Search Documents

Sort by

  • SME
    APCOM 23 – Computer Simulation, Automation, Optimization and Debate For the Minerals Industry

    By Kerry Spickelmier

    Editor's note: information for this feature was taken from the published APCOM proceedings. Computer trends, with special focus on the reasons for computer use, grabbed the lion's share o

    Jan 1, 1992

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991

  • RMCMI
    Producing Liquid Fuels from Coal

    By James T. Bartis

    Review of Key Issues Affecting the Prospects of CTL in the United States ?Issues of concern to the public - Impacts of coal mining - Water use - Greenhouse gas emissions ?Issues of concern t

    Jan 1, 2009

  • AUSIMM
    The Exploitation of Titanium and Zirconium in Australia

    The metals titanium and zirconium and their alloys occupy individually unique positions in the catalogue of metallic materials available for engineering applications. Because of the uniqueness of t

    Jan 1, 1969

  • AUSIMM
    Telfer Commences Underground Mining - A Case Study

    Newmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main

    Jan 1, 1991

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • IIMP
    La supervisión minera en el Perú y otros países

    By Alfredo Dammert Lira

    El presente trabajo señala la función de OSINERGMIN en el ámbito de la supervisión de las Normas de Seguridad y Salud Ocupacional de la actividad minera, así como revisa los procesos de supervisión mi

    Sep 12, 2011

  • AIME
    1978 Annual Review: Industrial Minerals Remain Strong Despite Setbacks

    Industrial minerals enjoyed a fairly successful year in 1978, despite the sluggish economy, inflation, and environmental restrictions. A glance at US Bureau of Mines statistics shows that, in gene

    Jan 5, 1979

  • CIM
    Red Lake Mine Seismic System - World Mining Congress August 2013 Montreal, Canada

    Outline ?Red Lake Gold Mines ?Red Lake Seismic System ?Applications of Seismic System at Red Lake Mine ?Seismic System Analysis and Customization ?Seismic Software ?Array Design ?Calibra

    Aug 1, 2013

  • CIM
    Factors influencing the selection of mine hoist electrical drives

    By B. C. Legg, G. L. Tiley

    "Many of the ore bodies presently being developed are in remote locations and are, or will be, served by electrical power supply systems of limited capacity.The largest single components of the electr

    Jan 1, 1993

  • AUSIMM
    The Sepon Copper Deposits (Laos) and Their Relation to Carlin-like Gold Mineralisation

    By B Davis, M Wallace, J Stewart, C F Burrett, J B. Cannell

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Sepon district in Lao PDR contains 1.8 Mt of JORC (2012) compliant contained Cu resourc

    Mar 18, 2015

  • AUSIMM
    Grade Trends at the Elura Mine

    The Elura Orebody consists of a number of parallel, vertically oriented pipe-like structures of pyrite-sphalerite-galena mineralization located at the core of a structural dome. Concentric zoning of t

    Jan 1, 1990

  • CIM
    Connecting Mines and Communities: An Overview of the Elk Valley in S.E. British Columbia

    Delivering Our Products On any given day in North America, 80 kilometers of rail cars are engaged in moving our product. Global Customer Base Our business accounts for more than 30% of all bulk

    May 1, 2006

  • DFI
    Complex Deep Foundation System for Tall Tower in New York City

    By Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f

    Jan 1, 2017

  • AUSIMM
    Gold mineralisation on Woodlark Island, Papua New Guinea

    By Shatwell DO, Hayward SB, Leach TM

    Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila

    Jan 1, 1994

  • AUSIMM
    Petrology of the Broken Hill Lode and its Bearing on Ore Genesis

    LIST OF CONTENTSAbstractIntroductionSelected Sections of the Broken Hill LodeLocality PlansPetrology1. Zinc Corporation Mine: DDH. 5.98, section 30, No. 26 level2. Zinc Corporation Mine: DDH. 838, sec

    Jan 1, 1959

  • AUSIMM
    Cemented Fill Practice and Research at Mount Isa

    This paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and s

    Jan 1, 1980

  • TMS
    Risks And Opportunities In Continuous Converting For Nickel At Inco

    By J. R. Donald

    For processing copper, continuous converting has been successfully employed in a variety of locations, but for nickel, there has yet to be a successful commercial implementation of continuous converti

    Jan 1, 2005

  • SME
    Real Options: A Tool For Managing Technical Risk In A Mine Plan

    By J. A. Botín

    NPV is a static measure of project value which does not discriminate between levels of internal and external risk in project valuation. Due to current investment project?s characteristics, a much more

    Jan 1, 2012