Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project
By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah
By Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Design/Build Agreement For The Niagara Tunnel Project
By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO
By Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History
By Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis
By Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History
By Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast
By Kleine T. H
Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b
Jan 1, 1992
-
Designing an Advanced RC Drilling Grid for Short-Term Planning in Open Pit Mines: Three Case Studies
By J. M. Ortiz
This paper shows the usefulness of geostatistical conditional simulation combined with the quantification of sampling errors obtained from the analyses of fundamental errors ? validated from duplicate
Jan 1, 2014
-
Designing An Oil Shale Mine Ventilation System ? Introduction
By Floyd C. Bossard
In underground mining operations, the over- riding issue has to be protection of worker health and safety. The employees underground, making a living in a dangerous occupation, know these are major is
Jan 1, 1983
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023
By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)
By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
Designing and Operating Heap Leaching Processes with Both Eyes Open
Process engineering principles are used to analyse the features of leaching processes for large masses of low grade, unprocessed ore. Different performance characteristics are related to the numerou
Jan 1, 1994
-
Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City
By Dean Workman
Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th
Jan 1, 2008
-
Designing exploitation and dumping processes in brown coal mines using information technology techniques
By R. Chryst, R. Kus
In the Integrated IT Systems proposed by Przedsie? biorstwo Robót Geologiczno-Wiertniczych—Geological and Drilling Company (PRGW) a network connects a database with all of the departments of a mining
Jan 1, 2003
-
Designing For Paste Thickening
By Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts
"In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated
Jan 1, 2005
-
Designing for Upper Seam Stability in Multiple Seam Mining
Historically, the selection of mining sequence for multiple seam conditions has been based on many factors other than ground control considerations and minimization of interaction effects. Today, nume
Jan 1, 1986
-
Designing Free-Standing Steel Supports for Coal Mine Roof Support
By Sam Spearing
Free-standing supports are commonly used in coal mines in the USA, particularly when longwalling. A recent trend has been the development of prop supports. Prop supports have many advantages over bu
Jan 1, 2008
-
Designing Processing Operations for the Future ù DonÆt Forget Acid Drainage
With the continued implementation of stricter limitations on the discharge of excess process water from all existing and future mining and metallurgical operations, the design and operation of the ent
Jan 1, 2004
-
Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake
By Gordon T. Clark, James R. Struthers, Celal Kirandag
INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men
Jan 1, 2007