Search Documents

Sort by

  • NIOSH
    IC 9191 Behavioral Accident Simulator Computer Program User Guide And Technical Reference Manual

    By William E. Souder

    The behavioral accident simulator (BAS) is a computer program that can be used to simulate accident situations. It demonstrates how the potential to have an accident grows or diminishes as a result of

    Jan 1, 1988

  • ABM
    Instabilidade Plástica Em Cilindro De Paredes Finas Sujeito À Pressão Interna – Estudo De Caso

    By Anselmo Monteiro Ilkiu

    No presente trabalho será apresentado um modelo matemático para a análise da instabilidade plástica de um cilindro de parede fina sujeita a pressão interna, considerando o material com anisotropia nor

    Aug 16, 2017

  • ISEE
    An Analytical Approach For Diagnosing and Solving Blasting Complaints

    By Douglas Rudenko

    Have you ever had a neighbor complain about a blast one day, but says the next day’s blast was better, even though the Peak Particle Velocity (PPV) increased? How about neighbors that complain about a

    Jan 1, 2000

  • NIOSH
    RI 7399 Prediction Of Coke Strength And Carbonization Product Yields From Exploration Data

    By Manuel Gomez

    This report presents prediction equations for 12 variables that are indicative of metallurgical coal quality. The variables include six for coke strength and six for carbonization product yields. All

    Jan 1, 1970

  • ISEE
    Function Analysis of Stemming Devices

    By Carl Lubbe, Ron Frye

    Numerous articles have been written regarding the effects of blast control plugs in an attempt to quantify stemming ejection rates, air overpressures, fragmentation’and other parameters measured using

    Jan 1, 1998

  • ISEE
    Discovery, Analysis, and Elimination of Instantaneous Misfires in Underground Production Blasts

    By Norman Disley, David B. Counter, Lionel Hebert

    Misfires in underground and surface production blasts can be costly. Costs can arise from loss of resource, production interruptions, having to redrill or otherwise refire the blast (a hazardous proce

    Jan 1, 1996

  • NIOSH
    RI 9458 - Behavior of Simulated Longwall Gob Material

    By Reno M. Pappas, Christopher Mark

    This report presents results of a U.S. Bureau of Mines study of longwall gob material. The objective of this work was to determine material stiffness properties of the gob for use in numerical models

    Jan 1, 1993

  • CIM
    An Experimental Study on Fine Coal Desulfurization y Centrifugal Gravity Separation in a Dense Medium

    By Youjun Tao

    Falcon centrifugal gravity separation tests were conducted to study desulfurization and de-ashing performance with different size fractions of a high-sulfur Chinese -0.5mm fine coal in a dense medium.

    Aug 1, 2013

  • NIOSH
    RI 9454 - Vibration Testing of Off-Road Vehicle Seats

    By John C. Gagliardi, Walter K. Utt

    The U.S. Bureau of Mines, in cooperation with Carter Mining Co., conducted vibration tests of four off-road vehicle seats. The purpose of the tests was to determine which seat provided the best vibrat

    Jan 1, 1993

  • NIOSH
    RI 9432 - Rock Mechanics Investigations at the Lucky Friday Mine (In Three Parts)

    By M. E. Poad, J. K. Whyatt, T. J. Williams

    Researchers at the U.S. Bureau of Mimes monitored rock mass response to mining of an experimental underhand longwall stope in Hecla Mining Co.'s Lucky Friday Mine, Mullan, ID. This stope design,

    Jan 1, 1992

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • SAIMM
    New President of FSPE

    Mr Colin M. Spence took office as President of The Federation of Societies of Professional Engineers on 1st July, 1984. Colin Maynard Spence was born in November 1921, and was educated at the Durban P

    Jan 1, 1984

  • NIOSH
    Mine Shaft Conveyance Monitoring

    By T. M. Ruff, W. G. McCoy, M. J. Beus, S. Iverson, W. Hasz

    Technology to enhance safety during mine hoisting has been developed by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health. Assessment of curre

  • SME
    Automatic Control of a High Tension Roll Separator

    By F. E. du Plessis, P. De Waal

    Through the development of innovative in-line mineral quantification sensors, the possibility has arisen to apply modern control theory to implement automatic process control for electrostatic high te

    Jan 1, 2005

  • CIM
    Magnetoflotation in Nickel Ore Processing

    By Peter Wells, Adrian Sabau, Turgut Yalcin

    "The nickel ores of Sudbury contain substantial amounts of the gangue mineral pyrrhotite (Fe7S&) which causes certain diflculties in the milling of these ores. This paper proposes a process called “ma

    Jan 1, 1999

  • SAIMM
    Strategic Mine Planning And Mineral Resource Management At Anglo Platinum - Synopsis

    This paper describes the integration of the mineral resource management philosophy within strategic long term planning at Anglo Platinum Limited. Consideration is given to the philosophy, processes, t

    Jan 1, 2007

  • ISEE
    The SMI, New Easy-To-Use Electronic Initiation System

    By Peter Duniam, Stephen John Brace

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation and Explosives Applications Orlando,Florida,USA July24-27,200O. Objectives:- After completing this session 1. Explain safety issues 2. Do si

    Jan 1, 2000

  • NIOSH
    OFR-123(6)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume VI Application Of PSU/MVS To The Analysis Of Modifications To Existing Ventilation Systems

    By G. W. Luxbacher

    This volume describes the use of the Penn State Mine Ventilation Simulator (PSU/MVS) to model existing mine ventilation systems and, in addition, to evaluate the effect of system modifications. Ventil

    Jan 1, 1977

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • CIM
    Erection and Commissioning Issues for Large Grinding Mill Circuits

    By Randolph R. Dreher, Michael L. Schreder

    "In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin

    Jan 1, 2001