Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Abstract-Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited ab

    Jan 1, 1992

  • CIM
    Utilizing Advanced Maintenance Practices and Information Technology to Achieve Maximum Equipment Reliability

    By Gino Palarchio

    Dofasco is Canada?s 2nd largest steel manufacturer producing 4.5 million tons of flat rolled steel per year. They have revenues of over $3 billion and employ 7,000 people in their Hamilton, ON plant.

    May 1, 2001

  • CIM
    NASA Lunar Mining and Construction Activities and Plans

    By Gerald Sanders

    Presentation Topics ? We?re Going to the Moon Again? ? What is Lunar Mining ? In-Situ Resource Utilization? ? What Are The Challenges to Lunar Mining? ? What is NASA Currently Doing?

    May 1, 2009

  • CIM
    Lead and Zinc in Canada

    By T. W. Bingay

    The production of both lead and zinc in Canada has steadily increased during recent years until today Canada ranks among the world's leading producers of both of these metals. The high prices whi

    Jan 1, 1927

  • CIM
    Guidelines for Use of Tensile Data in the Calculation of the Hoekbrown Constant mi

    By S. A. L. Read

    "The intact rock constant, mi, is one of the three basic input parameters required for the widelyused Hoek-Brown failure criterion. Values for the constant should ideally be determined by statistical

    Jan 1, 2015

  • CIM
    Structural and Electronic Properties of Smithsonite and Cerussite: A DFT Simulation

    By Y. Q. Li, X. H. Long

    In this work, structural and electronic properties of smithsonite (ZnCO3) and cerussite (PbCO3) as the typical lead-zinc oxide minerals is simulated by means of DFT. The calculated results could be co

    Jan 1, 2015

  • CIM
    The start-up and operation of the Gibraltar Mines SX-EW Plant

    By J. C. O'Rourke

    "Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time, over 140 million tons of waste and low-grade material has been placed on the mine waste dumps. Labora

    Jan 1, 1988

  • CIM
    Fabrication-Induced Degradation and Safety Assessment for Pipelines During Service

    By AN. Kumar

    Two fabrication stages in the manufacture of pipelines are identified as causing significant deterioration of the steel plates, namely cold bending and welding. The objectives of this work include qua

    Jan 1, 2005

  • CIM
    Fabrication-Induced Degradation and Safety Assessment for Pipelines during Service (d46b60f3-6ad7-4dd3-96b6-360981a83f59)

    By A. N. Kumar

    Two fabrication stages in the manufacture of pipelines are identified as causing significant deterioration of the steel plates, namely cold bending and welding. The objectives of this work include qua

    Jan 1, 2005

  • CIM
    Asbestos, A Mineral of Unparalleled Properties

    By M. S. Badollet

    INTRODUCTION THE DEMAND for general knowledge on asbestos fibres has increased considerably in recent years. A few publications have printed data showing some of the physical and chemical prupertie3

    Jan 1, 1951

  • CIM
    Uranium-Enriched Bedrock in the central Wopmay Orogen: Implications for Uranium Mineralization

    By Louise Corriveau, Bronwyn Azar, Valerie A. Jackson, Luke Ootes, Jeff Harris

    We use the results of new bedrock mapping, combined with geochemical point data and airborne radiometric data (in particular equivalent uranium concentrations) to help determine which geological units

    Jan 1, 2013

  • CIM
    Nutrien Allan Potash Shaft Concrete Liner Remediation

    By D. R. Murray

    "In 2017, Nutrien Allan Potash remediated a portion of the concrete liner in the production shaft. A set of underslung work platforms and collection boxes were used in conjunction with hydraulic split

    Jan 1, 2019

  • CIM
    National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should Know (fdf6bc75-a015-4258-b9f1-843a33252276)

    By Tony Lipiec, Greg Gosson

    "When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun

    Jan 1, 2003

  • CIM
    Hydrogenation of Crotonaldehyde by Nanoparticles of Gold Supported on TiO2 Prepared by Deposition-Precipitation with NaOH and Urea

    By Rodolfo Zanella

    Au/TiO2 catalysts prepared by deposition-precipitation with NaOH (DPN) (~3 wt%) and urea (DPU) (~8 wt%) were tested in crotonaldehyde hydrogenation at atmospheric pressure. There is no differences in

    Oct 1, 2003

  • CIM
    Inclusion Evolution in Ti-Stabilized 17Cr Austenitic Stainless Steels Produced by Ingot Casting

    By Mansoor Barati, Xue Yin, Yanhui Sun, Alex McLean, Yindong Yang

    The formation and evolution of inclusions in Ti-Stabilized, 17Cr Austenitic Stainless Steel produced by the ingot casting process were investigated through systematic sampling of liquid steel and roll

    Jan 1, 2015

  • CIM
    The Reduction of Pressure Gradients in Oil Pipelines

    By M. E. Charles

    The use of water flowing as a lower layer to reduce pressure gradients in petroleum pipelines was investigated using 17.5 deg. A.P.I. Lloydminster crude oil in a 1-inch laboratory pipe-line and a 21h-

    Jan 1, 1960

  • CIM
    The Present Situation in the Mining Industry of New Brunswick

    By W. J. Wright

    Summary This paper describes the general situation of the mining industry in New Brunswick, and gives a detailed description of the recent developments in the antimony deposits at Lake George and the

    Jan 1, 1931

  • CIM
    Laboratory Investigation of Hydraulic Fracture Growth through Weak Discontinuities with Active Ultrasound Monitoring

    By James Kear, Romain Prioul, Robert G. Jeffrey, Andrew P. Bunger, Dimitry Chuprakov

    "Unconventional gas and geothermal reservoirs are typically naturally fractured and therefore the challenging problem of hydraulic fracture (HF) growth through naturally fractured rocks is an importan

    Jan 1, 2015

  • CIM
    Relationships between some Microstructural Features and Tensile Mechanical Properties of a Directionally Solidified Hypereutectic Al-15si-1.5mg Alloy

    By Amauri Garcia, Rodrigo Valenzuela Reyes, Noé Cheung, José Eduardo Spinelli, Leonardo Fernandes Gomes, Rafael Kakitani

    "The present research work deals with directional solidification (DS) of both Al-15wt.%Si and Al-15wt.%Si-1.5wt.%Mg alloys and further characterization of the related microstructures. The growth of re

    Jan 1, 2017

  • CIM
    Safety and Productivity Improvement at Falconbridge's Strathcona Mill

    By A. J. Giroux

    "The use of Ishikawa cause and effect diagrams in an analysis of requirements for improving safety and productivity at Falconbridge's Strathcona Mill is presented. The analysis lead to numerous small

    Jan 1, 1993