Analysis Of Failure Modes For Fully Grouted Resin Bolts
By K. Heasley, A. Yassien, A. Khair, S. Peng
There are three major components of a fully grouted roof bolt which primarily determine its ability to develop and sustain load: the steel rebar, the resin annulus, and the rock/grout interface. The u
Jan 1, 2004
-
GPS For Machine Guidance Improves Safety at Borax Mine
U.S. Borax’s mine in California’s Mojave Desert is the source of nearly half the world’s supply of refined borates. These minerals are used in hundreds of products, including essential plant nutrient
Jan 1, 2004
-
Introducing a new mine ventilation design method by integrating discreteevent mining process simulation and ventilation simulation - SME Transactions 2018
By K. C. Kocsis
Underground ventilation systems, which require electricity to operate the fans and fossil fuel for heating in winter, can account for a significant portion of the energy consumption of mines. Recent s
Jan 1, 2018
-
Ways To Deal With Mine/Plant Effluent Residues: A Roadmap Process
By K. Tabra
In a mine operation, the proper strategy to handle residues is one of the main concerns, in particular when dealing with mine/plant liquid effluents. Most active water treatment systems at metal mines
Feb 27, 2013
-
Milling of Integrated Sulfide-Oxide Ores
By Paul M. Jr. Musgrove, Thomas D. Henderson, Mark B. Nesbitt
Introduction History. Vat leaching operations began in October 1953. Since that time, about 4.2 million tpy of oxide ore averaging 0.72% copper have been treated. Economic conditions, improved operat
Jan 1, 1985
-
Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of Design
By Jimmy Thompson
The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const
Jan 1, 2008
-
Tamerlane Hoist And Vertical Belt Project
By Shawn Collins
BACKGROUND The history of the Pine Point Mine is a rich one. This property once boasted one of the largest and most profitable lead-zinc mines in Canada's long and storied mining history. The Pi
-
Mine Production Scheduling Optimization At Newmont?s Twin Creeks Mine
Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore
Feb 27, 2013
-
An Analysis Of Fiber-Reinforced Round Panel Strengths And Comparison To Wire Mesh Bag Strength
Researchers at National Institute for Occupational Safety and Health (NIOSH) are investigating how fiber-reinforced shotcrete mix designs can be extrapolated from proven designs employing wire mesh.
Jan 1, 2010
-
Coal Dust Wettability: It?s Role In Dust Control And Its Determination
By K. Mondal
A macroscopic approach integrated with microscopic analyses for wettability characterization is presented. Wetting depends on 1) Contact between the dust and the fluid droplets, 2) Wettability of the
Jan 1, 2012
-
Exploratory Shafts For The Nuclear Waste Repository In Basalt
By Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987
-
Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) Stresses
By John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw
An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac
Jan 1, 1979
-
Geolocation for Underground Coal Mining Applications: Classi?cation of Systems
The ability to track miners and communicate with them while they work in underground coal mines is important during normal daily operation, and critical in emergency conditions. This was evident durin
-
Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone Technology
By R. Bokotko, J. D. Miller, J. Hupka
Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption
Jan 1, 2002
-
The Optimum Production Equipment Scale For Open Pit Coal Mining
The trend for using larger equipment in open pit mining to achieve cost effectiveness raises the question about the optimum economic point of scale in the current world of globalization. The present p
Jan 1, 2004
-
The Geology of the Main Pass Sulphur and Oil Deposit
By A. F. Edwards
The Main Pass sulphur and oil deposit is located at Main Pass Block 299 in the Gulf of Mexico, 30 miles east of Venice, Louisiana, in 210 feet of water. The deposit was discovered by Freeport-McMoRan
Jan 1, 1992
-
Determination Of The Practical Spacing Between Holes For The Expansive Mortars Utilization In Dimension Stone Quarries
By E. Bakhtavar
Finding a ?practical spacing between the holes? for use of the expansive mortars is an important problem in dimension stone quarries. Objective has been to first introduce a relationship between this
Jan 1, 2011
-
Hydraulic Parameter Estimation From Metallurgical Column Test Data
By C. Green, J. Uhrie, C. Filippone, A. Guzman
A central aspect of heap leach management and recovery optimization is solution control. Insofar as each heap is unique in physical and metallurgical properties, it is essential to understand the hyd
Jan 1, 2002
-
Bucket Wheel Stacker-Reclaimers, A Survey Of Progress In The U.S.A.
By W. L. Price
Since first introduced in the United States in 1964, rail mounted bucket wheel stacker-reclaimers have gained wide acceptance by users. The coal burning power plant group has adopted this new storage
Jan 1, 1969
-
Sludge Dewatering By Pressure Filtration At Martin County Coal Corporation
By Raymond A. Bradbury
Martin County Coal Corporation's operations are located on Wolf Creek in Martin County in the eastern part of Kentucky. The mining complex was started in 1971 and has grown to a 2.273 Mt/a steam
Jan 1, 1981