Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
No. 7 subway line project advances with Atlas Copco rigs and tools
By Scott Ellenbecker
Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par
Jan 3, 2010
-
Influence of highwall mining progression on web and barrier pillar stability
By M. J. Raffaldi, K. W. Harris, K. A. Perry
"Highwall miners have been widely used to extract additional coal reserves from existing surface operations, particularly on contour operations in the Appalachian coalfields. Using a continuous miner
Jan 1, 2014
-
Niagara Tunnel Project
By Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
Florida Phosphate Matrix Pump And Pipeline Operating Efficiencies
By G. R. Addie
While the cost of transporting raw phosphate matrix from a pit to a processing plant via slurry pipelines is more efficient than it could be by rail cars, conventional trucks or belt conveyors, it sti
Jan 1, 1998
-
Radial pick cutting performance in dry and saturated sandstone - SME Transactions 2012
By L. S. Gertsch, M. Z. Abu Bakar
Linear cutting tests of a porous sandstone with a radial drag pick show that saturation of rock with water can increase the specific energy of fragmentation. This appears to be due, in this case, to a
Jan 1, 2012
-
Preparing A Feasibility Study Request For Proposal In The 21st Century
By G. Wahl, H. Danilkewich, T. Mann
Developers of advanced mining projects face the challenge of how to craft a “Request for Proposal for a Feasibility Study” that will result in bids that are comparable and will lead to a successful ex
Jan 1, 2002
-
Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology
By Ulf G. Gwildis
The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G
-
Evaluations Of 3m Fluorad™ Fc-gold On Gold Extraction From Production Heap Leaching At Daisy Gold Mine (Glamis Gold)
By Shawn Orser, Jennifer Waddell, Mike Sierakowski, Tom Barrett
Production evaluations were conducted at Daisy Gold Mine (Glamis Gold, formerly Rayrock), between August, 1997 and August, 1998 to quantify the effect of 3M fluorochemical surfactants (fluorosurfactan
Jan 1, 2000
-
The role of coal and CCS in energy policy and sustainable development of Turkey: Is it compatible to the EU energy policy?
By N. Sahin, K. Baris, A. Ozarslan
This paper aims to assess the current and future role of coal in energy strategy of Turkey and evaluates the compatibility of the policies to the EU energy policy and strategy. The Turkish government
Jan 1, 2011
-
The Tai Po to Butterfly Valley Aqueduct in Hong Kong
By Derek. C. Arnold
In order to meet increasing demands for water supply in the next millennium, the Government of the Hong Kong Special Administrative Region have identified the need for a major new water treatment and
Jan 1, 1999
-
Injury Prevention: Dependent, Independent, And Interdependent
By D. E. Poole
Injury Prevention: Dependent, Independent and Interdependent In recent years, management-directed (dependent)safety programs have lost ground to the more successful self-directed (independent) prog
Jan 1, 2000
-
The Construction of the Manhattan Water Tunnel, New York City ? Introduction
By Edward (Ted) Dowey
City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres
Jan 1, 2008
-
The Carbon-In-Pulp Plant Of The Masbate Gold Operations Philippines
By F. V. Antonio, R. S. Pizarro
Masbate Gold Mines, dormant since WWI I, are now back in operation. The ore treatment plant incorporates carbon-in-pulp processing, utilized because of the ready availability of coconut shell charcoal
Jan 1, 1981
-
Improved Belt Loading And The Effect On Face Production Through Moderation Of Sectional Feeder Discharge Rates (51a24299-8227-404e-b9a0-642d104f66d1)
By T. H. Combs
Increased productivity in the U.S. underground coal industry has taxed pre-existing conveyor belt haulage systems. The usual remedies are costly and can disrupt production. A reduction in the belt fee
Jan 1, 1993
-
Ressure And Flow Investigation Of An Axial Booster Fan With Variable Blade Settings ? Experimental And Cfd Approach
By A. Habibi
A study has been undertaken on two 1.12 m diameter industrial booster fans operating under different blade settings powered by a 1200 rpm motor at the Missouri University of Science and Technology. Th
Feb 27, 2013
-
Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire
By D. Bour, C. Nyikos, R. Curtice
Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti
Jan 1, 2002
-
Innovative features of the Bridger Coal Company supply air fans and system
By G. S. Takenaka
When Bridger Coal Company transformed their operations from surface mining to an underground longwall operation their plans included not only the addition of new mining equipment but also surface fans
Jan 1, 2009
-
Meandu Rising: The Second Life Of Tarong Coal Project's Meandu Mine - Introduction
By J. G. Pippenger
Rio Tinto Coal Australia (RTCA) developed Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent newly constructed Tarong Power Station (TPS). In designing the mine, RTCA
Jan 1, 2011
-
Single Bore Solution For Transit Tunnels
By Verya Nasri
The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is
Jan 1, 2010
-
Maintenance Management: Minimizing Risk to Profitability
By Paul D. Tomlingson
Modern production equipment has been designed with greater productive capacity and higher reliability to meet the rigorous operating demands of the mining industry. These improvements have also made
Jan 1, 2005