Search Documents

Sort by

  • AUSIMM
    Underground bulk sampling, uniform conditioning and conditional simulation – unrealistic expectations?

    By I Clark, S C. Dominy

    Bulk sampling programs are typically applied in coarse gold mineralised systems to verify resource/reserve grades. In recent years, there have been controversies surrounding some results of undergroun

    May 9, 2017

  • AIME
  • DFI
    The Heritage of Swedish Foundation Engineering

    By Stefan Aronsson, K. Rainer Massarsch

    "ABSTRACT The geology of Sweden is characterized by the most recent glacial period with deposition of very soft clays and loose sand. Due to these difficult geotechnical conditions, new, innovative fo

    Jan 1, 2014

  • AUSIMM
    Angas Zinc Mine - Start-Up and the First Twelve Months of Operation in the Adelaide Hills

    Terramin Australia LimitedÆs Angas Lead and Zinc Mine operates in the unique and picturesque environment of Adelaide Hills, 60 km South East of the Adelaide city centre itself. The mine was granted ap

    Jan 1, 2009

  • SAIMM
    Project control - an overview

    By E. R. Davis, R. J. Knott

    The paper discusses some of the tools of management in the field of project control, especially in engineering. Project control includes planning and cost engineering, and involves various phases: the

    Jan 1, 1982

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • SAIMM
    Origins Of Some Fractures Around Tabular Stopes In Deep South African Mines ? Synopsis

    By G. van Aswegen

    The geometry and morphology of a set of low-angle fractures around a stope in a deep Witwatersrand gold mine are explained in terms of extension fractures forming under variable conditions of stress.

    Jan 1, 2012

  • AUSIMM
    Core Recovery Devices Used In South Australian Drilling Practice

    Recent developments in diamond drilling practice have been chiefly 'concerned with modifications in drill design and 'operating technique whereby an increase in daily footage rates and reduc

    Jan 1, 1943

  • NIOSH
    IC 9025 Tungsten Availability - Market Economy Countries - A Minerals Availability Program Appraisal

    By T. F. Anstett

    The Bureau of Mines estimated the potential availability of tungsten from 57 mines and deposits in 19 market economy countries. The tungsten resources of China and the U.S.S.R. were also estimated. Th

    Jan 1, 1985

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • SME
    SIU-Sim: A Novel Coal Preparation Plant Simulator

    Coal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S

    Jan 1, 2008

  • AUSIMM
    Remediation of Mine Seepage at Batu Hijau

    Remediation of Mine Seepage at Batu Hijau

    Sep 13, 2010

  • AUSIMM
    Bulk Shipping of Industrial Minerals

    By French D

    In presenting this paper may I preface my remarks by recognizing the presence here to-day of the many delegates from the overseas mining communities throughout the world. That is to say - those del

    Jan 1, 1989

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • ISEE
    Pre-Blast Surveys; a Public Relations and Claim Reduction Tool (b114a2f5-7740-4145-afd2-f7ffc2af0fcd)

    By David Harrison, Edward J. Walter, Meitra Ferek

    Agreat tool in the prevention of blasting complaints and subsequent damage claims. In today’s highly competitive industry, we are always looking for ways to become more cost effective. This article in

    Jan 1, 1995

  • SME
    Development of buffer station for safe and eco-friendly mining of seabed mineral resources

    By Tae-kyeong Yeu, Jong-Choi, Cheon-Hong Min, Hyung-woo Kim, Jae- Won Oh, Sup Hong, Minuk Lee, Sung-Soon Kim, Chang-Ho Lee, Ki-Young Seong

    "Collecting mineral resources from the seabed using a seafloor crawling robot is the firststep in the mining operation. The second-step is lifting the collected ore up to the water surface. For liftin

    Sep 1, 2014

  • AIME
    Logging and Log Interpretation - The Borehole Televiewer – A New Logging Concept for Fracture Location and Other Types of Borehole Inspection

    By R. L. Caldwell, E. E. Glenn, L. J. Norton, A. J. D. Straus, S. V. Holcomb, J. Zemanek

    A new and unique logging tool, called the Borehole Televiewer (BHTV), has been developed to inspect boreholes and to evaluate formations. Even though geologists and engineers have had only about 3 yea

    Jan 1, 1970

  • SME
    Gold and Silver Assay Methods in the Mining and Metallurgy Industry

    By L. C. Stone, J. C. Parr, T. N. Anderson, D. Metcalf

    An increase in the importance of low-grade materials as sources of gold and silver has led to the need for improved analytical methods on leach solutions, ores and various effluents, residues, and in-

    Jan 1, 1981

  • SME
    The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months

    By Refik Elibay, Lawrence A. Williamson, George D. Barnes

    Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc

    Jan 1, 2005

  • AUSIMM
    Recent Secondary Extraction Experience at Cook Colliery in a Multi-Seam Environment

    Cook Colliery currently mines in the Argo Seam, beneath old workings in an overlying seam. The Argo seam is up to 4.8 m thick and a continuous haulage system behind an ABM25 is used to develop first w

    Nov 25, 2010