Search Documents

Sort by

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics - A Late Cretaceous Bimodal Association, Noumea Basin, New Caledonia

    The transgressive sedimentary sequence of the Noumea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanics of shoshonitic affinities which erupted simultaneously during t

    Jan 1, 1995

  • DFI
    High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place Piles

    By Garland E. Likins

    High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec

    Jan 1, 1995

  • AUSIMM
    High-sulfidation Epithermal Cu-Ag-Au Deposit, Kluwih, Eastern Java, Indonesia – Alteration and Implications for Potential Porphyry Cu Mineralisation

    By J S-L Chan

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Cu-Ag-Au mineralisation at Kluwih prospect in Eastern Java, Indonesia is related to a high-

    Mar 18, 2015

  • IOM3
    High-temperature mine climate simulation model for predicting the effect of mine fire

    By P. Mousset-Jones, G. Danko

    Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t

    May 1, 1991

  • ISEE
    High-wall Control at Anglo Gold Ashanti, Navachab Mine

    By Charles Pretorius, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting

    Jan 1, 2006

  • SAIMM
    High-Wall Control At Anglo Gold Ashanti, Navachab Mine (2dbbeb3c-3655-4c5f-9dba-7c00ed466556)

    By André de Jager, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blastin

    Jan 1, 2006

  • ISEE
    High.Speed 2D Analysis Program Version 1.30

    By Bruce Vandenberg, R F. Chiappetta

    "The High Speed 2D Analysis program allows the user to bring in data from several different sources. Of course, keyboard entry is included as a source. Other data is inputted through the serial port (

    Jan 1, 1989

  • TMS
    Higher education: the quest for the sustainable campus

    By Leith Sharp

    I was confronted with a profound dilemma as an undergraduate engineering student at the University of New South Wales in Australia in 1992. I had been taught that our planetary life-support systems we

    Jan 1, 2010

  • CIM
    Highland Valley Copper: a strategy for increased productivity

    By Poul Hansen

    "In mid-I986, a world-class mining enterprise was created in British Columbia, bringing together the copper mining operations of Lornex Mining Corporation and Cominco into a new entity, Highland Valle

    Jan 1, 1987

  • AUSIMM
  • AUSIMM
    Highlighting key features of the pore structure of iron ore sinter using mercury intrusion porosimetry and X-ray computed tomography

    By D O’Dea, B Godel, T Honeyands, G Evans, T Harvey

    The pores within iron ore sinter are important for producing a high quality material that is strong and easily reduced. The complementary methods of mercury intrusion porosimetry (MIP) and X-ray compu

    Jul 24, 2017

  • NIOSH
    Highlights - Aluminum -

    Reynolds Metals Company announced plans to increase its rate of production of primary aluminum by 17 thousand tons per year by the end of February. Other producers were expected to increase operating

    Jan 1, 1976

  • AIME
    Highlights Of Mining And Exploration Technology In 1961 I-Developments In Mining Technology

    Primarily, 1961 was a year for widespread application of tools and techniques which have become operational in the past several years • • • Raising --Raise climbers and climber raising techniques have

    Jan 2, 1962

  • AUSIMM
    Highly Mineralized Late Archaean Greenstone Belts: Fragments of a Palaeo-Pacific Rim?

    By Perring CS, Vearncombe J. R, Ho SE, Groves DI

    Large Late Archaean greenstone belts in Western Australia, Canada and Zimbabwe, contain abundant mesothermal gold, volcanogenic massive base-metal sulphide, and komatiite-associated Ni-Cu mineralizati

    Jan 1, 1990

  • RMCMI
    Highwall and Spoils Design and Monitoring

    By Tim Peterson

    Factors Controlling Stability Stability of slopes in soft rock, waste dumps or soils is governed by three factors: ?Slope configuration ?Groundwater ?Shear strength

    Jan 1, 2004

  • AUSIMM
    Highwall Mining Trials at Callide Mine

    By Boyd G

    This paper describes the planning, analysis, design and operational experience of highwall mining based on auger drilling techniques applied to thick coal seams exposed in an opencut highwall. Bein

    Jan 1, 1991

  • IOM3
    Highwall mining: practical estimates of coal-seam strength and the design of slender pillars

    To maximise recovery by highwall mining, pillars must be designed which are long, slender and of relatively low width-to-height ratios. The strength of pillars with width/height less than 2 depends pr

    Jun 21, 1905

  • ISEE
    Highway Lane Rental Requirement Compromises Blast Site Safety and Security

    By Harry L. Siebert

    A major Arizona highway project is jeopardizing site safety and security because of the lane rental policy. One million cubic yards of rock must be fragmented to provide two additional lanes parallel

    Jan 1, 1997

  • SME
    Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio

    By Thomas Sisley, Jozef Zurawski, Richard Switalski

    Hilltop Interceptor Contract G is one of the segments of the wastewater control system in the greater Cleveland area. The tunnel is a relief interceptor constructed by the Northeast Ohio Regional Sew

    Jan 1, 1997

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,