Search Documents

Sort by

  • CIM
    Nickel Rim South -Xstrata?s First New Mine in Sudbury in 20 Years

    By Rick Collins

    Presentation Agenda 1.Sudbury Basin 2.Diamond Drilling 3.Planned Production 4.Safety 5.Timeline 6.Sustainable Development 7.Scope Elements 8.Progress 9.Delivery Approach 10.Owners and EPCM

    May 1, 2009

  • AUSIMM
    Flotation of Fine Coal from Bulli, Greta and Victoria Tunnel Seams

    Factors of importance in the ntilization of coal fines are mentioned, and the results of flotation tests on coal fines from three important coal seams in New South Wales are presented.INTRODUCTIONEcon

    Jan 1, 1961

  • CIM
    Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and Design

    By Fidelis T. Suorineni

    Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories

    May 1, 2011

  • SME
    Geologists Add Value at Newmont’s Nevada Mines – Part Two

    By Wayne Trudel, Eric Saderhold, Lloyd McEvers, Lori Clarke, Charles Lynn Bolin, Leroy Schutz

    Editor’s note: This is the second part of a two-part series on how mine geologists added about 141t (4.53 million oz) at Newmont Mining’s gold operations in Nevada during 2003. Part one (ME, July2004

    Jan 1, 2004

  • AUSIMM
    Column Flotation of Iron Ore - Status and Advances

    By H Thanasekaran, L Christodoulou, J Kohmuench

    "Column flotation has been successfully applied to iron ore concentration since the 1980s with the goal of reducing silica content and allowing for the efficient production of pellet feed. Since then,

    Aug 12, 2013

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • SAIMM
    Investigating continuous time open pit dynamics - Synopsis

    Current mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos

    Jan 1, 2008

  • SAIMM
    Sulphuric Acid Technology Utilised By Bateman Engineering (c5b3297b-2b92-4481-b163-175e821e0954)

    By W. Vorster

    Bateman Engineering Project's acid-plant track record goes back to 1977. Bateman Engineering can design sulphuric plants based on gas from sulphur burners, metallurgical off gas as well as pyrite

    Jan 1, 2009

  • SAIMM
    Sulphuric Acid Technology Utilised By Bateman Engineering

    By W. Vorster

    Bateman Engineering Project's acid-plant track record goes back to 1977. Bateman Engineering can design sulphuric plants based on gas from sulphur burners, metallurgical off gas as well as pyrite

    Jan 1, 2009

  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • SAIMM
    An investigation of mechanisms involved in backfill-rock mass behaviour in narrow vein mining - Synopsis

    By F. P. Hassani

    Today, mine backfilling has become an integral part of mining operations, both from a local and overall ground control point of view, and as regards mining techniques and environmental considerations.

    Jan 1, 2008

  • AIME
  • DFI
    Diaphragm Walls, Recent Developments to Improve Reliability

    By A. Frits van Tol, Rodriaan Spruit, Jan H. van Dalen

    "Abstract In recent years, there have been major problems with deep excavations in urban areas supported by diaphragm walls. In some cases, like the fatal Nicoll Highway collapse in Singapore the qual

    Jan 1, 2014

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Continuous loading and conveying technology in mining

    By Dale Lens, W. S. (Wayne) Cusitar

    "The use of continuous loading and conveying technology for mining is currently practiced in relatively few mining environments and, even in these cases, on a non-exclusive basis. For the most part, a

    Jan 1, 1987

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • CIM
    Applications of fracture mechanics in failure analysis case studies

    By M. N. Bassim, W. W. Tennese

    "Concepts of linear elastic fracture mechanics were applied to study two cases of failure, namely an equalizing beam from a tandem rear axle of a highway tractor unit and the main beam of a flat bed t

    Jan 1, 1985

  • SAIMM
    Dealing with high-grade data in resource estimation

    By O. Leuangthong, M. Nowak

    "The impact of high-grade data on resource estimation has been a longstanding topic of interest in the mining industry. Concerns related to possible over-estimation of resources in such cases have led

    Jan 1, 2015

  • AIME
  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004