Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Assessment of the Explosibility of Gas Mixtures and Monitoring of Sample-Time Trends
Previous methods for the assessment of the explosive potential of gas mixtures have required the plotting of apeexplosibility diagram. These became cumbersome if a large -number of assessments of
Jan 1, 1981
-
Planning, Investigation and Preliminary Design for the Eastern Distributor Tunnels - Sydney
By Chappel R. A, Fishburn B. R
The Eastern Distributor Tunnels - the first major road tunnel project in Australia - are the preferred solution to traffic congestion problems, when compared with alternatives, in this inner urban
Jan 1, 1987
-
Vertical Crater Retreat Mining in the Sudbury Basin
Faced with rising costs and lower metal prices, several Ontario base metal sulphide mines have changed their method of mining to vertical crater retreat mining. This is a bulk mining method that utili
Jan 1, 1989
-
Milling Practice at Emperor Combined Mill
The primary object of this paper is to describe the present metallurgical practice of the Emperor Combined Mill, wherein ores from the adjoining and Associated Mining Companies, Emperor Gold Mining Co
Jan 1, 1953
-
Paper No. 186. The Electrolytic Refining of Auriferous And Argentiferous Copper at Lithgow, in New South Wales.
FOR some reason there is not any extensive literature in print on the electrolytic refining of copper, although the method is in general use in America and Europe. In Australia there are but three pla
Jan 1, 1911
-
Management of Major Aquifer Systems for Productive Mine Development in the Latrobe Valley
By M Pratt
For up to 75 years large scale coal mining has been carried out within the Latrobe Valley region of Victoria. Withdrawal of groundwater from Tertiary aged sediments within the Latrobe Valley is essent
Jan 1, 2003
-
Seismicity at Big Bell Mine
By J Player
Big Bell Mine started experiencing relatively large mining related seismic events, and accompanying rockbursts, from February 1999. Twelve rockbursts damaged access development from February 1999 to J
Jan 1, 2000
-
Gold and Silver Leaching from an Oxidized Gold Ore with Thiourea under Controlled Conditions
By Woodcock JT, La Broody SR
As part of a project on the application of thiourea leaching to a variety of Australian ores, the systematic variation of pH, redox po- tential, and thiourea concentration were in- vestigated on an
Jan 1, 1984
-
Pit Slope Management ù Planning for Your Next Failure in Open Cut Mining
It is often assumed that geotechnical investigations or studies for open pit mines are confined to providing a slope design. However in an operating mine, the design is only one component of a mine ge
Jan 1, 2003
-
Regional Distribution of Silver Deposits on the Pacific Rim
By Smith DM Jr
Silver deposits, in which silver forms at least fifty percent of the value of the ore, are abundant and large on the east side of the Pacific and are absent in the western Pacific. To determine if
Jan 1, 1987
-
Underground Ore Haulage at Mount Lyell
The Prince Lyell Mine has been the major production source at Mount Lyell since under-ground mining commenced in 1972.Three lifts of stopes have been mined to date, with the fourth, the 40 Series lift
Jan 1, 1985
-
Red Dome Stage III Cutback - A Case Study in Brinkmanship
By Paine G. G
The Red Dome Gold/Copper Mine is located approximately 15 km west of the township of Chillagoe which itself is approximately 220 km by road west of Cairns, Far North Queensland. The deposit, with ot
Jan 1, 1994
-
The Care and Maintenance of Winding Ropes and Attachments, as Practised at the South Mine, Broken Hill, N.S.W.
By Howell M. W
The purpose of this paper is to outline the main points in the construction of the various types of wire ropes more commonly used for winding in Australia; and the maintenance of the ropes, and cage a
Jan 1, 1940
-
Coarse Coal Rejects-A Costly Waste or a Valuable Resource?
The current quantity of rejects from coal beneficiation in Australia represents 20 to 25% of raw black coal production. Approximately 80% of the rejects are derived from coarse processing for part
Jan 1, 1987
-
Plant and Process Design Improvements to Increase the Efficiency of Nickel Reduction at QNI
By R Piper
The Yabulu Nickel Refinery commissioned in 1974, processes lateritic ore via a modified Caron process to produce high quality nickel and cobalt products. The Greenvale orebody provided the sole source
Jan 1, 2002
-
Metal Ion Adsorption and Collectorless Flotation of Synthetic Sphalerite
By Quast K. B
The effects of metal ion addition rates and contact time on the activation of synthetic sphalerite using copper, cadmium and silver ions were determined in order to investigate the exchange characte
Jan 1, 1993
-
Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine
Pan Australian Mining lid installed a milling and gold leaching plant designed to process 2 million tonnes per annum of breccia sulphide ore. This plant was commissioned in January 1989. Since commi
Jan 1, 1991
-
Process Requirements for the Direct Condensation of Both Zinc and Lead as Metals in the Polymetallic Smelting of Zn-Pb-Cu Sulphides
By Warner N. A
There is an inherent problem in producing simultaneously lead, zinc and copper as metals in a single polymetallic smelting furnace. It relates to the condensation of lead and zinc from the gas phas
Jan 1, 1989
-
Process Chemistry Studies of the Isasmelt Lead Reduction Process
By Player R. L
Measurements of the rate of PbO reduction from high lead metallurgical slags were made under laboratory conditions using graphite, a CO-50%CO2 gas mixture and metallic iron as reductants. The resul
Jan 1, 1989
-
Surfactant-assisted Filtration of Ignite Slurries
By Readett D. J
Soluble salts can be removed from Bowmans lignite by water and acid leaching. The success of the removal of water soluble or acid exchangeable impurities is directly associated with the efficiency
Jan 1, 1989