Search Documents

Sort by

  • DFI
    Pile Load Test Results Using The New Statnamic Method

    By Matthew Janes

    Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa

    Jan 1, 1990

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • CIM
    Economical Benefits of Autogenous Grinding

    By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho

    "This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade

    Jan 1, 2000

  • CIM
    Research, Innovation & Reality

    By Richard Burt

    "In seeking to supply the ever increasing needs for raw materials, the mining industry has been required to develop lower grade resources in increasingly remote regions of the world. This has resulted

    Jan 1, 1999

  • CIM
    Gold-copper ores processing / flotation process optimization by the development of an on-line expert system

    By Yves Breau, François Robichaud, Jacques McMullen, Pierre Pelletie

    "The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • SME
    Coal 1986 - Underground mining

    Continued market pressure on the US coal industry was the overriding factor affecting developments in underground mining in 1986. An oversupply of coal in the spot market kept prices low throughout th

    Jan 5, 1987

  • SME
    Reducing Emissions Of Air Toxics: Evaluating The Potential For Removing Trace Elements From Powder River Basin Sub-bituminous Coals

    By Jr. Raleigh

    As part vi the development of the Coal Quality Expert (CQRN) --a computer program capable of predicting the impacts of coal quality on power plant performance, costs, and emissions control--several na

    Jan 1, 1993

  • SAIMM
    Modelling of solvent extraction processes: Case of cobalt recovery from acidic chloride media, A. Chagnes

    By A. Chagnes

    This paper presents a modelling tool that can be used to predict the behaviour of solvent extraction processes. In particular, this model allows calculating metal extraction efficiency as a function o

    Jan 1, 2020

  • SAIMM
    Roll-to-roll coating methods for the manufacture of polymer electrolyte membrane fuel cell membrane electrode assemblies

    By O. Barron, C. Felix

    In 2023, polymer electrolyte membrane fuel cell membrane electrode assemblies accounted for about 62% of the global fuel cell market share and this demand is expected to grow. Commercialisation requir

    May 27, 2025

  • CIM
    Narrow-vein Mining Experiences at the Ashanti Mine: A Case Study

    By Fidelis T. Suorineni

    The Ashanti mine, located in Obusai, Ghana, West Africa, has been in production for over 100 years, and is currently the second largest single gold producer in Africa. The mine covers a concession are

    Oct 1, 2001

  • SME
    Abstract Page - Fundamental Approaches in Longwall Dust Control

    By R. A. Jankowsi, S. K. Ruggieri

    Airborne respirable dust levels on longwalls can be reduced if operators approach the dust control problem in a logical and fundamental manner. This can be accomplished through the proper application

    Jan 6, 1985

  • AIME
    Trend of Bond and Stock Markets (7b822907-7826-4673-a484-cac94d3aa6c1)

    For the benefit of those of our members who are considerable holders of securities,but owing to their isolated situations are not in close touch with the metropolitan market and current quotations, we

    Jan 11, 1919

  • SME
    Movement of Diesel Powered Vehicles as a Factor Influencing Environmental Health Standards in Mine Dead-End Headings

    Diesel powered machines are doing some specific operations in the cyclic order required by the technical process. The dynamics of this process in certain conditions has an essential influence on envir

    Jan 6, 1985

  • AUSIMM
    Activity Coefficient of Cobalt Oxide in Non-Ferrous Smelting Slags - A Review

    By S Jahanshahi, D R. Swinbourne

    A knowledge of the value of the activity coefficient of cobalt oxide in slag as a function of composition and temperature is necessary if effective strategies are to be devised to maximise the recover

    Jan 1, 1998

  • SAIMM
    The integration of mine simulation and ventilation simulation to develop a ‘Life-Cycle’ mine ventilation system

    By S. G. Hardcastle, C. K. Kocsis

    In Canada’s metal mines, ventilation, which requires electricity to operate the fans and fossil fuel for heating, accounts for a significant portion of the overall mine’s underground power consumption

    Jan 1, 2003

  • SME
    Face Stabilisation in Closed Shield Tunnelling

    By K. Kovári, G. Anagnostou

    Slurry and EPB-shield tunnelling have been successfully applied worldwide in recent years. Under extremely unfavourable geological conditions, however, face instabilities may occur. The present paper

    Jan 1, 1997

  • NIOSH
    RI 6164 Design And Development Of Precast Concrete Mine Supports: A Progress Report ? Summary

    By G. T. Krempasky

    In an attempt to develop a suitable precast concrete support for underground use, two different models (1955 and 1958) of a five-piece concrete set were designed, fabricated, and tested under adverse

    Jan 1, 1963

  • ISEE
    Drilling Efficiency and the Associated Benefits to the Mining Process

    By Lee B. Paterson

    Mining Engineers throughout the world have an appreciation for the importance of the role of the Blasthole Drill in one of the primary elements of the mining process. This paper highlights areas that

    Jan 1, 2000

  • SME
    Discussion - Treatment methods for difficult-to-float copper porphyry ores

    By S. G. Malghan

    W.H. Moyer In reference to the section “Excess pyrite, ” the author discusses difficulties in separating chalcopyrite from pyrite. A technique does exist, and has been used commercially, for the f

    Jan 11, 1986