Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of Gold-Sponge Catalysts for Lean-Burn DeNOx
By Gary Pattrick
A new class of spongy Au catalysts is studied for the selective catalytic reduction of NOx by propene under leanburn conditions. The spongy catalyst is an unsupported powdered Au that consists of micr
Oct 1, 2003
-
Failure Mechanism of Resin-Anchored Rebar in Potash
By D. Neely, D. Milne, L. R. Feldman
"Resin-anchored rebar is commonly used for rock support in mining. The rock properties and environment determine the average bond strength, allowing mine engineers to select the appropriate length and
Jan 1, 2016
-
La Mine Doyon mill expansion
By G. H. Hope, A. R. Maycock
"La Mine Doyon is a gold mining operation located in northwestern Quebec, approximately 35 km east of Rouyn-Noranda and 85 km west of Val d'Or. The mine is jointly owned by Lac Minerals Ltd. and
Jan 1, 1988
-
Gold-bearing veins around a felsic stock near Wawa, Ontario: implications for gold exploration
By P. A. Studemeister
"A trondhjemite stock intrudes a volcanic sequence that has massive sulphide lenses and that is metamorphosed to the greenschist facies at Gutcher Lake, 25 km north of Wawa, Ontario. The stock is 4 km
Jan 1, 1985
-
Volcanic arc Stratigraphy and U?Pb Geochronology of Devonian to Carboniferous Rock Sequences; Oyu Tolgoi porphyry Cu-Au district, South Mongolia
By Alan J. Wianwright
Introduction ??New world-class Upper Devonian porphyry Cu-Au system located in south Mongolia ??6.5 km NNE-trending mineralized corridor ? 4 discrete deposits ??Southern Oyu deposits: Chalcopyrite,
May 1, 2006
-
Acceleration of Project Schedule for Targeting Early Revenue Streams
By Zia Pirzada
"Time is of the essence" and "Time is money" These are powerful and true statements during a project life cycle and have far-reaching implications on the success and failure of the project Time and p
Oct 1, 2010
-
Fraser Mine Material Handling System
Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are
Feb 1, 2008
-
Evolution and Optimization of the Gravity Recoverable Gold Test (e99ef368-b956-4514-b763-0f43ee32fd51)
By S. Koppalkar
ABSTRACT: The development and evolution of the gravity recoverable gold (GrG) test procedure at McGill university is reviewed in this paper. Since the late 1980s, the research group led by the late Pr
Jan 1, 2010
-
Cyanide Destruction (Gold Mill Effluents)
By C. J. Edmonds
Of the gold mined in Canada over 90 percent is extracted from the ore by the process of "cyanidation". In this process crushed ore is treated with lime to provide "protective alkalinity" and cyanide,
Jan 1, 1973
-
Level and Solids Profile Detection in Thickeners
By A. Probst, J. A. Finch
"Solids concentration (% solids) profiles and the clear liquid/slurry interface level (mudline) were determined from conductivity measurements in thickeners at Falconbridge' s Strathcona mill (Ni conc
Jan 1, 1993
-
Gold exploration success along structural trends in the Sicker Group of Vancouver Island, British Columbia
By G. R. Cope, J. S. Getsinger, K. D. Lund, T. Neale
"Mineral exploration in the Sicker Group, a belt of Paleozoic volcano-sedimentary rocks on Vancouver Island, has traditionally centred on auriferous polymetallic volcanogenic massive sulphide deposits
Jan 1, 1990
-
Sirovision ? An Integrated 3D Mapping Solution Developed in conjunction with Xstrata Nickel for the Nickel Rim South Project
By John W. Korczak
The use of geological and grade block models has been standard practice in mine design for many years now, with a wide range of software available for creation and analysis. Although geotechnical para
May 1, 2009
-
Improved Operational Performance Through Information Management ? A case Study from Rio Tinto?s Northparkes Mines
By Jeff Smith
Agenda About NORTHPARKES The NEED The INITIATIVE The SEARCH The PRODUCTS The SOLUTION The RESULTS The Northparkes copper-gold mine in Central Western NSW commenced operations in 1994. Copp
May 1, 2006
-
Nature and origin of mineraI occurrences inside the Sudbury Basin
By D. H. Rousell
"Rocks of the Whitewater Group (Aphebian age) oc ithin the Sudbury Basin and consist of three formations rre, from oldest to youngest: Onaping, heterolithic breccias lus an igneous-textured component;
Jan 1, 1984
-
Microbial Succession and Regulation during Heap Bioleaching of Copper Sulfides
By H. Y. Sun, Q. Y. Tan, X. P. Niu, L. Li, Y. Jia, R. M. Ruan
During bioleaching processes of sulfide minerals, the sulfide minerals act as the natural habitats for acidophiles, of which, most are autotrophic iron and sulfur oxidizing microbes. These microbes ac
Jan 1, 2019
-
Design and control of large hydraulic backfill pours
By John D. Smith, Robert J. Mitchell
"There is a world-wide trend toward underground bulk mining methods employing hydraulically placed backfill. This trend is recent and therefore there is little in the literature to assist an operator
Jan 1, 1982
-
Mass Transfer in the Processes of Cascade Separation of Bulk Materials
By E. Barsky
"Theoretical notions of mass transfer processes in cascade separation of bulk materials have not been adequately developed as yet (Barsky M.D. 1980). In this paper we have derived linear difference eq
Jan 1, 2016
-
New triangular raise cribbing technique for rockburst prone backfilled stopes
By J. H. Archibald
"In mines employing cut-and-fill stoping (sand fill), ore passes are built as mining progresses upward. These ore pass raises are generally made from timber and form a vertical ""chimney"", like a ver
Jan 1, 1991
-
Electrolytic Refining of High Ni Copper Anode at the Tank House in Naoshima Smelter and Refinery
By Osamu Inoue, Takashi Yamashita, Takashi Ikemoto
The expansion project in Naoshima smelter and refinery to meet enhancing recycling business of E-scrap was successfully completed in 2016 to have a capacity of 110,000 tpa of E-scrap treatment. Increa
Jan 1, 2019
-
Fine and Coarse Particles Flotation - Theory and Practice: How to Improve Recovery?
By Hamid-Reza Manouchehri
Coarse particles flotation is controlled by detachment (particle hydrophobicity and flotation cell turbulence) For composite particles (the bubble may attach to good hydrophobic region, but the expa
May 1, 2013