Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SME-ICGCM
    Improvements in Coal-Waste Disposal Since Buffalo Creek

    By Kelvin K. Wu

    A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m

    Jan 1, 2006

  • SME-ICGCM
    Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control

    By Sudhir Kumar Kashyap

    In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of

    Jan 1, 2012

  • SME-ICGCM
    Calibrating the Lamodel Program for Site Specific Conditions

    By Keith A. Heasley

    The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine

    Jan 1, 2012

  • SME-ICGCM
    Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner

    By Sanjay Kumar Singh

    The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas

    Jan 1, 2012

  • SME-ICGCM
    Interaction Subsidence In The Sydney Coalfield, Nova Scotia

    By Peter Cain

    The paper presents previously unpublished results derived from an unique interaction moitoring program conducted in the Sydney Coalfield of Nova Scotia. An abandoned, sealed longwall gateroad was r

    Jan 1, 1996

  • SME-ICGCM
    Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth Surface

    By F. N. Voskoboyev

    The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min

    Jan 1, 1996

  • SME-ICGCM
    Sub-Surface Ground Movements Associated With Longwall Mining

    By P. Gaskell

    The paper examines the development of rock movement between a longwall extraction horizon and the surface for a fully caved mining situation. Physical modelling has been used to examine the mechanics

    Jan 1, 1988

  • SME-ICGCM
    Study Of Coal Fragmentation Under Conical Bit Indentation (151fd177-8c94-4b7d-bb78-001df228dd2a)

    By S. J. Jung

    A fundamental study of fragment size distribution and characteristics of fracture pattern is presented for the dynamic penetration of a conical bit into coal block. In this paper, damaged zones during

    Jan 1, 1989

  • SME-ICGCM
    Cost Preventive System To Control Unstable Roof In Main Line Haulage Entries

    By John Popovich

    The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc

    Jan 1, 2001

  • SME-ICGCM
    Coal Pillar Loading Mechanisms and Progress in Pillar Design

    By David Hill

    The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations

    Jan 1, 2008

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Developments of a Prototype Borehole Profilometer to Estimate Roof-Bolt Anchorage Capacity from Borehole Roughness Measurements-Laboratory Tests

    By Mark K. Larson

    Researchers at the National Institute for Occupational Safety and Health?s (NIOSH) Spokane Research Laboratory are developing a borehole profilometer to dynamically measure the roughness pro-file of b

    Jan 1, 2007

  • SME-ICGCM
    A Simple Method Of Measuring Rock Fracture Toughness Using The Brazilian Test Method

    By H. Guo

    There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chevron -

    Jan 1, 1992

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME-ICGCM
    Rapid Assessment Of Gateroad Roof Stability By Simple Monitoring Techniques

    By Peter Cain

    In response to the appearance of excessive convergence of bolted gateroads in the front abutment zone of retreating coal faces at Phalen Colliery, staff from the CANMET Cape Breton Coal Research Labor

    Jan 1, 1996

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • SME-ICGCM
    Nonlinear Approach For Determining Design Criteria For Yield Pillar Performance

    By W. Smith

    The U.S. Bureau of Mines (USBM) is using laboratory and computer-based techniques to investigate the post- failure behavior of yielding pillars and pillar reinforcement techniques to control entry def

    Jan 1, 1995

  • SME-ICGCM
    Application Of Hilti Onestep Bolts For Roadway Support In German Deep Coal Mines

    By Michael Bayerl

    The HILTI OneStep rockbolt was implemented for roadway development in German deep coal mines in 2004. The development by HILTI Company is based on a technical joint venture with RAG Deutsche Steinkoh

    Jan 1, 2009

  • SME-ICGCM
    Detecting Strata Fracturing and Roof Failures from a Borehole Based Microseismic System

    By Tara Bajpayee

    Modern, highly productive underground mining operations need to assure the safety of their workforce by understanding where major strata fractures and roof failures could occur. Mines depend on a hos

    Jan 1, 2008