Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Endowment Funds (8f05a178-48da-450d-a3d9-58f96c47e0ab)
The regular activities of the Institute are financed mainly by income derived from members' dues, from advertising in MINING AND METALLURGY, and from the sale of publications to the public. In ad
Jan 1, 1941
-
Application Of Modern Technology In Today’s Limestone Quarry Operation
By B. Moore, Y. J. Zhang
In today’s competitive dimensional stone business environment, use of available technology is critical to achieve and maintain a competitive advantage. Awareness of improvements in diamond cutting tec
Jan 1, 2004
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
By Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Characterization of the Flexural Properties of Polyester Matrix Composites Reinforced with Continuous Jute Fibers
By Sergio N. Monteiro
Jute fiber reinforced polymer composites are among the most investigated and applied natural composites. In this past decade the mechanical properties of these composites has been assessed for various
Jan 1, 2010
-
Simulation Of Time-Dependent Crush Pillar Behaviour In Tabular Platinum Mines ? Synopsis
By J. A. L. Napier
It has been established that significant time-dependent stope convergence may occur over time periods of hours and days in certain hard-rock gold and platinum mines. The source of this time-dependent
Jan 1, 2012
-
Physical and numerical modelling of a four-strand steelmaking tundish using flow analysis of different configurations (0c3edd99-7ca7-481d-91c3-d7b7b8a277a8)
By J. H. Cloete, S. M. Bradshaw, D. K. Chibwe
"Modern tundishes have evolved as vessels to serve as the final step in refining of molten steel by removing inclusions and promoting thermochemical homogeneity.In this study the flow behaviour in a f
Jan 1, 2015
-
The Petrology and Paleoenvironmental Setting of Coal at Waitewhena Coalfield û Relationships Between Paleoenvironment, Coal Type and Analytical Data
Lower Miocene Maryville Coal Measures at Waitewhena Coalfield, in the Taranaki coal region, include seams of sub-bituminous coal up to 4 m thick. During coalfield exploration Fletcher Challenge Ltd dr
Jan 1, 1987
-
Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)
"As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.
Jan 1, 2017
-
Simplified Hyperspectral Imaging for Improved Geologic Mapping of Mine Slopes
By Edward L. McHugh, Louis J. Denes, Jami M. Girard
A prototype portable hyperspectral imager that operates in the visible and near-infrared ranges of the electromagnetic spectrum was field tested at an open-pit mine. The tests were sponsored by the
-
Peruvian Mining Convention Focuses on Sustainable Development
By William R. Yernberg
The 26th Peruvian Mining Convention (Convención de Ingeneieros de Minas del Perú) was held Sept. 15 through 19, 2003, in Arequipa. The convention was sponsored by the Peruvian Institute of Mining Engi
Jan 1, 2004
-
The Evaluation Of Whole-Body Vibration In A South African Opencast Mine - Synopsis
By S. A. Aye
Vibration levels on a variety of equipment in a South African opencast mine were measured in this study. The well-established ISO 2631-1 (1997) standard methodology was used for the computation of wei
Jan 1, 2011
-
RI 3206 Washability Studies of Coal from the Mary Lee Bed at the Bankhead Mine, Bankhead, Ala.
By B. W. Gandrud, A. C. Richardson
"INTRODUCTION The Bankhead mine of the Cane Creek Coal Mining Co. is in the central part of Walker County, Ala., 4 miles south of Jasper. The Mary Lee bed in this part of the State yields a practicall
May 1, 1933
-
Selection of rock depressants based on laboratory kinetic studies
By Gordon E. Agar, Brian Lyons, Gregory H. Styles, William B. Kipkie
"Rock rejection during the flotation of a copper-nickel ore was improved by adding carboxymethyl cellulose to both a rougher and cleaner flotation stage. The selection of the rock depressant was based
Jan 1, 1987
-
Improvements to Blasting Practices at Ok Tedi
By Beevers J
The Ok Tedi Project is now a high production open-pit porphyry copper mine located in the Star Mountains of Papua New Guinea (PNG). At present, total daily production is 190 000t of ore and waste.
Jan 1, 1991
-
Residence time distributions modelling for mineral processes evaluation
By C. Bazin, D. Hodouin
"A flexible model involving perfect mixers, stagnant zones, plug flow, material bypassing and recycling zones has been developed for interpreting mixing phenomena in mineral processes. The mixing prop
Jan 1, 1988
-
RI 3347 The Importance Of Adequate Voltage For Distribution Systems In Coal Mines ? Introduction (69763951-5b49-4156-8d0c-4d7aaa93925d)
By E. J. Gleim
The importance of "good voltage,? especially for direct-current systems in coal mines, is not always fully appreciated. From the practical 4 aspect there are three viewpoints from which low voltage ma
Jan 1, 1937
-
Lineament Analysis: Identification Of Structural Controls On Ground Instability In Surface And Underground Mines (b5ba2cd3-4de8-4cb0-9e01-83ff5030f620)
By S. E. Phillipson, P. L. Tyrna
Lineament analysis, a remote sensing application for geological structures, has been criticized for reliance on subjective interpretations. The Mine Safety & Health Administration’s Roof Control Divi
Jan 1, 2002
-
Manufacture of Wire Bars from Secondary Copper
By W. A. Scheuch
ORDINARILY secondary copper, unless electrolytically refined, is reclaimed directly as foundry ingots used in the manufacture of copper-rich alloy castings. This use does not require the elimination o
Jan 1, 1929
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project
By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Wind Erosion Of Tailings Dams And Mitigation Of The Dust Nuisance
By G. E. Blight
Wind erosion can be a major cause of the loss and dispersion of tailings material from a tailings dam into its surrounding environment. Such dust dispersion can be a serious nuisance, as well as a hea
Jan 1, 2007