of kilometres. Mining is extensive, with depths ranging from cl

    Jan 1, 2010

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME
    Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In Boston

    By Verya Nasri

    The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr

  • ISEE
    Design of New On-Site Emulsion Explosives Manufacturing Plants

    By Thomas E. Brown

    Commercd explosives have evolved through this century f?om dynamite through ANFO to the current lines of Water Gels and Emulsions. Water Gels and Emulsions evolved to counter the lack of water resista

    Jan 1, 1998

  • CIM
    Design of paste tailings disposal systems

    By Fred W. Brackebusch

    "The use of paste technology for surface tailings disposal may offer economic, technical, safety, and environmental advantages for both underground and surface mining operations. Paste is a non-Newton

    Jan 1, 2002

  • AIME
    Design Of Permanent Block Stopping To Resist Strata Convergence

    By R. E. Ray, J. W. Stevenson, J. A. Berry

    Conventional concrete block plastered with a cementitious coating is the most common material used in the construction of permanent stoppings to direct airflow in underground mines in the US. All mine

    Jan 1, 1986

  • SAIMM
    Design Of Permanent Intruded Plugs At South Deep Gold Mine

    By G. S. Littlejohn

    In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1

    Jan 1, 2006

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • SME
    Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

    By Irwan Halim, Seung Han Kim

    This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c

    Dec 1, 2022

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SAIMM
    Design Of Primary Samplers For Slurries In Concentrators And Statistical Methods For Measuring Components Of Variance In Sampling

    By H. E. Bartlett

    In the operation of some flotation plants treating platinum ores it was found that there were imbalances between the inputs and outputs. The inputs and outputs were sampled as slurries and it was dete

    Jan 1, 2002