  • CIM
    Application of Non-Intrusive Sonar Array-Based Technology to Solve Unique and Difficult Measurement Situations

    By Joseph Poplawski, Christian O’Keefe, Robert Maron

    "Unique and difficult minerals processing measurement situations will be described and the application of passive array-based technology for performing these measurements will be illustrated. Examples

    Jan 1, 2008

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • SAIMM
    Hot Work Modelling Of Two Equivalent Low Carbon Strip Steels Produced, Respectively, By The Cold Charge Route And By The Hot Charge Route

    By W. Stumpf

    Mean flow stress analyses from plant mill logs for the conventionally produced hot rolled low carbon steel from the Ispat Iscor Vanderbijlpark strip producing plant, indicated a higher temperature sen

    Jan 1, 2004

  • SME-ICGCM
    Rib Support Innovation At Daw Mill Colliery (a22a0861-1502-4d3d-a2cd-8a6ba0c13271)

    By Jon Bowler

    Daw Mill Colliery, UK Coal, near Coventry in England, mines the Warwickshire Thick Seam at 800 m/2500 ft depth using longwall retreat with gateroads supported by rockbolts. Over the last eight years

    Jan 1, 2009

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • CIM
    Anaconda Mining Inc.’s Point Rousse Project Cyanide Destruction System Development Study

    By Neri Roux, Chris Budgell, Allan Cramm, Leo Cheung

    "Anaconda Mining Inc. is investigating potential improvements and expansions to their operating plant located on the Baie Verte Peninsula in Newfoundland. An extensive batch and continuous bench scale

    Jan 1, 2017

  • AUSIMM
    Application of Lithostratigraphic and Chronostratigraphic Analysis to Seam Modelling in the Rapahoe Sector, western Greymouth Coalfield

    Seam correlation in the central Rapahoe Sector (Greymouth Coalfield) can be enhanced by detailed lithostratigraphy and chronostratigraphy. Rewanui Coal Measures are overlain comformably by lacustrine,

    Jan 1, 1996

  • SME
    Investigation of Climatic Conditions in Underground Coal Mining Mining, Metallurgy and Exploration (63acde09-eb8c-4eb1-b788-340f56a030a7)

    By İbrahim Çınar, Hakan Özşen

    Mine workers in heavy and dangerous work are under several physical risk factors, for example temperature, humidity, noise, vibration, lighting and air velocity. Thermal comfort includes parameters su

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SAIMM
    An algorithm for quantifying regionalized ore grades - Synopsis

    We present a novel hybrid algorithm for quantifying the ore grade variability that has central importance in ore reserve estimation. The proposed algorithm has three stages: (1) fuzzy clustering, (2)

    Jan 1, 2008

  • CIM
    The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism Performance

    By Richard Peaker, Jens Lichter, Alexander V. Potapov

    "The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a

    Jan 1, 2007

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • IOM3
    Basic aspects of nickel extraction from chromitiferous overburden

    By B. R. Reddy, Y. V. Swamy, B. V. R. Murthy, H. S. Ray

    The Ni oxide was reduced with a CO-CO2-N2 gas mixture and the effects were observed of process variables such as roasting temperature, time and CO partial pressure. Extraction of over 90% of Ni was ac

    Dec 1, 1995

  • SME
    A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SD

    By V. L. Franzen, Z. J. Hladysz, C. A. Kliche

    The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin

    Jan 1, 2000

  • SAIMM
    Controlled chloride cracking of austenitic stainless steel tube samples - Synopsis

    By M. S. Raseroka

    An experimental rig has been constructed to produce chloride stress corrosion cracks in Type 304L stainless steel tube samples. The samples are to be used to test possible in situ repair methods in fu

    Jan 1, 2009

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005

  • SAIMM
    Beneficiation of Marble From Griekwastad, Northern Cape Province

    By N. P. Mahumapelo

    This paper is based on a study to determine the potential beneficiation opportunities for marble from Griekwastad in the Northern Cape Province. The marble was characterized mineralogically by X-ray

    Jan 1, 2014

  • CIM
    Development and Testing of a More Effective Froth Handling Pump

    By R. J. Visintainer, W. L. Whitlock

    "Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre

    Jan 1, 2012

  • AUSIMM
    Study of a Two-Stage Smelting Reduction Process for Ironmaking by a Thermochemical Model

    A thermochemical model is developed to study the two-stage smelting reduction process for ironmaking without post-combustion. Steady-state multi-material and heat balance equations are solved simult

    Jan 1, 1999