Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Integrating Computational Mechanics and Numerical Optimization for the Design of Material Properties in Electronic Packages
By S. Stoyanov, M. Cross
"Silicon components containing transistor circuitry are at the heart of electronic products such as computers, mobile phones, etc. These components are connected to printed circuit boards (PCB's) usin
Jan 1, 2001
-
Integrating Data, Applications and Users
By McAuley T. J
Computer software is an integral part of mining operations today with many sites using six or more software packages on a daily basis. However, the use of these different programs generates the need
Jan 1, 1995
-
Integrating Environmental Factors into Mining Projects (591b660d-e8ad-4113-a4fb-e72d8a203993)
There are a number of examples of how environmental factors have been integrated into the water management aspects of mining projects. The Kingston Lignite project in South Australia, Pine Creek Gold
Jan 1, 1988
-
Integrating Geology and Borehole Geophysics in a Common Earth Model for Improved Three-dimensional Delineation of Mineral Deposits
By W. J. Mcgaughey, M. A. Vallée
"Abstract -The application of geophysical technology to resource delineation aims to improve the quality of resource/reserve estimates by integrating high-resolution survey methods, geophysical modeli
Jan 1, 1998
-
Integrating Geometallurgical Parameters into Mining Grade Control at Operating Mines
By William Shaw
Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de
Oct 1, 2009
-
Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.
By Seal. Thom
Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest
Jan 1, 2008
-
Integrating meso- and micro - textural information into mineral processing: an example from the Ernest Henry Iron-Oxide Copper-Gold deposit, Queensland, Australia
By Maya Kamenetsky, Khoi Nguyen, Natalee Bonnici, Steve Walters, Claire McMahon, Julie Hunt, Ron Berry
"The analysis of meso- and micro-scale textural attributes has been undertaken on ore samples from the Ernest Henry iron oxide-copper-gold (IOCG) deposit in NW QLD. Quantified textural data including
Jan 1, 2009
-
Integrating People, Processes, and Technology in Mining Automation Implementation
By Laura Mottola
This paper outlines a framework for ensuring the success of the implementation phase that follows research and development of new mining technologies and systems. It is based upon recent and past less
Oct 1, 2009
-
Integrating Research and Development in E&C Firms
By Roshan B. Bhappu
Integrating a research and development department into an engineering company's corporate structure can be rewarding to the engineering division, the R&D group, and, most of all, the company&apos
Jan 10, 1980
-
Integrating Technology: Learning from Mine Worker Perceptions of Proximity Detection Systems
By E. J. Haas, K. A. Rost
"This study sought to identify changes in continuous mining machine (CMM) operators’ risk perception and risk behaviors as a result of adding a proximity detection system (PDS) into their environment.
Jan 1, 2015
-
Integrating the Toquepala and Cuajone SX/EW Operations
By Igor Gonzales G.
The Southern Peru Copper Corp. (SPCC) recently built an integrated copper project consisting of dump- and heap-leaching operations at its mine complex in Peru. The pregnant leach solution (PLS) conta
Jan 1, 1996
-
Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area
By K P. Tully
In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf
Jan 1, 1998
-
Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems
By Andrew P. Jarosz
The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are
Jan 1, 1995
-
Integration of CSIR- and CSIRO-type of overcoring rock stress data at the Zedex Test Site, Äspö HRL, Sweden
By F. H. Cornet, D. Ask, O. Stephansson
We have conducted a stress analysis of overcoring stress measurements undertaken at the Zedex Test Site (ZTS) in the Äspö HRL, Sweden. Two different types of overcoring cells have been used at the sit
Jan 1, 2003
-
Integration of gyratory crusher liner wear and operational performance for better crusher management
By P. P. Rosario, D. M. Maijer
The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC
Jan 1, 2006
-
Integration of imprecise and biased data into mineral resource estimates
By E. Machaka, A. Cornah
"Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)
Jan 1, 2015
-
Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) Mine
By K Rozlapa, P Waters, H Middlemis
A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s
Jan 1, 2006
-
Integration of Mineralogical and Geomechanical Data During Exploration in the Regolith
The mineralogy of regolith material for which whole rock geochemistry has already been done can be used to better understand/rank the significance of geochemical anomalies. Case studies show that th
Jan 1, 1997
-
Integration Of Operations And Underground Construction: Sound Transit University Link
By John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
Integration of seismic observations from deep level gold mines with dynamic numerical modelling
By M. W. Hildyard, M. O. Kataka
Seismic integration schemes aim to incorporate the rock mass response provided by the historical seismic activity to improve the ability of numerical models to reproduce future response to mining. Up
Jan 1, 2003