Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Behaviour of Cobalt During Nickel Smelting Converting
This paper outlines the thermodynamic and mass balance principles which affect the distribution of cobalt between matte and slag during the pyrometallurgical treatment of nickel - copper sulphides
Jan 1, 1992
-
A Critical Review of an in Situ Stress Monitoring Program
By Boyd G. L
Stress measurement is at the core of most stability design analyses. It is demonstrated that contrary to accepted practice, it is the field measurement, and not the calculated prediction, of stress
Jan 1, 1995
-
An International Assessment of Australia as a Location for Project Development
By Whiting AN
Major changes in the world in recent years are changing the criteria for selection of future developments. Oil prices soared during the 1970's while commodity prices including metals and mine
Jan 1, 1983
-
Application of Mobile Primary Crushing and Belt Conveying Systems for Iron Ore Mining
This paper briefly reviews the background of mobile primary crushers and their current main areas of application. The benefits of applying mobile primary crushing and belt conveying systems are analys
Jan 1, 2007
-
Observations on Secondary Copper and Silver Sulphides in the Broken Hill Lode
The present stage of economic development of the Broken Hill lode, attained after 40 years of active exploitation, leaves little opportunity for the study of the zone of secondary sulphides.Little rem
Jan 1, 1927
-
Grouting Technology for Control of Ordovician Limestone Water
By Yinxiang W, Chunlai Y
In older to improve efficiency of surface pre--grouting in sealing off water in heavily water-bearing strata, such as sandstone,siltstone and limestone, several methods have been used in China, they
Jan 1, 1988
-
Structure of the Integrated Mine Control System at Kemi Chrome Mine
By Toivanen R-M, Leinonen O, Pekkarinen H
This paper presents developments in designing an integrated mine control system at Kemi mine. The aim of this paper is to present the general structure of the system and to outline some features of
Jan 1, 1998
-
Origin and Provenance of Submarine Volcaniclastic Rocks in the Late Permian Drake Volcanics, Northeastern New South Wales
The Late Permian intermediate to silicic talc-alkaline Drake Volcanics of New England, N.S.W., consist largely of shallow marine, redeposited volcaniclastic rocks which host epithermal Ag-Au depos
Jan 1, 1987
-
The Geology of the Browns Creek Gold-Copper Skarn Deposit, Blayney, NSW
By Wilkins C
The Browns Creek deposit is located 8 kin west of Blayney and 220 km west of Sydney (Figure 1), at lat 33¦32'S, long 149¦10'E on the Bathurst (SI 55-8) 1:250 000 scale map sheet. The total
Jan 1, 1997
-
Borehole and Surface Geophysical Monitoring, and Simple Modelling of Groundwater Polluted by Waste Leachates
By Barber C, Buselli G
Detailed monitoring of point sources of groundwater pollution is expensive due to the high cost of drilling monitoring boreholes. Whether groundwater pollution is due to mining, industrial or domes
Jan 1, 1988
-
Shaft Sinking at Foster - Kambalda Nickel Operations
Western Mining Corporation began shaft sinking operations at it's Foster orebody, south of Kambalda, on the 20th June, 1984. The top levels of the orebody are currently being mined via a decline
Jan 1, 1985
-
The Need to optimise
MANPOWER RESOURCES The optimisation of human effort has been an ongoing and significant process in the coal industry since industrialisation as we know it began. The extent to which the changes soug
Jan 1, 1991
-
New Tailings Dam at Ardlethan Tin N.L.
In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of
Jan 1, 1978
-
The Nena high sulphidation copper-gold system, Frieda River Complex, Papua New Guinea
By Corbett GJ, Leach TM
The Nena Cu-Au high sulphidation deposit has formed within the Frieda River Intrusive Complex in association with a major dilatant structure. Multiple intermediate intrusives of Miocene age are locali
Jan 1, 1994
-
Preconcentration Of Mill Feeds Using Automated Ore Sorting Process
Ore sorting is a high capacity, low cost method of preconcentrating ores and in some cases of producing a marketable concentrate. In most cases it is applied to run of mine material, immediately af
Jan 1, 1980
-
Changes in the Steel and Ferro Alloy Markets and Their Effect on AustraliaÆs Manganese Industry
By Cullen JF
Australia has a large resource of manganese at BHP's Groote Eylandt mine which has been progressively developed over the last two decades. While much of the product is marketed internationall
Jan 1, 1982
-
Shell-supported Grinding Mill for the Ernest Henry Project
Tumbling mills have been used in the minerals indusu) for occr WO years, with the design changing little, but the size of the individual pieces of equipment increasing significantly with the lowerin
Jan 1, 1997
-
Planning and Cost Criteria for Mining Infrastructure
By Mahony BK
This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans
Jan 1, 1983
-
Recognising False Anomalies in Drillhole EM
By Morland R
In the course of an exploration program aimed at increasing Pasminco Mining's ore reserves, an electromagnetic survey down one of the underground drillholes at the North Mine, Broken Hill, record
Jan 1, 1994
-
Development of Grade Control Systems at the Mt Muro Au-Ag Project, Central Kalimantan, Indonesia
The Mt Muro gold and silver deposit in Central Kalimantan has been in production since December 1994. The geology is characterised by narrow high-grade lodes containing gold and significant amounts of
Jan 1, 1997