Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Applications of Advanced Remote Sensing Systems during a Mine Life
By B P. Banerjee, S Raval
In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr
Jun 28, 2016
-
From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision
By A Maier, M Goldner, C Gimber
Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t
Aug 2, 2023
-
Longwall face floor failure assessment using a semi quantitative risk rating methodology
By S Grimsey, E Janetzki, J Emery
Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob
Nov 29, 2022
-
The development of soil water characteristic curves for soil types classified according to the USCS
By A Satyanaga, H Rahardjo, K G. Mercer
The soil-water characteristic curve (SWCC) is one of the most essential soil properties in unsaturated soil mechanics. The water flow and storage characteristics of an unsaturated soil are closely rel
Jul 23, 2018
-
3D estimation of variables with complexity in cross-correlation structures
By N Madani
Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model
Nov 21, 2018
-
Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective
By C Linklater, A Garvie, D Kentwell
Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the
Jun 28, 2016
-
The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria
The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria The implementation of Larox pressure belt filter, type Larox PF-50 provided within 6˜8% moistur
Sep 13, 2010
-
Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective
By A Kleinitz, J Halilovic, K Trappitt
Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne
Mar 22, 2022
-
Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet
By J Tien, J Huang, N Haque, M O’Brien
Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content
Jun 28, 2016
-
Zircon Trace Elements and Sr-Nd-Pb-Hf Isotope Systematic of the Halasu Porphyry Cu Belt, North-east Xinjiang, China
By C Wu, H Chen
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.The Halasu porphyry copper belt, located in the East Junggar basin bounded by Chinese Altay
Mar 18, 2015
-
Localised Indicator Kriging
By I Douglas, L Allen
Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm
Sep 26, 2011
-
A Comparison of Fluid Origins and Compositions in Iron Oxide-copper-gold and Porphyry-Cu (Mo-Au) Deposits
By B Rusk, L Corriveau, P Emsbo, R P. Xavier
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Porphyry-Cu (Mo-Au) deposits and iron oxide-copper-gold (IOCG) deposits are both characteri
Mar 18, 2015
-
Predicting the Benefit of Gravity Recovery Prior to Flotation
Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit
Aug 1, 2010
-
Quality Control Aspects of Shotcrete in Mining – The Round Determinate Panel Test
By P M. Dight
Shotcrete usage in declines and developments has become pervasive as operators strive to achieve production improvements. Issues of mix control, fibreload, thickness control, temperature and curing co
Mar 21, 2011
-
Structural and Lithological Controls on the Location of Orebodies in the Baizhangzi Lode Gold Deposit in Western Liaoning Province, China
By L Xiong, W J Shi, J H. Wei
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Baizhangzi gold deposit is located in the northern North China Craton. The structural a
Mar 18, 2015
-
Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them
By J Paradis, K Dudgeon, M Topping
At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon
Aug 18, 2014
-
A Paradigm Shift in Underground Raisebore Reamer Removal
By P Viljoen, A Holland, C Parken
In the raisebore industry, there are two known methods of removing large diameter reamer heads once the reaming of an underground shaft is complete: 1. Lower the reamer head to the base of the shaft a
Mar 15, 2021
-
Lifestyle in Fly-in, Fly-Out Operations Versus Residential Operations: A Personal Comparison and Choice
This report will differ slightly from the traditional scientific and technical discussions given at this type of conference. It will focus on the personal experiences and choices that I undertook when
Jan 1, 2005
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project
By M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
The challenges of removing sulfur from magnetite ores to meet direct reduction specifications
By D Connelly
Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial
Sep 18, 2023