Search Documents

Sort by

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • CIM
    The CMIC / CanmetMINES Comminution Energy Recovery Potential Initiative – The Agnico Eagle Goldex Division Case

    By Yan Germain, Université Laval, Bernard Dallaire, Jocelyn Bouchard, Peter Radziszewski, Gilles LeBlanc, Michelle Levesque, Nicolas Tremblay

    "The comminution process is estimated to be only 1% efficient, resulting in waste energy dissipated as heat, noise, and vibration. Energy recovery from grinding circuits has not been implemented mainl

    Jan 1, 2016

  • ISEE
    Delay Blasting Cap Corrosion of the Nonel by Acid Water

    By Noelia Valencia, Carlos Agreda, Jean Arenales, Juan Llerena

    "In this technical paper is reported the several tests and the preliminary results that has been obtained so far. It must be emphasized that this investigation was started several months ago.On the ot

    Jan 1, 2016

  • CIM
    Forecasting Perspective Reagents for Flotation on the Screening Basis of Chemical Compounds

    By P. M. Solozhenkin, O. I. Ibragimova, I. P. Solozhenkin

    Molecular models of complexes of poorly studied bismuth, gold, and arsenic mineral clusters and reagents were created for use in collector activity forecasting using Chem Bio 3D and ChemOffice2005, wi

    Jan 1, 2016

  • ISEE
    "Suppression of Dust Generation during Blast Demolition of ConcreteColumns"

    By Chulgi Suk, Hoon Park, Hyonsoo Kim, Hakman Kim, Sangho Cho

    Dust emission from blast demolition and other construction activities can be a nuisance; it is widely recognized that fine particles less than 10 µm in equivalent diameter (called PM10) may cause heal

    Jan 1, 2016

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • CIM
    Corrosion Studies for Carbon Steel Pipeline API 5lx70 Exposed to Sea Water at High Fluid Velocities

    By L. Cáceres, G. Leinenweber, P. Bustamante

    "Given the severe scarcity of fresh water sources in Northern Chile the use of seawater has become the only alternative to allow mining expansion. This option however poses several technological chall

    Jan 1, 2016

  • SME
    Fire Design for the Concrete Lining of the Ohio River Bridges East End Crossing Tunnel

    "A fire design innovation of the concrete lining of the Ohio River Bridges East End Crossing Tunnel has been developed. As a result from a fire suppression and tunnel ventilation system, the project d

    Jan 1, 2016

  • ISEE
    Strain-based Instrumentation for Marine Terminal Rock Blasting

    By Cathy Aimone-Martin, Brent Meins

    A comprehensive instrumentation program was implemented at the Howland Hook Marine Terminal on Staten Island, NY during proximate underwater rock blasting in 2014. Forty-two blasts took place over a 4

    Jan 1, 2016

  • ISEE
    Tunnel Excavation on the Abutment of an Existing Dam

    To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint

    Jan 1, 2016

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • CIM
    Iron Hydrolysis in the Direct Nickel Process

    By F. McCarthy, R. McDonald, G. Woodbridge, G. Brock, D. Robinson

    "The Direct Nickel process is a hydrometallurgical technology being developed to treat nickel laterite ores by leaching at atmospheric pressure. The leaching process uses nitric acid in a relatively l

    Jan 1, 2016

  • CIM
    Design of SO2/O2 Cyanide Destruction Circuits: The Critical Factors and Challenges

    By N. Katsikaros, N. S. ‘ Yap, B. Adaszynski

    "Cyanide is a well proven, effective lixiviant that has been utilised for centuries in gold extraction processes. Despite being used in close to 90% of gold processing plants, cyanide leaching is stil

    Jan 1, 2016

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • ISEE
    Using Photogrammetry Data from Unmanned Aerial Vehicle (UAV), Small Unmanned Aircraft Systems (sUAS) for Blast Design

    By Luis Valentim, John E. Wiegand

    Highwall or face profiling has long been used to facilitate the design and placement of front row blastholes to ensure optimum burdens. Traditionally, a large number of laser measurement points obtain

    Jan 1, 2016

  • SME
    Measurement of Grout Injection Pressure in Situ

    By Elisabeth Tønnesen, Lloyd Tunbridge

    "SUMMARY Injection grouting in rock around tunnels is used to reduce or stop water inflow. Little is known about the distribution of pressure within the rock mass during and after grouting. Instrument

    Jan 1, 2016

  • ISEE
    A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When Decking

    By Neal Lee, Braden T. Lusk, Brendan McCray

    Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp

    Jan 1, 2016

  • SME
    Non-destructive Approach for Shotcrete Lining Strength Monitoring

    By Vishwajeet Ahuja, Benoit Jones

    "INTRODUCTION Shotcrete lining forms an integral part of conventional tunneling and is widely applied for underground excavations. Early strength gain of the shotcrete is a crucial aspect for ground s

    Jan 1, 2016

  • CIM
    Balancing and Estimating the Ore Mineral Contents from Daily Production Samples

    By Maryam Sadeghi, Jonathan Roy, Claude Bazin

    "The operation of mineral processing equipments is intimately related to the mineral composition of the ore. However unit performances are usually characterized in terms of metal contents or recoverie

    Jan 1, 2016

  • CIM
    Comminution Energy Efficiency – Understanding the Next Steps

    By Brandt Porter, Lawrence K. Nordell, Alexander Potapor

    "Improving comminution efficiencies with better machine geometries and motions, improved nip angles, rock movement control, and voids regulation among rocks are some of the next steps to better machin

    Jan 1, 2016