Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A New Alternative to Cyanidation: Biocatalyzed Bisulfide Leaching

    By David W. Mogk, Tamara Darsow, Macgregor L. Fogelsong, Robert M. Hunter, Frank M. Stewart, Edwin H. Abbott, Courtney A. Young

    Abstract: Development of cost-effective techniques for recovering precious metals from their ores has been the goal of metallurgists for hundreds of years. Today, metallurgists are increasingly called

    Jan 1, 1998

  • CIM
    Optimization of a Tilt Poured Permanent Mold Casting via Solidification Modeling

    By Bernard Tougas, Franco Chiesa, David Levasseur, Bernard Duchesne

    "In the present paper, the optimization of a tilt poured permanent mold will be carried out using filling and solidification modeling. This exercise resulted in 3 modifications of the initial mold des

    Jan 1, 2014

  • CIM
    Earth Moving Equipment Safety Round Table - The EMESRT Story (2006-2008)

    Mining companies around the globe have long struggled with the need to ensure that earth moving equipment is designed to be operated and maintained under all site conditions without causing harm to pe

    May 1, 2009

  • CIM
    Revegetation of the Waite Amulet Tailings Discharge Areas

    By B. W. Brooks

    "After an extensive period of University research and field trials, large scale reclamation of the Waite Amulet tailings discharge areas commenced in the spring of 1978. The Noranda program consists p

    Jan 1, 1981

  • CIM
    Evaluation Of Uses-Lca Model For Deriving Life Cycle Impact Characterization Factors For Metals

    By W. J. Adams

    It is recognized that within life cycle assessment that the eco-toxicity potentials (TPs) derived for metals require additional research to improve their reliability. Current models used to develop TP

    Jan 1, 2007

  • CIM
    Numerical Modelling of Rock Fracture with the Embedded Discontinuity Approach Incorporating Heterogeneity

    By T. Saksala

    In this paper, the embedded discontinuity approach is applied to finite element modeling of rock fracture. A rate-dependent constitutive model based on the embedded displacement discontinuity theory i

    Jan 1, 2015

  • CIM
    Modeling of Change of Coal Permeability Induced by Gas Adsorption

    By C. J. Li, J. L. Feng

    In the present study we focuses on developing the poroelasticity model that deals with adsorptioninduced permeability change mostly occurred in porous media constituted several phases such as coal. Th

    Jan 1, 2015

  • CIM
    Hydrogeochemical Investigation of the Reactive Tailings at the Waite Amulet Site, Noranda, Quebec

    By R. Siwik, N. K. Davé

    "The national reactive tailings (RATS) program is a co-operative industry-government effort to develop practical techniques for closure of reactive tailings areas. This paper summarizes the RATS progr

    Jan 1, 1987

  • CIM
    A Comparative Study of Two Centrifugal Concentrators

    By A. R. Laplante

    "In this paper, the performance of the Knelson Concentrator and of the batch and continuous Falcon Concentrators are compared. The units are based on different operating principles, and as such they p

    Jan 1, 1993

  • CIM
    The 425 Project - Dealing with SO2

    By Éric Côté

    Introduction The 425 Main Ore Zone ? Block of ore partially mined in the late sixties; ? Area was sealed off for over 30 years due to SO2 emissions from oxidizing fill material; 425 Project goal

    Feb 1, 2008

  • CIM
    On-line developments at the BCL smelter

    By G. A. Highcock

    "Operations started at BCL in December 1973J and the smelter is currently in the seventh year of its fifth campaign. The next major shutdown is scheduled for 1995. During the current campaign, a numbe

    Jan 1, 1995

  • CIM
    A Dynamic Simulator for Evaluating Control Schemes in an Industrial Scale Rod Mill-Ball Mill Grinding Circuit

    By A. J. Neale, B. C. Flintoff

    "A review of the dynamic rod mill-ball mill grinding circuit simulator developed at the University of Alberta, highlighting the modular structure and open-ended design, demonstrates the ease with whic

    Jan 1, 1988

  • CIM
    Effect of Static Precipitation on Microstructue and Texture of Warm Rolled Mg-Al-Sn Alloy

    By A. S. H. Kabir, I-H. Jung, J. Su, S. Yue, M. Sanjari

    The final mechanical properties of wrought magnesium alloys are mostly controlled by microstructure and crystallographic orientation or texture. In common magnesium alloys, grain coarsening occurs dur

    Jan 1, 2014

  • CIM
    Depression of Pyrite by Metabisulfite and Sulfite Ions in Seawater and Fresh Water

    By Leopoldo Gutierrez, Sergio Castro, Lina M. Uribe, Janusz S. Laskowski

    "The effect of sulfite and metabisulfite ions on the amyl xanthate flotation of copper-activated pyrite, in distilled water and seawater, has been studied by micro-flotation tests and redox potential

    Jan 1, 2016

  • CIM
    Kearl Oil Sands Project Overview

    By Scott Hommema

    ? Bitumen in the oil sand averages Bitumen 12 wt%; water makes up 4 wt% ? Imperial Oil (operator) and ExxonMobil developing Kearl Leases #6, 36, 87 (~200 sq. km) ? Target resource > 4 Billion Bar

    May 1, 2008

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - On the Nature of Lipids in Hydrothermal Formations at the Broken Spur and the Vent Field of the Mid-Atlantic Ridge

    By V. I. Peresypkin, A. Y. Lein, N. S. Bortnikov, Yu. A. Bogdanov

    "Abstract - The lipid component in hydrothermal deposits of the Logachev vent field, at 14°45_N of the Mid-Atlantic Ridge (MAR) and Broken Spur vent field, at 29°N of the MAR, was studied. Biochemical

    Jan 1, 1999

  • CIM
    Grade Control and the Life of Mine Plan

    By Mike McKevitt

    We are trying to promote a concept and a change in management?s approach to the iterative process of grade control. This is important as grade control must routinely try and achieve the long term obj

    May 1, 2009

  • CIM
    Characterization of Mineralization in the Sullivan-North Star Corridor and Enhanced Exploration for Other Mineral Deposits in the Purcell Basin, Southeastern British Columbia: Application of High-resolution Airborne Geophysics

    By D. A. Brown, C. Lowe

    "Abstract -A multi-sensor (electromagnetics, magnetics, gamma-ray spectrometry, and VLF) geophysical survey was recently conducted in the Purcell Basin of southeastern British Columbia in an area enco

    Jan 1, 1998

  • CIM
    Optimized Ventilation Ventilation-On On-Demand (VOD)

    By Michel Masse

    1. A battery-powered wireless mesh network for dynamic diesel machinery tracking and operating status monitoring. 2. A real-time ventilation model and fan speed optimizer. 3. An OPC server for infor

    Feb 1, 2008

  • CIM
    Energy Conservation at Inco Metals Company: Compressed Air in Underground Mining

    By J. G. Cullain

    In conjunction with the over-all goals of energy conservation at Inco Metals Company, a program of improvement in compressed air utilization was established. Air flows were monitored and compared to c

    Jan 1, 1979