    The Rise of the On-Site Geotechnical Engineer

    The current boom in the mining sector has required mining operations to ramp up production to meet the international demand for minerals. This increase in production is putting enormous pressure on on

    Jan 1, 2006

  • AUSIMM
    There is More Exploration than Geology. What Can Be Used Later During the Life of the Project?

    Most Geologists have a well rounded knowledge of the exploration phase and those who have worked as mine geologists have an understanding of the production phase. Few have had exposure to the developm

    Jan 1, 1990

  • AUSIMM
    Studies on the Fouling and Regeneration of C.I.P Carbon

    By Hosking JW, Muir DM, Ruane M, Smith I. Hinchliffe WD

    Maintaining carbon activity is critical to the satisfactory recovery of gold in the Carbon-in-Pulp (C.I.P.) process. Reduced activity can lead to gold losses in tails and lower tonnage throughput.Carb

    Jan 1, 1984

  • AUSIMM
    The Role of the Consulting Engineer in the Design and Construction of Projects for the Minerals Industry

    By Woods PW

    Consulting Engineers have been used in the mining and metallurgical industries for many years. The traditional role of the consultant overseas has been one of assisting with conceptual design right

    Jan 1, 1975

  • AUSIMM
    Blast Furnace and Steel Slags in France

    Record quantities of slag were produced in 1974. Slag usage in this year amounted to 8.5 mega tonnes for granulated blast furnace slag and 7.7 mega tonnes for crushed blast furnace and L.D. slags.

    Jan 1, 1979

  • AUSIMM
    Determination and use of Operating Work Indices in Controlled Grinding Circuits - A Proposed Concept

    Tonnes per Hour - Kilowatts per Tonne Tonnes of Mesh Size Produced Kilowatts per Tonne of Mesh Size Produced - Terms often heard in discussions of grinding mill and grinding circuit performance. Al

    Jan 1, 1978

  • AUSIMM
    Rehabilitation Following Mineral Sand Mining On North Stradbroke Island, Queensland

    North Stradbroke Island is a large sand mass offshore from south east Queensland. Dredging for mineral sands commenced there in 1956 and the rehabilitation discussed in this paper was commenced in

    Jan 1, 1976

  • AUSIMM
    A Resume of the Results of Iron Ore Exploration in Western Australia

    The results of iron ore exploration in Western Australia between '1961 and 1964 are outlined, with particular.reference to the Hamersley Iron Province. Exploration during: these three years has

    Jan 1, 1964

  • AUSIMM
    Rio Tinto Floating Module

    By N Vagias, R Shaw, M Coghill, W Easman

    Rio Tinto Technology and the Rio Tinto Foundation for a Sustainable Minerals Industry have funded the development of a practical floating module that can reduce water losses through evaporation from w

    Jan 1, 2006

  • AUSIMM
    A New Efficiency Index for the Evaluation of Separator Performance

    By M M. Tarshan

    Separator performance is evaluated by the so-called separation efficiency. The concept of efficiency in mineral dressing operations must be interpreted with considerable care. Although qualitative use

    Jan 1, 2000

  • AUSIMM
    Shaft Hoisting Based on Direct Torque Control Technology

    By Y Wu, F-J Ping

    Today, coal production accounts for about 65 per cent of the nationÆs gross energy in China. By the year 2010, the output of coal is planned to increase to 1.65 billion tonnes and by the year 2020 to

    Jan 1, 2005

  • AUSIMM
    Gold Mill Expansion at Kambalda

    The design, construction and operation of a 500,000 tonne per year Carbon-In-Pulp (C.I.P.) plant at Kambalda embracing the period from 1980 to 1982 has been previously discussed (Sceresini, 1982).Sinc

    Jan 1, 1984

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    The Introduction and Use of a Mine Monitoring System at Isa Mine

    By Budd B

    this paper outlines the operating advantages gained through applying a mine processor (MISA), to various underground and surface operations. On the surface, MISA monitors and/or controls ventilati

    Jan 1, 1988

  • AUSIMM
    Dore Metal Production with a Top Blown Rotary Converter

    In 1985 a 2.5-tonne top blown rotary converter was installed in the silver refinery at Cominco's Trail Operation to carry out the final cupellation of burndown metal to Dore metal. The furnace

    Jan 1, 1989

  • AUSIMM
    Industrial Application of Natural Gas

    Natural gas was introduced to the Melbourne reticulation system in April 1969 and since that date sales to industrial consumers in the Gas & Fuel Corporation of Victoria area of supply, have increase

    Jan 1, 1970

  • AUSIMM
    Pelletisation of Coal Fines: An Experimental Study

    Modern mining and coal cleaning techniques lead to the generation of large quantities of fines which give rise to problems in their storage, handling, transportation and further processing. Pelletisat

    Jan 1, 2000

  • AUSIMM
    The Osborne Cencentrator

    By Hall K

    The Osborne copper gold mine, 100 per cent owned by Placer Pacific Limited, is situated 195 kilometres south east of Mount Isa. The orebody is broadly categorised into three main ore zones; oxide, t

    Jan 1, 1997

  • AUSIMM
    Risk Management Action

    Two examples of risk assessment and risk management in action are discussed. The first is in a management context in relation to Kingsgate Consolidated LtdÆs Chatree operation in Thailand. Kingsgate h

    Jan 1, 2004

  • AUSIMM
    Mineralogy Controlling Metallurgy at Ernest Henry Mining Revisited

    By S Strohmayr, R Harvey, A See

    Ernest Henry Mining Pty Ltd started production in August 1997. The Ernest Henry orebody consists of two distinct parts, a complex supergene ore zone overlying a primary ore zone. The economic copper m

    Jan 1, 2003