Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    CANMET'S thermodynamic ventilation network program

    By M. K. Gangal, M. A. Stoakes, A. E. Hall

    "The major features of the CANMET thermodynamic mine ventilation network program, developed by the Mining and Mineral Process Engineering Department of the University of British Columbia for the Canad

    Jan 1, 1982

  • CIM
    Sintering at Coniston

    By A. G. Roach

    Introduction The plant described in this paper is located at Coniston, Ontario, the smelting centre of the former Mond Nickel Company. Coniston is situated some eight miles east of Sudbury on the mai

    Jan 1, 1932

  • CIM
    SABC Circuit Operations at Eldorado?s Jinfeng Gold Mine

    By Yan Yang

    The Jinfeng gold mine is one of the three gold mines that Eldorado Gold has in China and it is the second largest gold mine in China. The mine is located in a relatively remote and mountainous area in

    Jan 1, 2012

  • CIM
    An overview of coal activities at the Canadian Combustion Research Laboratory

    By G. K. Lee, Whaley. H., F. D. Friedrich, I. C. G. Ogle

    "IntroductionCurrent coal combustion activities at the Canadian Combustion Research Laboratory (CCRL) reflect the increasingly important contribution that coal is expected to make in meeting our futur

    Jan 1, 1980

  • CIM
    Self-Localization System for Robots Using Random Dot Floor Patterns

    By Yutaro Fukase

    Various types of service robots have recently been developed for guarding facilities, caring for the elderly, carrying objects, and cleaning buildings. As barrier-free facilities improve and their use

    Aug 1, 2013

  • CIM
    Airborne Gamma-Ray Spectrometry

    By A. G. Darnley

    "The Geological Survey of Canada is devoting consider-able effort to finding ways to make airborne radiometric measurements both quantitative and reproducible. Equipment has been designed by Atomic En

    Jan 1, 1970

  • CIM
    Beneficiation of Some British Columbia Tungsten Ores

    By J. M. Cummings

    DURING the past year, the writer has investigated the treatment of a variety of British Columbia tungsten-bearing ores. Much of the test-work described in this paper was carried out in collaboration w

    Jan 1, 1943

  • CIM
    Characteristics of Modern Copper Flotation Circuits

    As part of the Australian Mineral Industries Research Association (AMIRA) P9 project, methods of characterising both the ore and the machines in flotation circuits have matured considerably over the p

    Jan 1, 2007

  • CIM
    On the Optimal Profile of a Rock Slope

    By S. Utili

    "The optimal profile of a rock slope under given geometry constraint is investigated by means of the upper bound method of limit analysis. The optimal condition corresponds to maximizing stability fac

    Jan 1, 2015

  • CIM
    Reagent Selection at the Gibraltar Mine for Improved Process Performance

    By F. Chachula, A. Molinaro

    "Sulphide mineral flotation operations continuously strive for a balance between mineralogy, mineral liberation, circuit conditions and reagent solutions to maximize the production rate and recovery o

    Jan 1, 2018

  • CIM
    Evolution of sandwich belt high-angle conveyors

    By Earl M. Frizzell, Joseph A. Dos Santos

    "Conventional belt conveyors offer an economical method for transporting materials at inclines approaching 18 degrees. Sandwich belt conveyors may be used to transport materials at high angles, to 90

    Jan 1, 1983

  • CIM
    Mine Ventilation From a Manager's Standpoint

    By Louis Frost

    MINE ventilation has for many years been the subject of intensive study by numerous investigators who have presented their findings in forms that are understandable to the average mining man, and all

    Jan 1, 1941

  • CIM
    Changes in the Converter Slag Chemistry Due to the Southern Peru Ilo Smelter Modernization

    By J. Suarez Condezo, E. Herrera Alarcon

    The Ilo Smelter Modernization Project will require treating the slag from the Peirce Smith converters in Slag Cleaning Furnaces using pig iron technology. Currently the slags from the converters show

    Jan 1, 2007

  • CIM
    Hydrometallurgical Processing of Telfer Concentrates: Accepting and Winning the Challenge

    By D. Lunt

    Telfer bulk concentrates typically contain 8% chalcopyrite, 8% chalcocite, 45% pyrite and 80-120 g/t gold. Although very high copper and gold recoveries can be obtained by subjecting the concentrate t

    Jan 1, 2004

  • CIM
    Removal of Fluoride and Chloride from Direct Lead Smelting Dust by Alkaline Washing

    By B. Jin

    Removal of fluoride and chloride by alkaline washing from direct lead smelting dust which originated from an Ausmelt furnace is reported. The results show that the fluoride removal efficiency increase

    Jan 1, 2014

  • CIM
    An Efficient Recycling Process of Rare Earth Metals Using Ionic Liquids

    By M. Goto, F. Kubota

    "In this study, we show the successful separation of rare earth metals, which are indispensable elements for the high-tech industry, from a solution containing a metal mixture by using a liquid-liquid

    Jan 1, 2012

  • CIM
    Selective Leaching of Gold from an Oxidized Copper-Gold Ore by Stage Cyanide Addition: Experimental Study and Industrial Application

    By P. L. Li, B. X. Song, C. H. Wang, T. Wang, Z. Hu

    "The treatment of an oxidized copper-gold ore by stage cyanide addition was investigated. For cyanidation, free cyanide ion concentration can be an indicator of whether there is copper dissolved in cy

    Jan 1, 2016

  • CIM
    High-Temperature Deformation Of Fe3Al

    By A. N. Shen

    Fe3A1 intermetallics are potential inexpensive candidate for hot applications. In this project, torsion tests on hot-rolled and annealed Fe3A1 (Fe-15.5A1-5.8Cr-1.0Nb¬0.05C) were carried out over the r

    Jan 1, 2007

  • CIM
    An Alternative Approach to Turam Data Treatment

    By K. Duckworth

    The treatment of Turam data by conventional procedures does not permit the interpreter to make any estimate of induced current magnitudes. This problem may be overcome by using an alternative data tre

    Jan 1, 1973

  • CIM
    A Study of the Factors Present in Planning the Ventilation Needs of Diesel Vehicles in Operating Mines in Quebec

    By R. B. Fermor

    "AbstractAttention is drawn to the ventilation problems arising from the use of diesel vehicles underground, especially in view of the fact that diesel fumes in combination with other pollutants may b

    Jan 1, 1977