Search Documents

Sort by

  • AUSIMM
    A Preliminary Model of a Water-Only Cyclone and its Application to Product Quality Control

    By Spottiswood DJ, Kelly EG, Bull WR

    An empirical model of a 254mm water-only cyclone treating minus 17001im coal has been developed. The model includes the prediction of by-passing, SG50 corrected, water split and the use of a single eq

    Jan 1, 1985

  • ISEE
    A Preliminary Study into the Relationship between Air Overpressure and Face Velocity in quarry Blasting

    By W. J. Birch, R. Farnfield, L. Bermingham

    Whilst a significant body of research has been carried into air overpressure levels that arise as a result of the use of explosives, few published studies have actually tried to relate the movement of

    Jan 1, 2008

  • SME
    A preliminary study of the unsteady states of the ventilation parameters at the longwall face during the shearer operation

    The ventilation conditions at the underground coal mines are influenced; first: by the disturbances of the natural nature (barometric pressure, methane liberation, etc.), and second: by the disturbanc

    Jan 1, 2009

  • CIM
    A preview of things to come?

    By Robert D. Brown

    "The Conservative Government 's budget proposals brought forward on December 11, 1979 have been withdrawn, but they are far from dead. On the contrary, a number of those budget proposals, especia

    Jan 1, 1980

  • CIM
    A Process for Cleaning Molybdenite Concentrate

    By F. K. McKean

    Abstract A discussion of the difficulties involved in the production of a clean molybdenite concentrate introduces the paper. There is a brief description of the various methods for producing molyb

    Jan 1, 1947

  • AUSIMM
    A Process for the Flotation of Chrysocolla

    A Process for the Flotation of Chrysocolla

    Sep 13, 2010

  • AUSIMM
    A Process for the Recovery of Cobalt from Speiss

    By Fennell B

    A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.

    Jan 1, 1983

  • SME
    A Process Mineralogical Study Of Platinum-Bearing Chromite Ores From The Polarurals

    By L. I. Gyrskia, Y. V. Andreev, T. N. Greiver, G. V. Petrov

    Traditionally, chromite ores are regarded exclusively as a monomineral raw material for extraction of chromium. The results of the investigations indicate a wide range of PGM in the Ray-Iz chromites,

    Jan 1, 2000

  • SME
    A production monitoring scheme for continuous mining sections

    By D. B. Gentzler, J. L. Kohler

    A method of monitoring production information (raw tonnage and machine state) from each working section has been developed. The method is based on the sensing of electrical parameters in each section

    Jan 1, 1990

  • SAIMM
    A Progress Report On Ultra-High-Pressure Waterjet Cutting Underground: The Future Of Narrow Reef Gold And PGE Mining

    By C. D. K. Gauert

    High-pressure waterjet technology is proposed as an alternative tool for selective underground mining of high-grade ore sections in stratiform orebodies showing a preferred ?bottom? or ?top? enrichmen

    Jan 1, 2013

  • AUSIMM
    A Progressive, Iterative Approach Leading to Reliable Metallurgical Accounting Sampling Systems

    By F F. Pitard

    The optimization of metallurgical processes requires knowledge of the heterogeneity carried by constituents of interest. The common scenario, almost an industry standard, is to rely on the engineering

    Sep 7, 2015

  • AIME
    A Properly Designed Drilling Fluids Program Can Reduce Total Well Costs

    By Michael A. Toole, O&apos

    INTRODUCTION The tremendous capital investment required to produce a low grade ore deposit demands a reliable answer to the question: "How much does it cost to drill a well to produce the uraniu

    Jan 1, 1979

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • SAIMM
    A Proposed Approach for Modelling Competitiveness of New Surface Coal Mines

    By J. W. Joubert, R. C. W. Webber-Youngman, M. D. Budeba

    "SynopsisCost estimation for surface coal mines is a critical practice that affects both profitability and competitiveness. New mines require these costs to be estimated using available information be

    Jan 1, 2015

  • SAIMM
    A Proposed Method of Dynamic Ore Reserve Assessment for a Caving System of Mining

    By A. F. Spinks, S. P. Nicholls

    "The Lower Orebody at Chingola Division of Nchanga Consolidated Copper Mines, Limited, is a stratified orebody that is mined by a continuous caving system. The accurate determination of the developed

    Jan 1, 2014

  • SME
    A Proposed Model Of A New Laboratory Magnetic Separator For Mineral Processing. - Preprint 09-120

    By M. S. Riyazulla

    A model of a new laboratory magnetic separator has been conceived to cater the needs of process engineers and mineralogists world over engaged in mineral characterization and beneficiation. It would b

    Jan 1, 2009

  • AUSIMM
    A Proposed Modification of the Square Set

    By A. J. MOORE

    When the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode and across it, were composed of panels with rectangular open

    Jan 1, 1912

  • SAIMM
    A Proposed Preliminary Model for Monitoring Hearing Conservation Programmes in the Mining Sector in South Africa

    By O. Nyandoro, K. Khoza-Shangase, M. Madahana, N. Moroe

    "Occupational noise-induced hearing loss (ONIHL) is classified as the leading work-related disability in the mining industry. ONIHL has a negative impact, on not only the health and occupational produ

    Jul 1, 2019

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • SME
    A protocol and standard for mine ventilation studies

    Flawed mining studies have been major contributors to poor investment decisions in mining for many years, contributing to the long period of poor industry profitability. Most of the major mining house

    Jan 1, 2009