Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    A Comprehensive Blast Damage Control Plan for The Missing Link

    By Alvin D. Christmas

    The missing link is a connector between the congested downtown area of Knoxville, Tennessee adjacent to the former World's Fair site, the I_40 I_75, and Western Avenue traffic arteries. This connecter

    Jan 1, 1995

  • ISEE
    Solid Medium Controlled Blasting Technique and Its Application

    By Xue Yongpeng, Zhu Zhenhai, Zhu Ming

    The purpose of the Solid Medium Controlled Blasting Technique and Its Applications is to have the inside of the vessel-shaped framework (e.g: oil tank , water pool, gas chamber, chimney, water tower,

    Jan 1, 2000

  • ISEE
    Seismic Waves caused by Reinforced Concrete Decks impacting the Ground

    By Andrea Francioso, Roberto Folchi

    In order to comply with the latest European Highway Standards, the highway Salerno - Reggio Calabria, in southern Italy, had do be widened and upgraded to reduce its vulnerability to earthquakes. Rein

    Jan 1, 2013

  • ISEE
    Response Of Typical Wall Panels To Debris And Fragment Impact

    By John Tatom, Michelle Crull, Robert Conway

    The US Department of Defense Explosives Safety Board is sponsoring the development of a risk-based explosives safety siting program, SAFER. The fragment and debris hazard generated at the potential ex

    Jan 1, 2010

  • ISEE
    Electronic Detonator Failed by Electromagnetic Waves Emitted on Detonation of Nearby Explosive Charges

    By Tuan Nguyen, Dirk Hummel, Ruilin Yang

    In a tunnelling site in Japan, it was found that detonators failed to initiate with their shells and primary explosive intact. Their capacitors, however, were discharged due to some damage on the appl

    Feb 6, 2023

  • ISEE
    Journal: 100 Years / MILITARY ENGINEERING (PART IV) MINING AND DEMOLITIONS General Staff, War Office, 1910 LONDON Copyright

    By Robert Hopler

    SECTION 9.---BORING AND BLASTING.*155. Blasting is the operation of bringing down and detaching from its bed or position masses of material by means of explosives.

    Jan 1, 2011

  • ISEE
    A Discrete Element Code for Diggability Analysis

    By Stephen Chung

    The quality of a blast design can be evaluated in many ways. It may involve fragmentation, muck profile, environmental effects in terms of vibration and the excavation of the blasted material. To assi

    Jan 1, 2008

  • ISEE
    Sequence of Events During a Blast

    By Favreau R. F. Ph. D, Favreau Patrice

    The article explains that the way to achieve a successful blast is by insuring that the explosive energy divides properly into the weakening action of the shock wave which is necessary to prevent larg

    Feb 1, 2020

  • ISEE
    Controlled Drilling and Blasting at Yucca Mountain - Design Implementation, Confirmation

    By Edward Fitch

    The DOE is evaluating Yucca Mountain, Nevada as a potential site for disposal of high level nuclear waste. Yucca Mountain is located approximately 160 km northwest of Las Vegas on the western edge of

    Jan 1, 2000

  • ISEE
    Improvement of Safety Practices for Loading of ANFO-based Explosives in Zones with Reactive Rocks in Chile

    By María Virginia Ramírez, Alejandro Alarcón, Alea Reyes

    Reactive grounds (presence of FeS2, CuFeS2) can create hazards in a mine; misfires to premature deflagration or detonation of loaded blast holes. This occurs because some minerals can react to ANFObas

    Jan 1, 2018

  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • ISEE
    Factors Affecting Anfo Fumes Production

    By Richard Mainiero, James H. Rowland III

    For many years there have been small scale tests available for evaluating the toxic fumes production by capsensitive explosives (DOT Class 1. l), but these could not be used with blasting agents due t

    Jan 1, 2000

  • ISEE
    The environmental impact of AN prills on emulsion explosives

    By D. Johansson, C. San Miguel, U. Stenman, N. Petropoulos

    Blasting is a commonly utilized method in civil engineering projects and mining operations. Ammonium nitrate-based (AN-based) explosives are the most efficient explosives today in terms of handling an

    Jan 1, 2024

  • ISEE
    Use of Electric Field Measurement and a Weather Data Service for Lightning Warning at the US Bureau of Mines' Pittsburgh Research Center

    By Lon D. Santis

    This paper describes a lightning warning system (LWS) in operation at the U.S. Bureau of Mines' (USBM) Pittsburgh Research Center (PRC) from December, 1989 to April, 1991. An electric field mill measu

    Jan 1, 1993

  • ISEE
    Demolition Using Water-Cased Kicker Charges

    By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel

    Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte

    Feb 6, 2023

  • ISEE
    Prediction of Ground Vibrations Using Neural Network in a Peruvian Mine

    By Pavel A. Torres, Darwin Torres, Sandro Huaman

    Given the limited efficiency of blast-induced ground vibrations prediction empirical models, due to the complex geological system from a Peruvian mine. An artificial neural network was built in order

    Feb 1, 2020

  • ISEE
    Adjusting Blasting to Increase SAG Mill Throughput at the Red Dog Mine

    By N. Paley

    An engineering project was undertaken at the Cominco Alaska Red Dog Mine to determine the extent that Semi-Autogenous Grinding (SAG) mill throughput could be increased by blasting differently. The Jul

    Jan 1, 2001

  • ISEE
    Reactive Ground Blast Management in a South Africa Open Pit Manganese Mine

    By Grant Small, Deon Pieterse

    Reactive ground conditions at an open pit manganese mine in the Northern Cape of South Africa resulted in an unexpected detonation.

    Feb 1, 2020

  • ISEE
    Seismic study to understand the pre-splitting filter capacity

    By Julio Cesar Barbosa de Freitas, Rafael Gonçalves Araujo, Túlio Soares, Jair Koppe, Augusto Ferraz Ribeiro, Pedro Barreto Garcia

    This study thesis was motivated by the fact that it is of fundamental importance for open pit mining that the slopes initially have a geometry in accordance with what is proposed in the mining plannin

    Jan 21, 2025

  • ISEE
    Low Cost Method for monitoring Shock-Tube Detonator and Explosive Product performance in Blast holes.

    By W. Birch, G. D. Rangel-Sharp, L. Bermingham

    For many years, the accepted method of Measuring the Velocity of Detonation (VOD) in blast holes has been to use an electric cable of a constant resistance per metre. Thus as the wire is consumed by t

    Jan 1, 2011